home / stock / evni:cc / evni:cc news


EVNI:CC News and Press, Ev Nickel Inc. From 10/27/22

Stock Information

Company Name: Ev Nickel Inc.
Stock Symbol: EVNI:CC
Market: TSXVC
Website: evnickel.com

Menu

EVNI:CC EVNI:CC Quote EVNI:CC Short EVNI:CC News EVNI:CC Articles EVNI:CC Message Board
Get EVNI:CC Alerts

News, Short Squeeze, Breakout and More Instantly...

EVNI:CC - EV Nickel Inc.: Invitation to Red Cloud's 2022 Fall Mining Showcase

Toronto, Ontario--(Newsfile Corp. - October 27, 2022) - EV Nickel Inc. (TSXV: EVNI) is pleased to announce that the company will be presenting at Red Cloud's 2022 Fall Mining Showcase. We invite our shareholders and all interested parties to join us there. The annual conference will be hos...

EVNI:CC - EV Nickel Phase 3 Drilling Preliminary Results: Confirms New Large-Scale Nickel Zone at CarLang

NOT FOR DISSEMINATION IN THE UNITED STATES OF AMERICA OR TO US WIRE SERVICES The CarLang Area is a >10km prospective trend of dunitic units. 1.4km of the prospective strike was drilled this summer, with 28 holes totalling 8,295m. Assays from the first four holes have been ...

EVNI:CC - RETRANSMISSION: EV Nickel Phase 2 Results: Continued High-Grade Mineralization Including 8.5 Metres Grading 2.14% Ni from the W4 Extension, Now Applying for Mining Lease

Final assays from the Phase 2 drilling, on the "W4 Extension", between 200 and 500m from surface EV22-17 intersects 20.6 metres grading 1.23% Ni, including 8.5 metres grading 2.14% Ni EV22-18 intersects 15.7 metres grading 0.90% Ni, including 4.9 metres grading 1.71% Ni Thi...

EVNI:CC - EV Nickel Initiates Surface Water Baseline Monitoring Study on Shaw Dome Nickel Project's Langmuir W4 Zone

● Environmental study will provide baseline reference for surface waters ● Commissioned Timmins-based Blue Heron Environmental to complete the study ● Represents a first step in preparation for permitting and advancement of the Langmuir W4 Zone TORONTO, ON / ...

EVNI:CC - EV Nickel Phase 2 Drilling Results: Reports 5.4 Metres Grading 2.96% Ni From "W4 Extension"

NOT FOR DISSEMINATION IN THE UNITED STATES OF AMERICA OR TO US WIRE SERVICES ● EV22-12 intersects 14.3 metres grading 1.50% Ni, including 5.4 metres grading 2.96% Ni ● EV22-13 intersects 15.8 metres grading 0.85% Ni, including 5.5 metres grading 1.33% Ni ● I...

EVNI:CC - EV Nickel Closes Oversubscribed Private Placement of $2.2M

NOT FOR DISSEMINATION IN THE UNITED STATES OF AMERICA OR TO US WIRE SERVICES TORONTO, ON / ACCESSWIRE / July 7, 2022 / EV Nickel Inc. (TSXV:EVNI) ("EVNi" or the "Company") announces that it has closed the oversubscribed, non-brokered, private placement financing (the "Offering") (see ne...

EVNI:CC - EV Nickel Drilling Update: Phase 2 Completed on the High-Grade W4 Extension and Phase 3 Initiated on the Large-Scale CarLang Target

NOT FOR DISSEMINATION IN THE UNITED STATES OF AMERICA OR TO US WIRE SERVICES Phase 2 drilling was completed on the High-Grade W4 Extension, with Assay results over the coming months Phase 3 drilling began last week on the Large-Scale CarLang Target, in the northeast of EVNi's prop...

EVNI:CC - EV Nickel Announces Non-Brokered Private Placement of up to C$2.0 Million

NOT FOR DISSEMINATION OR DISTRIBUTION INTO THE UNITED STATES OR THROUGH UNITED STATES NEWSWIRE SERVICES TORONTO, ON / ACCESSWIRE / June 15, 2022 / EV Nickel Inc. (TSXV:EVNI) ("EVNi" or the "Company") is pleased to announce a non-brokered private placement (the "Offering") for gross proc...

EVNI:CC - EV Nickel Negotiates Lease and ROFR to Purchase the Patents Hosting the Permitted Carshaw Mill

NOT FOR DISSEMINATION IN THE UNITED STATES OF AMERICA OR TO US WIRE SERVICES Negotiated access to the Carshaw Mill site, adjacent to the Company's Carman-Langmuir exploration target EV Nickel may potentially use the site as a Regional Exploration and Technical hub Secured Rig...

EVNI:CC - EV Nickel Phase 2 Drilling Results- 48.6 metres Grading 1.31% Nickel from W4, Samples Submitted for Met Testing

NOT FOR DISSEMINATION IN THE UNITED STATES OF AMERICA OR TO US WIRE SERVICES EVMET22-01 intersects 48.60 metres grading 1.31% Ni, including 13.0 metres grading 2.98% Ni EVMET22-02 intersects to 33.0 metres grading 0.74% Ni, including 9.0 metres grading 1.47% Ni Holes EVMET22-...

Previous 10 Next 10