Twitter

Link your Twitter Account to Market Wire News


When you linking your Twitter Account Market Wire News Trending Stocks news and your Portfolio Stocks News will automatically tweet from your Twitter account.


Be alerted of any news about your stocks and see what other stocks are trending.



home / news releases / fortuna intersects 31 3 g t gold over 12 0 meters fr


FVI:CC - Fortuna intersects 31.3 g/t gold over 12.0 meters from the Karakara Prospect at the Diamba Sud Gold Project

VANCOUVER, British Columbia, June 25, 2024 (GLOBE NEWSWIRE) -- Fortuna Mining Corp. (NYSE: FSM | TSX: FVI) is pleased to provide an update on its exploration programs at the Diamba Sud Gold Project in Senegal.

Paul Weedon, Senior Vice President of Exploration at Fortuna, commented, “Drilling at Karakara continues to improve our understanding of the prospect’s potential, returning several high-grade intercepts including a highlight intersection of 31.3 g/t Au over an estimated true width of 12.0 meters in drill hole DSDD243. The exploration team is looking forward to utilizing the improved understanding of the geological controls on gold mineralization to further advance the regional exploration programs.” Mr. Weedon concluded, “Our focus has now moved towards progressing some of the many satellite opportunities at Diamba Sud, with highly encouraging, early-stage results such as 8.9 g/t Au over an estimated true width of 27.7 meters returned from drill hole DSR680 at Western Splay, and 2.9 g/t Au over an estimated true width of 15.3 meters returned from drill hole DSDD262 at Kassasoko. These prospects represent new opportunities for additional ounces and continue to highlight the prospectivity of the wider Diamba Sud Gold Project.”

Diamba Sud Gold Project, Senegal

Drilling at Diamba Sud has continued with the focus moving to testing and upgrading several key high priority satellite prospects (refer to Figure 1), including Western Splay and Kassasoko, as well as further work to improve the definition and understanding of the mineralization controls at Bougouda and Karakara. An additional 20,665-meter, 159-hole program has been completed at Diamba Sud since March 2024 ( refer to Fortuna news release dated March 11, 2024 ).

Results from this program will be incorporated into the ongoing project development work, with the encouraging results from Western Splay and Kassasoko expected to contribute toward growing the project portfolio and resource base, while also improving confidence in the regional geological understanding. With the tempo of drilling planned to slow across the forthcoming rainy season, the exploration team will continue to review and fine-tune the geological controls on mineralization.

Figure 1: Diamba Sud Gold Project location plan


Karakara Prospect

Infill and extension drilling at Karakara continued to define additional mineralization beyond the historic pit design, while also providing confirmatory data to help validate previous geological interpretations.


Karakara drilling highlights include:

DSDD223 :
4.6 g/t Au
over an estimated true width of 8.2 meters from 139 meters
DSDD229 :
7.0 g/t Au
23.7 g/t Au
over an estimated true width of 7.2 meters from 141 meters
over an estimated true width of 1.6 meters from 157 meters
DSDD238 :
4.3 g/t Au
over an estimated true width of 10.4 meters from 120 meters
DSDD243 :
31.3 g/t Au
87.0 g/t Au
11.1 g/t Au
1.8 g/t Au
over an estimated true width of 12.0 meters from 24 meters, including
over an estimated true width of 4.0 meters from 28 meters, and
over an estimated true width of 1.6 meters from 34 meters
over an estimated true width of 8.0 meters from 85 meters
DSDD246 :
4.6 g/t Au
over an estimated true width of 10.8 meters from 128.5 meters
DSDD217:
1.6 g/t Au
1.1 g/t Au
9.6 g/t Au
over an estimated true width of 7.6 meters from 50.5 meters
over an estimated true width of 6.3 meters from 79.6 meters
over an estimated true width of 3.2 meters from 117 meters
DSDD219 :
1.8 g/t Au
over an estimated true width of 10.4 meters from 112 meters
DSDD292:
6.3 g/t Au
over an estimated true width of 5.9 meters from 44 meters

An updated interpretation supported by further drilling will take place during the third quarter of 2024 to further refine the controls on mineralization, the association with the nearby Area D and the Moungoundi to Southern Arc prospects (refer to Figure 2).

Figure 2: Karakara cross-section showing select results - looking north


Kassasoko Prospect

Drilling at Kassasoko, located approximately 1-kilometer to the southeast of Western Splay, was successful in intersecting several broad zones of mineralization. Drilling highlights include:

DSDD262:
2.9 g/t Au
over an estimated true width of 15.3 meters from 28.2 meters
DSR685:
1.3 g/t Au
over an estimated true width of 16.8 meters from 108 meters
DSR686
2.5 g/t Au
1.1g/t Au
over an estimated true width of 7.7 meters from 19 meters, and
over an estimated true width of 11.9 meters from 116 meters

In comparison to mineralization elsewhere at Diamba Sud, mineralization at Kassasoko is hosted within a granitic unit and in close proximity to a series of dioritic intrusives (refer to Figure 3). Exploration work is continuing.

Figure 3: Kassasoko cross-section showing select results - looking northeast


Western Splay drilling highlights include:

DSDD232:
8.6 g/t Au
over an estimated true width of 11.9 meters from 132 meters
DSDD275:
12.8 g/t Au
over an estimated true width of 8.2 meters from 114.7 meters
DSR679:
8.8 g/t Au
6.1 g/t Au
over an estimated true width of 4.0 meters from 7 meters, and
over an estimated true width of 6.9 meters from 47 meters
DSR680:
8.9 g/t Au
over an estimated true width of 27.7 meters from 104 meters
DSDD245:
2.8 g/t Au
1.3 g/t Au
1.4 g/t Au
over an estimated true width of 12.9 meters from 11 meters, and
over an estimated true width of 5.0 meters from 30 meters, and
over an estimated true width of 7.3 meters from 53 meters
DSDD248:
4.8 g/t Au
3.0 g/t Au
2.1 g/t Au
3.4 g/t Au
over an estimated true width of 7.9 meters from 19 meters, and
over an estimated true width of 4.0 meters from 31 meters, and
over an estimated true width of 17.8 meters from 59 meters, and
over an estimated true width of 5.9 meters from 83 meters
DSDD293:
6.9 g/t Au
over an estimated true width of 33.3 meters from 115.4 meters

Drilling continues, extending further to the south to test below an active artisanal area, with the objective of increasing the prospect footprint, as well as improving the geological interpretation of the wider southern area of Diamba Sud, particularly the relationships between the Moungoundi-Western Splay-Kassasoko-Southern Arc prospects.

Figure 4 : Western Splay cross-section showing select results - looking north


Refer to Appendix 1 for full details of the drill holes and assay results for this drill program at the Diamba Sud Gold Project.

Quality Assurance & Quality Control (QA - QC)

All drilling data completed by the Company utilized the following procedures and methodologies. All drilling was carried out under the supervision of the Company’s personnel.

All reverse circulation (RC) drilling used a 5.25-inch face sampling pneumatic hammer with samples collected into 60-liter plastic bags. Samples were kept dry by maintaining enough air pressure to exclude groundwater inflow. If water ingress exceeded the air pressure, RC drilling was stopped, and drilling converted to diamond core tails. Once collected, RC samples were riffle split through a three-tier splitter to yield a 12.5% representative sample for submission to the analytical laboratory. The residual 87.5% samples were stored at the drill site until assay results were received and validated. Coarse reject samples for all mineralized samples corresponding to significant intervals are retained and stored on-site at the Company-controlled core yard.

All diamond drilling (DD) drill holes started with HQ sized diameter, before reducing to NQ diameter diamond drill bits on intersecting fresh rock. The core was logged, marked up for sampling using standard lengths of one meter or to a geological boundary. Samples were then cut into equal halves using a diamond saw. One half of the core was left in the original core box and stored in a secure location at the Company core yard at the project site. The other half was sampled, catalogued, and placed into sealed bags and securely stored at the site until shipment.

All RC and DD samples were transported to ALS’s preparation laboratory in Kedougou, Senegal before also being transported via commercial courier, to ALS’s facility in Ouagadougou, Burkina Faso. Routine gold analysis using a 50-gram charge and fire assay with an atomic absorption finish was completed for all samples. Quality control procedures included the systematic insertion of blanks, duplicates and sample standards into the sample stream. In addition, the ALS laboratory inserted its own quality control samples.

Qualified Person

Paul Weedon, Senior Vice President of Exploration for Fortuna Mining Corp., is a Qualified Person as defined by National Instrument 43-101 being a member of the Australian Institute of Geoscientists (Membership #6001). Mr. Weedon has reviewed and approved the scientific and technical information contained in this news release. Mr. Weedon has verified the data disclosed, including the sampling, analytical and test data underlying the information or opinions contained herein by reviewing geochemical and geological databases and reviewing diamond drill core. There were no limitations to the verification process.

About Fortuna Mining Corp.

Fortuna Mining Corp. is a Canadian precious metals mining company with five operating mines in Argentina, Burkina Faso, Côte d'Ivoire, Mexico, and Peru. Sustainability is integral to all our operations and relationships. We produce gold and silver and generate shared value over the long-term for our stakeholders through efficient production, environmental protection, and social responsibility. For more information, please visit our website .

ON BEHALF OF THE BOARD

Jorge A. Ganoza
President, CEO, and Director
Fortuna Mining Corp.

Investor Relations:
Carlos Baca | info@fmcmail.com | fortunamining.com | X | LinkedIn | YouTube

Forward-looking Statements

This news release contains forward-looking statements which constitute “forward-looking information” within the meaning of applicable Canadian securities legislation and “forward-looking statements” within the meaning of the “safe harbor” provisions of the Private Securities Litigation Reform Act of 1995 (collectively, “Forward-looking Statements”). All statements included herein, other than statements of historical fact, are Forward-looking Statements and are subject to a variety of known and unknown risks and uncertainties which could cause actual events or results to differ materially from those reflected in the Forward-looking Statements. The Forward-looking Statements in this news release include, without limitation, statements about the potential of the Diamba Sud Gold Project based on the early success at the Western Splay and Kassasoko prospects, statements relating to the potential to progress the satellite opportunities at the Diamba Sud Gold Project; the proposed plan to update the geological interpretation of certain prospects including the Karakara prospect in the third quarter of 2024; the Company’s objectives for the current drilling program at the Diamba Sud Gold Project and expectations regarding additional drilling and exploration programs planned for 2024; the Company’s business strategy, plans and outlook; the merit of the Company’s mines and mineral properties; mineral resource and reserve estimates; timelines; the future financial or operating performance of the Company; expenditures; approvals and other matters. Often, but not always, these Forward-looking Statements can be identified by the use of words such as “estimated”, “potential”, “open”, “future”, “assumed”, “projected”, “used”, “detailed”, “has been”, “gain”, “planned”, “reflecting”, “will”, “containing”, “remaining”, “to be”, or statements that events, “could” or “should” occur or be achieved and similar expressions, including negative variations. Forward-looking Statements involve known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements of the Company to be materially different from any results, performance or achievements expressed or implied by the Forward-looking Statements. Such uncertainties and factors include, among others, changes in general economic conditions and financial markets; changes in prices for gold, silver, and other metals; the timing and success of the Company’s proposed exploration programs; technological and operational hazards in Fortuna’s mining and mine development activities; risks inherent in mineral exploration; fluctuations in prices for energy, labour, materials, supplies and services; fluctuations in currencies; uncertainties inherent in the estimation of mineral reserves, mineral resources, and metal recoveries; the possibility that the appeal in respect of the ruling in favor of Compañia Minera Cuzcatlan S.A. de C.V. reinstating the environmental impact authorization at the San Jose Mine (the “EIA”) will be successful; the Company’s ability to obtain all necessary permits, licenses and regulatory approvals in a timely manner; governmental and other approvals; political unrest or instability in countries where Fortuna is active; labor relations issues; as well as those factors discussed under “Risk Factors” in the Company's Annual Information Form for the financial year ended December 31, 2023. Although the Company has attempted to identify important factors that could cause actual actions, events or results to differ materially from those described in Forward-looking Statements, there may be other factors that cause actions, events or results to differ from those anticipated, estimated or intended. Forward-looking Statements contained herein are based on the assumptions, beliefs, expectations and opinions of management, including but not limited to expectations regarding the results from the exploration programs conducted at the Company’s mineral properties including the Diamba Sud Gold Project; expected trends in mineral prices and currency exchange rates; the accuracy of the Company’s information derived from its exploration programs at the Company’s mineral properties; current mineral resource and reserve estimates; the presence and continuity of mineralization at the Company’s properties; that the Company’s activities will be in accordance with the Company’s public statements and stated goals; that there will be no material adverse change affecting the Company or its properties; that the appeal filed in the Mexican Collegiate Court challenging the reinstatement of the EIA will be unsuccessful; that all required approvals will be obtained; that there will be no significant disruptions affecting operations and such other assumptions as set out herein. Forward-looking Statements are made as of the date hereof and the Company disclaims any obligation to update any Forward-looking Statements, whether as a result of new information, future events or results or otherwise, except as required by law. There can be no assurance that Forward-looking Statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, investors should not place undue reliance on Forward-looking Statements.

Cautionary Note to United States Investors Concerning Estimates of Reserves and Resources

Reserve and resource estimates included in this news release have been prepared in accordance with National Instrument 43-101 Standards of Disclosure for Mineral Projects ("NI 43-101") and the Canadian Institute of Mining, Metallurgy, and Petroleum Definition Standards on Mineral Resources and Mineral Reserves. NI 43-101 is a rule developed by the Canadian Securities Administrators that establishes standards for public disclosure by a Canadian company of scientific and technical information concerning mineral projects. Unless otherwise indicated, all mineral reserve and mineral resource estimates contained in the technical disclosure have been prepared in accordance with NI 43-101 and the Canadian Institute of Mining, Metallurgy and Petroleum Definition Standards on Mineral Resources and Reserves. Canadian standards, including NI 43-101, differ significantly from the requirements of the Securities and Exchange Commission, and mineral reserve and resource information included in this news release may not be comparable to similar information disclosed by U.S. companies.

Appendix 1 : Diamba Sud Gold Project, Senegal

HoleID
Easting
(WGS84_29N)
Northing
(WGS84_29N)
Elev
(m)
EOH 1
Depth
(m)
UTM
Azimuth
Dip
Depth
From
(m)
Depth
To
(m)
Drilled
Width
(m)
ETW
(m)
Au
(ppm)
Hole
Type
Area
DSDD213
231871
1428285
153
221
270
-60
NSI
DD
Karakara
DSDD215
231698
1428285
152
152
270
-60
64.3
67.8
3.5
2.8
6.0
DD
Karakara
incl
67
67.8
0.8
0.6
13.1
DD
Karakara
97
105.7
8.7
7.0
4.9
DD
Karakara
incl
104.8
105.7
0.9
0.7
29.1
DD
Karakara
DSDD217
231748
1428219
151
157
270
-55
50.5
60
9.5
7.6
1.6
DD
Karakara
79.6
87.4
7.9
6.3
1.1
DD
Karakara
117
121
4.0
3.2
9.6
DD
Karakara
incl
119
120
1.0
0.8
34.9
DD
Karakara
DSDD219
231719
1428103
150
203
340
-50
112
125
13.0
10.4
1.8
DD
Karakara
169
172
3.0
2.4
2.6
DD
Karakara
DSDD222
231975
1428419
153
191
270
-60
136
143
7.0
5.6
1.9
DD
Karakara
DSDD223
231822
1428246
152
203
270
-60
119
125
6.0
4.8
2.2
DD
Karakara
131
135
4.0
3.2
2.3
DD
Karakara
139
149.3
10.3
8.2
4.6
DD
Karakara
incl
145
146
1.0
0.8
10.5
DD
Karakara
and
148.1
149.3
1.2
1.0
21.8
DD
Karakara
DSDD226
231966
1428407
154
179
270
-65
NSI
DD
Karakara
DSDD227
231916
1428376
154
179
270
-60
87.7
93
5.3
4.3
3.7
DD
Karakara
incl
92
93
1.0
0.8
12.7
DD
Karakara
140
143
3.0
2.4
2.1
DD
Karakara
DSDD229
231910
1428425
155
191
270
-60
141
150
9.0
7.2
7.0
DD
Karakara
incl
144
145
1.0
0.8
52.0
DD
Karakara
157
159
2.0
1.6
23.7
DD
Karakara
incl
157
158
1.0
0.8
43.8
DD
Karakara
DSDD231
231888
1428344
154
201
270
-60
48
51
3.0
2.4
4.8
DD
Karakara
incl
49
50
1.0
0.8
12.3
DD
Karakara
82
93
11.0
8.8
1.5
DD
Karakara
DSDD233
231863
1428325
153
185
270
-60
74
75
1.0
0.8
7.9
DD
Karakara
145
148
3.0
2.4
2.0
DD
Karakara
DSDD234
231614
1428102
151
161
340
-50
NSI
DD
Karakara
DSDD237
231793
1428200
151
222
270
-50
55
59
4.0
3.2
2.2
DD
Karakara
81
85
4.0
3.2
2.4
DD
Karakara
94
98
4.0
3.2
1.5
DD
Karakara
171.9
174
2.1
1.7
6.1
DD
Karakara
incl
171.9
173
1.1
0.9
10.2
DD
Karakara
193
197
4.0
3.2
1.4
DD
Karakara
DSDD238
231853
1428225
151
200
270
-55
120
133
13.0
10.4
4.3
DD
Karakara
incl
121
122
1.0
0.8
28.7
DD
Karakara
and
125
126
1.0
0.8
14.5
DD
Karakara
DSDD240
231739
1428268
152
185
90
-60
60
73
13.0
10.4
1.2
DD
Karakara
DSDD243
231749
1428174
150
161
270
-50
24
39
15.0
12.0
31.3
DD
Karakara
incl
28
33
5.0
4.0
87.0
DD
Karakara
and
34
36
2.0
1.6
11.1
DD
Karakara
85
95
10.0
8.0
1.8
DD
Karakara
DSDD244
231917
1428204
151
233
270
-55
100
102
2.0
1.6
13.1
DD
Karakara
incl
101
102
1.0
0.8
23.4
DD
Karakara
139
143
4.0
3.2
8.0
DD
Karakara
incl
139
140
1.0
0.8
26.0
DD
Karakara
147
150
3.0
2.4
6.5
DD
Karakara
incl
148
149
1.0
0.8
13.9
DD
Karakara
199
203
4.0
3.2
1.9
DD
Karakara
DSDD246
231850
1428253
152
200
270
-60
89.9
90.5
0.6
0.5
12.4
DD
Karakara
109.5
112.5
3.0
2.4
1.8
DD
Karakara
116.2
121
4.8
3.9
2.0
DD
Karakara
128.5
142
13.5
10.8
4.6
DD
Karakara
incl
129
130
1.0
0.8
31.2
DD
Karakara
DSDD247
231805
1428378
153
149
90
-60
58
61
3.0
2.4
2.8
DD
Karakara
131
132
1.0
0.8
5.1
DD
Karakara
DSR624
231456
1428202
154
120
90
-50
NSI
RC
Karakara
DSR625
231393
1428197
153
150
90
-50
NSI
RC
Karakara
DSR626
231344
1428202
153
150
90
-50
NSI
RC
Karakara
DSR627
231428
1428275
156
156
90
-50
NSI
RC
Karakara
DSR628
231368
1428277
156
154
90
-50
NSI
RC
Karakara
DSR629
233310
1428268
152
150
90
-50
NSI
RC
Karakara
DSR630
231559
1428117
153
132
340
-50
15
25
10.0
8.0
0.8
RC
Karakara
30
41
11.0
8.8
1.2
RC
Karakara
45
56
11.0
8.8
0.9
RC
Karakara
DSR631
231506
1428148
151
130
340
-50
NSI
RC
Karakara
DSR632
231526
1428108
151
180
340
-50
NSI
RC
Karakara
DSR633
231579
1428053
150
180
340
-50
NSI
RC
Karakara
DSR670
231558
1428006
149
102
340
-50
NSI
RC
Karakara
DSR671
232040
1428349
157
102
270
-50
NSI
RC
Karakara
DSR672
232101
1428398
159
108
270
-50
NSI
RC
Karakara
DSR673
232168
1428450
162
102
270
-50
NSI
RC
Karakara
DSDD292
231677
1428179
152
152
273
-49
44
50
6.0
5.9
6.3
DD
Karakara
Inc
46
47
1.0
1.0
20.4
58
59
1.0
1.0
5.5
DSDD295
231660
1428201
153
104
271
-50
45
50
5.0
5.0
3.2
DD
Karakara
DSDD239
231666
1425923
145
133.6
150
-55
11
13
2.0
1.4
3.6
DD
Kassasoko
DSDD241
231721
1425826
116
105
330
-50
NSI
DD
Kassasoko
DSDD242
231637
1425919
118
150
330
-50
20
37
17.0
11.9
1.3
DD
Kassasoko
46
53
7.0
4.9
0.9
DD
Kassasoko
DSDD259
231686
1425747
144
131
330
-50
NSI
DD
Kassasoko
DSDD260
231588
1425832
144
138
150
-50
25
26.7
1.7
1.2
6.7
DD
Kassasoko
incl
26
26.7
0.7
0.5
13.9
DD
Kassasoko
DSDD261
231814
1425787
143
74
330
-50
NSI
DD
Kassasoko
DSDD262
231877
1425885
142
98
330
-65
28.2
50
21.8
15.3
2.9
DD
Kassasoko
incl
36
37
1.0
0.7
20.8
DD
Kassasoko
DSDD263
232299
1426120
142
80
330
-50
NSI
DD
Kassasoko
DSDD264
231705
1425912
145
125
150
-50
21
23
2.0
1.4
12.6
DD
Kassasoko
incl
21
22
1.0
0.7
23.4
DD
Kassasoko
88
92
4.0
2.8
1.3
DD
Kassasoko
DSDD265
231602
1425855
144
138
150
-50
130
131
1.0
0.7
5.3
DD
Kassasoko
DSDD268
231841
1425730
144
153
330
-55
84
93
9.0
6.3
1.1
DD
Kassasoko
133
139
6.0
4.2
1.2
DD
Kassasoko
DSDD271
231554
1425886
145
164
150
-50
NSI
DD
Kassasoko
DSDD273
231712
1425941
144
134
150
-55
NSI
DD
Kassasoko
DSR685
231782
1425886
143
144
150
-50
40
51
11.0
7.7
1.2
RC
Kassasoko
63
66
3.0
2.1
2.6
RC
Kassasoko
108
132
24.0
16.8
1.3
RC
Kassasoko
DSR686
231760
1425904
143
146
150
-50
19
30
11.0
7.7
2.5
RC
Kassasoko
56
68
12.0
8.4
0.7
RC
Kassasoko
116
133
17.0
11.9
1.1
RC
Kassasoko
DSR687
231568
1425964
144
150
150
-50
27
38
11.0
7.7
0.8
RC
Kassasoko
60
66
6.0
4.2
1.0
RC
Kassasoko
DSR688
231874
1425946
144
94
150
-55
70
79
9.0
6.3
1.2
RC
Kassasoko
DSR689
231892
1425962
144
90
150
-50
NSI
RC
Kassasoko
DSR690
231929
1425995
144
95
150
-50
62
63
1.0
0.7
8.6
RC
Kassasoko
DSR691
232244
1426155
144
114
150
-50
40
48
8.0
5.6
3.3
RC
Kassasoko
incl
41
42
1.0
0.7
11.0
RC
Kassasoko
DSR692
232315
1426188
144
90
150
-50
NSI
RC
Kassasoko
DSDD230
231070
1426250
145
152
90
-50
15
22
7.0
6.9
2.0
DD
Western Splay
27
33.5
6.5
6.4
3.2
DD
Western Splay
incl
33
33.5
0.5
0.5
11.5
DD
Western Splay
56.8
64
7.2
7.1
3.7
DD
Western Splay
incl
56.8
57.5
0.7
0.7
17.2
DD
Western Splay
DSDD232
231130
1426277
145
152
90
-50
3
13
10.0
9.9
0.9
DD
Western Splay
66.5
68
1.5
1.5
6.7
DD
Western Splay
132
144
12.0
11.9
8.6
DD
Western Splay
incl
132
134.4
2.4
2.4
25.1
DD
Western Splay
and
138
139
1.0
1.0
15.1
DD
Western Splay
and
143
143.5
0.5
0.5
14.0
DD
Western Splay
DSDD235
231231
1426325
147
81
90
-50
12
19
7.0
6.9
1.9
DD
Western Splay
23
31
8.0
7.9
1.8
DD
Western Splay
35
40.4
5.4
5.3
3.8
DD
Western Splay
incl
39
39.8
0.8
0.8
13.1
DD
Western Splay
60
63
3.0
3.0
2.5
DD
Western Splay
DSDD236
231229
1426136
140
178
310
-55
NSI
DD
Western Splay
DSDD245
231097
1426266
145
215
90
-50
11
24
13.0
12.9
2.8
DD
Western Splay
incl
19
20
1.0
1.0
12.5
DD
Western Splay
30
35
5.0
5.0
1.3
DD
Western Splay
53
60.4
7.4
7.3
1.4
DD
Western Splay
67.5
75
7.5
7.4
0.7
DD
Western Splay
164.7
167.5
2.8
2.8
3.4
DD
Western Splay
197.7
203
5.3
5.2
1.3
DD
Western Splay
DSDD248
231035
1426276
146
143
90
-50
19
27
8.0
7.9
4.8
DD
Western Splay
incl
19
20
1.0
1.0
14.9
DD
Western Splay
31
35
4.0
4.0
3.0
DD
Western Splay
59
77
18.0
17.8
2.1
DD
Western Splay
83
89
6.0
5.9
3.4
DD
Western Splay
DSDD249
231109
1426343
147
152
90
-60
22
32
10.0
9.9
0.8
DD
Western Splay
DSDD250
231062
1426327
146
227
90
-50
39
44
5.0
5.0
1.8
DD
Western Splay
92
93
1.0
1.0
5.9
DD
Western Splay
193
195
2.0
2.0
2.9
DD
Western Splay
DSDD251
231085
1426300
145
204
90
-50
154
168.2
14.2
14.1
3.1
DD
Western Splay
155
156
1.0
1.0
11.5
DD
Western Splay
171.3
179
7.8
7.7
1.2
DD
Western Splay
DSDD252
231115
1426328
146
233
90
-50
169
178.2
9.2
9.1
2.5
DD
Western Splay
incl
170
171
1.0
1.0
14.7
DD
Western Splay
DSDD253
231031
1426293
146
215
90
-50
4
8
4.0
4.0
4.4
DD
Western Splay
incl
5
6
1.0
1.0
12.5
DD
Western Splay
45.5
49.8
4.3
4.3
1.3
DD
Western Splay
68
76
8.0
7.9
2.5
DD
Western Splay
182
183
1.0
1.0
13.2
DD
Western Splay
198
206
8.0
7.9
1.2
DD
Western Splay
DSDD254
230882
1426400
147
167
90
-60
83
91
8.0
7.9
1.7
DD
Western Splay
100
102
2.0
2.0
5.4
DD
Western Splay
112
120
8.0
7.9
2.4
DD
Western Splay
125
132
7.0
6.9
1.4
DD
Western Splay
DSDD255
231122
1426382
148
81
90
-55
NSI
DD
Western Splay
DSDD256
231179
1426407
149
59
90
-55
NSI
DD
Western Splay
DSDD257
231129
1426407
148
93
90
-55
41
46
5.0
5.0
1.5
DD
Western Splay
DSDD258
231237
1426351
148
128
90
-50
NSI
DD
Western Splay
DSDD274
231255
1426295
146
122
90
-50
NSI
DD
Western Splay
DSDD275
231186
1426280
146
140
90
-50
114.7
123
8.3
8.2
12.8
DD
Western Splay
incl
116
119
3.0
3.0
32.5
DD
Western Splay
DSDD277
231202
1426184
146
120
310
-50
60
70.2
10.2
7.1
2.9
DD
Western Splay
incl
69
69.7
0.7
0.7
17.1
DD
Western Splay
DSDD279
231187
1426174
146
188
310
-50
NSI
DD
Western Splay
DSDD282
231163
1426140
146
117
310
-50
65.2
72
6.8
4.8
2.1
DD
Western Splay
DSDD284
231220
1426180
146
116
310
-55
NSI
DD
Western Splay
DSDD285
231188
1426118
146
135
310
-50
NSI
DD
Western Splay
DSR674
231348
1426181
146
102
330
-50
NSI
RC
Western Splay
DSR675
231394
1426186
147
126
330
-50
NSI
RC
Western Splay
DSR676
231168
1426451
150
78
90
-50
NSI
RC
Western Splay
DSR677
231127
1426448
149
126
90
-50
NSI
RC
Western Splay
DSR678
231214
1426345
148
132
90
-60
39
47
8.0
7.9
3.2
RC
Western Splay
DSR679
231261
1426326
147
132
90
-50
7
11
4.0
4.0
8.8
RC
Western Splay
incl
9
10
1.0
1.0
25.6
RC
Western Splay
20
24
4.0
4.0
4.5
RC
Western Splay
incl
21
22
1.0
1.0
15.5
RC
Western Splay
47
54
7.0
6.9
6.1
RC
Western Splay
incl
47
48
1.0
1.0
25.2
RC
Western Splay
58
69
11.0
10.9
0.7
RC
Western Splay
DSR680
231217
1426300
146
138
90
-50
104
132
28.0
27.7
8.9
RC
Western Splay
incl
105
106
1.0
1.0
13.7
RC
Western Splay
and
110
114
4.0
4.0
28.6
RC
Western Splay
and
119
120
1.0
1.0
11.3
RC
Western Splay
DSR681
231063
1426214
145
156
90
-50
NSI
RC
Western Splay
DSR682
231129
1426302
146
186
90
-50
3
11
8.0
7.9
1.2
RC
Western Splay
DSR683
230980
1426269
146
156
90
-50
108
112
4.0
4.0
2.4
RC
Western Splay
129
135
6.0
5.9
3.2
RC
Western Splay
DSR684
230996
1426295
146
139
90
-50
51
59
8.0
7.9
1.9
RC
Western Splay
DSDD287
231246
1426227
146
179
311
-48
148
156
8.0
7.9
2.1
DD
Western Splay
Inc
151.2
152
0.8
10.3
DSDD289
231263
1426278
146
173
309
-50
NSI
DD
Western Splay
DSDD293
231186
1426304
146
180
90
-49
115.4
149
33.6
33.3
6.9
DD
Western Splay
Inc
127.1
131
3.9
3.9
32.4
131.6
132.3
0.7
0.6
13.6
133
134
1.0
1.0
11.1
147
148
1.0
1.0
10.1
DSDD266
234590
1411956
167
68
150
-50
2
3
1.0
0.7
9.9
DD
Bougouda
DSDD267
234565
1411999
167
119
150
-50
NSI
DD
Bougouda
DSDD269
234669
1412014
167
73
150
-50
41.4
46
4.7
3.3
3.2
DD
Bougouda
DSDD270
234645
1412052
167
128
150
-50
110
117
7.0
4.9
3.5
DD
Bougouda
incl
111
112
1.0
0.7
12.3
DD
Bougouda
DSDD272
234849
1412030
167
139
325
-50
71
76
5.0
3.5
2.7
DD
Bougouda
DSDD278
234873
1412074
167
104
325
-50
NSI
DD
Bougouda
DSDD280
234896
1412043
167
149
325
-50
93
101
8.0
5.6
3.3
DD
Bougouda
incl
99
100
1.0
0.7
12.8
DD
Bougouda
DSDD281
235044
1412181
167
122
325
-50
NSI
DD
Bougouda
DSDD283
235068
1412150
167
153
325
-50
NSI
DD
Bougouda
DSDD286
235372
1411456
167
116
150
-50
NSI
DD
Bougouda
DSDD288
235488
1411556
167
152
150
-50
74.2
75.8
1.6
1.2
10.5
DD
Bougouda
incl
75
75.8
0.8
0.6
20.3
DD
Bougouda
100
113
13.0
9.1
1.8
DD
Bougouda
DSR693
235294
1411393
167
84
150
-50
NSI
RC
Bougouda
DSR694
235334
1411416
167
84
150
-50
74
84
10.0
7.0
2.2
RC
Bougouda
DSR695
235460
1411494
167
75
150
-50
NSI
RC
Bougouda
DSR696
235418
1411476
167
75
150
-50
53
56
3.0
2.1
3.8
RC
Bougouda
DSR697
235244
1411373
167
75
150
-50
NSI
RC
Bougouda
DSR698
234576
1411654
167
92
145
-50
NSI
RC
Bougouda
DSR699
234661
1411706
167
78
145
-50
60
62
2.0
1.4
11.2
RC
Bougouda
incl
61
62
1.0
0.7
15.6
RC
Bougouda
DSR700
234750
1411761
167
82
140
-50
39
40
1.0
0.7
5.5
RC
Bougouda
DSR701
234645
1411548
167
92
140
-50
NSI
RC
Bougouda
DSR702
234732
1411597
167
80
140
-50
NSI
RC
Bougouda
DSR703
234822
1411683
167
72
140
-50
NSI
RC
Bougouda
DSR704
234634
1411729
167
144
145
-50
NSI
RC
Bougouda
DSR705
234973
1410955
167
72
150
-50
NSI
RC
Bougouda
DSR706
234929
1410935
167
80
150
-50
NSI
RC
Bougouda
DSR707
234749
1410877
167
96
150
-50
65
66
1.0
0.7
16.1
RC
Bougouda
74
76
2.0
1.4
31.3
RC
Bougouda
DSR708
234662
1410927
167
78
200
-50
NSI
RC
Bougouda
DSR709
234609
1410936
167
96
200
-50
NSI
RC
Bougouda
DSR710
234731
1410877
167
156
200
-50
149
156
7.0
4.9
2.7
RC
Bougouda
DSR711
234735
1410913
167
150
150
-50
101
112
11.0
7.7
3.5
RC
Bougouda
incl
110
111
1.0
0.7
24.9
RC
Bougouda
DSR712
234836
1410887
167
84
150
-50
47
50
3.0
2.1
2.8
RC
Bougouda
DSR713
234880
1410904
167
84
150
-50
28
33
5.0
3.5
1.5
RC
Bougouda
DSR714
235054
1411011
167
100
150
-50
NSI
RC
Bougouda
DSR715
235210
1411348
167
54
150
-50
NSI
RC
Bougouda
DSR716
235502
1411517
167
90
150
-50
65
89
24.0
16.8
2.1
RC
Bougouda
incl
77
78
1.0
0.7
10.6
RC
Bougouda
DSR717
235553
1411548
167
90
150
-50
19
32
13.0
9.1
1.7
RC
Bougouda
73
79
6.0
4.2
0.9
RC
Bougouda
DSR718
235163
1411321
167
81
150
-50
NSI
RC
Bougouda
DSR719
234712
1411725
167
78
140
-50
NSI
RC
Bougouda
DSR720
234796
1411783
167
96
145
-50
NSI
RC
Bougouda
DSR721
234623
1411679
167
100
140
-50
42
47
5.0
3.5
9.4
RC
Bougouda
incl
42
44
2.0
1.4
19.3
RC
Bougouda
51
54
3.0
2.1
13.9
RC
Bougouda
incl
51
52
1.0
0.7
37.6
RC
Bougouda
DSR722
234674
1411775
167
150
140
-50
NSI
RC
Bougouda
DSR723
234617
1411522
167
80
145
-50
NSI
RC
Bougouda
DSR724
234777
1411699
167
72
145
-50
NSI
RC
Bougouda
DSR725
234773
1411640
167
84
145
-50
70
72
2.0
1.4
6.1
RC
Bougouda
DSR726
234857
1411696
167
72
145
-50
NSI
RC
Bougouda
DSR728
234618
1411592
167
162
145
-50
NSI
RC
Bougouda
DSR729
235531
1411583
167
150
150
-50
103
108
5.0
3.5
1.8
RC
Bougouda
DSR730
235320
1411454
167
150
150
-50
9
19
10.0
7.0
0.7
RC
Bougouda
108
115
7.0
4.9
2.3
RC
Bougouda
124
131
7.0
4.9
1.0
RC
Bougouda
DSR731
235225
1411409
167
150
150
-50
24
26
2.0
1.4
6.9
RC
Bougouda
incl
24
25
1.0
0.7
12.5
RC
Bougouda
35
41
6.0
4.2
6.8
RC
Bougouda
incl
36
37
1.0
0.7
35.7
RC
Bougouda
47
54
7.0
4.9
1.0
RC
Bougouda
DSR732
235443
1411533
167
156
150
-50
NSI
RC
Bougouda
DSR733
234715
1411615
167
120
325
-50
NSI
RC
Bougouda
DSR736
234790
1412016
167
60
322
-51
35
40
5.0
1.8
RC
Bougouda
51
52
1.0
6.6
DSR737
234810
1411987
167
113
328
-51
99
105
6.0
1.3
RC
Bougouda
DSR738
235110
1412245
167
90
325
-52
NSI
RC
Bougouda
DSR739
235345
1412424
167
126
330
-51
NSI
RC
Bougouda
DSR740
235270
1412374
167
90
326
-51
NSI
RC
Bougouda
DSR741
235192
1412319
167
84
328
-50
NSI
RC
Bougouda
DSR742
235146
1412207
167
126
324
-51
105
108
3.0
4.3
RC
Bougouda
DSR744
234993
1412093
167
162
320
-52
NSI
RC
Bougouda
DSR745
235215
1412285
167
66
324
-52
NSI
RC
Bougouda
DSR734
234779
1411714
167
120
327
-52
NSI
RC
Bougouda
DSR735
234832
1411731
167
126
323
-51
NSI
RC
Bougouda
DSDD294
235415
1411382
167
116
327
-51
77
79.15
2.2
5.6
DD
Bougouda
DSDD290
235450
1411404
167
128
331
-52
64.9
66
1.1
36.8
DD
Bougouda
Inc
65.4
66
0.6
56.4
Bougouda
DSDD291
235484
1411458
167
128
329
-56
NSI
DD
Bougouda
DSDD296
235371
1411369
167
131
326
-52
NSI
DD
Bougouda


Explanatory Notes:

A. EOH - End of hole

B. NSI: No significant intercepts

C. ETW: Estimated true width

D. Depths and widths reported to nearest significant decimal place

E. DD: diamond drilling tail | RC: reverse circulation drilling

A PDF accompanying this announcement is available at

http://ml.globenewswire.com/Resource/Download/7bf0e403-d41b-42db-baa3-0702e83cbf9f


Photos accompanying this announcement are available at:

https://www.globenewswire.com/NewsRoom/AttachmentNg/cf6acc2e-621e-4bdc-b7ca-445d960b9fbb

https://www.globenewswire.com/NewsRoom/AttachmentNg/4bded518-db5b-4ac2-bcbe-46618e787759

https://www.globenewswire.com/NewsRoom/AttachmentNg/d12c02cf-9e7d-4726-af84-8a3f9aae6052

https://www.globenewswire.com/NewsRoom/AttachmentNg/355b3dad-801d-4742-81cc-d26606282394


Stock Information

Company Name: Fortuna Silver Mines Inc.
Stock Symbol: FVI:CC
Market: TSXC
Website: fortunasilver.com

Menu

FVI:CC FVI:CC Quote FVI:CC Short FVI:CC News FVI:CC Articles FVI:CC Message Board
Get FVI:CC Alerts

News, Short Squeeze, Breakout and More Instantly...