Twitter

Link your Twitter Account to Market Wire News


When you linking your Twitter Account Market Wire News Trending Stocks news and your Portfolio Stocks News will automatically tweet from your Twitter account.


Be alerted of any news about your stocks and see what other stocks are trending.



home / news releases / AGI - Alamos Gold Extends High-Grade Gold Mineralization Laterally and at Depth at Island Gold Including within Sub-Parallel Zones in Proximity to Existing Infrastructure


AGI - Alamos Gold Extends High-Grade Gold Mineralization Laterally and at Depth at Island Gold Including within Sub-Parallel Zones in Proximity to Existing Infrastructure

TORONTO, Nov. 29, 2022 (GLOBE NEWSWIRE) -- Alamos Gold Inc. ( TSX:AGI; NYSE:AGI ) (“Alamos” or the “Company”) today reported new results from surface and underground exploration drilling at the Island Gold mine, further extending high-grade gold mineralization in Island West, Island East, and at depth. All reported drill widths are true width of the mineralized zones, unless otherwise stated.

  • Island West: high-grade mineralization extended 225 metres (“m”) west of existing Mineral Reserves and Resources (MH33-01). New highlights include:

    C-Zone:
    • 97.21 g/t Au (58.55 g/t cut) over 5.05 m (MH33-01);
    • 22.40 g/t Au (22.40 g/t cut) over 2.18 m (790-450-06);
    • 12.07 g/t Au (12.07 g/t cut) over 2.79 m (790-460-10); and
    • 13.91 g/t Au (13.91 g/t cut) over 2.18 m (790-465-12).
  • Island West Hanging Wall Zones: high-grade gold mineralization intersected within newly defined sub-parallel zones in the hanging wall (B, G, and G1 zones). These sub-parallel zones are within proximity of existing underground infrastructure and represent a significant opportunity to add near mine Mineral Reserves and Resources. New highlights include:

    B-Zone:
    • 525.28 g/t Au (80.26 g/t cut) over 2.33 m (770-467-12);
    • 72.03 g/t Au (44.05 g/t cut) over 3.15 m (770-468-02);
    • 73.16 g/t Au (47.35 g/t cut) over 2.65 m (770-467-10);
    • 34.41 g/t Au (22.77 g/t cut) over 5.07 m (770-467-11);
    • 91.14 g/t Au (35.59 g/t cut) over 2.61 m (770-468-01A);
    • 37.75 g/t Au (36.54 g/t cut) over 2.53 m (770-467-14);
    • 226.16 g/t Au (32.33 g/t cut) over 2.58 m (770-467-13); and
    • 51.17 g/t Au (37.18 g/t cut) over 2.11 m (770-468-03).

    G-Zone:
    • 22.81 g/t Au (22.81 g/t cut) over 2.14 m (770-467-08);
    • 14.01 g/t Au (13.65 g/t cut) over 2.34 m (770-471-02); and
    • 10.20 g/t Au (10.20 g/t cut) over 2.59 m (770-474-26).

    G-Zone:
    • 38.50 g/t Au (19.68 g/t cut) over 2.00 m (770-474-19); and
    • 37.15 g/t Au (15.97 g/t cut) over 2.33 m (770-467-14).

  • Island East Lower: high-grade gold mineralization further extended down-plunge from the large high-grade Inferred Mineral Resource block in the lower part of Island East which contained 2.0 million ounces grading 15.48 g/t Au (3.96 million tonnes (“mt”)) as of December 31, 2021. New highlights include:
    • 110.17 g/t Au (52.08 g/t cut) over 7.79 m (MH27-08);
    • 22.17 g/t Au (22.17 g/t cut) over 8.01 m (MH27-07); and
    • 10.45 g/t Au (10.45 g/t cut) over 7.28 m (MH27-06).
  • Island East Middle: underground exploration drilling extended high-grade gold mineralization within the E1E-Zone to the east of Mineral Reserves and Resources and in the area between Island Main and East (above the 840-level). Both areas are within proximity to existing underground infrastructure. New highlights include:
    • 49.51 g/t Au (49.51 g/t cut) over 2.27 m (840-608-34);
    • 27.22 g/t Au (27.22 g/t cut) over 2.16 m (620-580-09);
    • 14.82 g/t Au (14.82 g/t cut) over 3.68m (840-632-11);
    • 24.41 g/t Au (24.41 g/t cut) over 2.13 m (840-608-32); and
    • 25.27 g/t Au (21.18 g/t cut) over 2.36 m (620-624-09).
  • Island Main: high-grade gold mineralization extended 160 m below Inferred Mineral Resources (MH30-02), representing one of the deepest intersections to date at Island Gold at a vertical depth of 1,666 m. This highlights the significant opportunity for further high-grade Mineral Reserve and Resource additions with the deposit open laterally and at depth across the currently defined 2 km strike. New highlights include:
    • 23.21 g/t Au (23.21 g/t cut) over 2.50 m (MH30-02).

Note: Drillhole composite intervals reported as “cut” may include higher grade samples which have been cut to: C-zone (225 g/t Au), B-zone (90 g/t Au), D1 and G1-zones (45 g/t Au), and G-zone (70 g/t Au), E1E-zone (185 g/t Au).

“These high-grade results across multiple areas of the Island Gold deposit highlight the significant exploration upside, not only laterally and at depth, but within newly defined sub-parallel structures. Much of our focus the last several years has been adding high-grade Mineral Resources at depth in advance of the Phase 3+ Expansion study. Having nearly tripled the Mineral Reserve and Resource base to over five million ounces of gold and with work on the expansion ramping up, our exploration focus is shifting to more cost-effective underground drilling where we can leverage existing infrastructure,” said John A. McCluskey, President and Chief Executive Officer.

“We see excellent potential to continue adding high-grade Mineral Reserves and Resources laterally and at depth, but also within these previously undefined areas adjacent to our existing infrastructure which have the potential to be incorporated into near-term mine planning. These represent potential high-grade ounces close to our existing production horizons which will be low cost to develop, further increasing ounces per vertical metre and the value of the operation,” Mr. McCluskey added.

New highlight intercepts can be found in Tables 1 and 2, and in Figures 1 to 6 at the end of this news release.

2022 Exploration Drilling Program – Island Gold Mine

Total exploration spending through the first nine months was $17.9 million, in line with the annual budgeted amount of $22 million for surface and underground exploration at Island Gold in 2022. Exploration remains focused on defining additional near mine Mineral Resources across the Island Gold Deposit (Island Main, West, and East), as well as advancing and evaluating several regional targets.

A total of 28,174 m of surface directional drilling, 17,984 m of underground exploration drilling, and 9,707 m of regional surface exploration drilling has been completed as of November 25, 2022.

Island West

Surface Directional Drilling

Surface directional drilling extended high-grade mineralization 225 m west of existing Mineral Reserves and Resources (MH33-01) in Island West and highlights the opportunity to expand mineralization up-plunge and along strike, in proximity to existing underground infrastructure. Surface drilling is ongoing in this area, and underground exploration drifts will be extended west from the 490 and 790 levels to continue testing this area from underground.

New highlights include (Figure 1, Table 1):

C-Zone:

  • 97.21 g/t Au (58.55 g/t cut) over 5.05 m (MH33-01).

Underground Exploration Drilling

Underground drilling from the 770 and 790-level exploration drifts continues to extend high-grade gold mineralization along strike to the west of Mineral Reserves and Resources in the middle portion of Island West (between vertical depths of 700 m and 1,100 m).

New highlights include (Figure 1, Table 2):

C-Zone:

  • 22.40 g/t Au (22.40 g/t cut) over 2.18 m (790-450-06);
  • 12.07 g/t Au (12.07 g/t cut) over 2.79 m (790-460-10);
  • 13.91 g/t Au (13.91 g/t cut) over 2.18 m (790-465-12);
  • 12.83 g/t Au (12.83 g/t cut) over 2.27 m (790-460-07); and
  • 11.29 g/t Au (11.29 g/t cut) over 2.02 m (790-465-13B).

Island West Hanging Wall Zones

In addition to testing the C-Zone structure from the 770- and 790-levels, drill holes were extended into the hanging wall to follow up on previous drilling that intersected high-grade gold mineralization in sub-parallel structures. These structures were previously classified as “unknown zones” and contained limited Mineral Resources due to the lack of drilling. Additional drilling has been successful in establishing continuity and extending high-grade gold mineralization within multiple structures referred to as the B, G, and G1 Zones. These zones are located 20 m, 75 m and 110 m south of the main C-Zone, respectively. This highlights the potential to add high-grade Mineral Reserves and Resources in proximity of existing production horizons and infrastructure which could be incorporated into the mine plan and mined within the next several years. These potential high-grade Mineral Reserves and Resource additions would be low cost to develop, further increasing the value of the operation and strong economics of the expansion.

New highlights include (Figures 4, 5, and 6, Table 2):

B-Zone:

  • 525.28 g/t Au (80.26 g/t cut) over 2.33 m (770-467-12);
  • 72.03 g/t Au (44.05 g/t cut) over 3.15 m (770-468-02);
  • 73.16 g/t Au (47.35 g/t cut) over 2.65 m (770-467-10);
  • 34.41 g/t Au (22.77 g/t cut) over 5.07 m (770-467-11);
  • 91.14 g/t Au (35.59 g/t cut) over 2.61 m (770-468-01A);
  • 37.75 g/t Au (36.54 g/t cut) over 2.53m (770-467-14);
  • 226.16 g/t Au (32.33 g/t cut) over 2.58 m (770-467-13);
  • 51.17 g/t Au (37.18 g/t cut) over 2.11 m (770-468-03);
  • 31.79 g/t Au (26.36 g/t cut) over 2.07 m (790-450-02); and
  • 38.96 g/t Au (20.83 g/t cut) over 2.32 m (770-468-07).

G-Zone:

  • 22.81 g/t Au (22.81 g/t cut) over 2.14 m (770-467-08);
  • 14.01 g/t Au (13.65 g/t cut) over 2.34 m (770-471-02); and
  • 10.20 g/t Au (10.20 g/t cut) over 2.59 m (770-474-26).

G1-Zone:

  • 38.50 g/t Au (19.68 g/t cut) over 2.00 m (770-474-19); and
  • 37.15 g/t Au (15.97 g/t cut) over 2.33 m (770-467-14).

Within the B-Zone, the distribution of drill hole intersections over a 30 to 40 m extent is the result of a series of drill holes that were completed at different azimuths and dips from a footwall drill bay, located approximately 30 m north of the B-Zone. These holes were designed to test targets in the hanging wall G and G1 zones, and also confirmed the continuity of high-grade gold mineralization locally within the B-zone.

Island Main and East

Surface Directional Drilling

Surface directional drilling continues to extend high-grade gold mineralization in the E1E-Zone beyond Mineral Resource blocks in the lower portions of Island Main and East areas.

New highlights from the drilling program include (Figure 1, Table 1):

  • 110.17 g/t Au (52.08 g/t cut) over 7.79 m (MH27-08);
  • 22.17 g/t Au (22.17 g/t cut) over 8.01 m (MH27-07);
  • 10.45 g/t Au (10.45 g/t cut) over 7.28 m (MH27-06); and
  • 23.21 g/t Au (23.21 g/t cut) over 2.50 m (MH30-02).

Drill hole MH30-02 (23.21 g/t Au (23.21 g/t cut) over 2.50 m) was planned as a significant step-out at depth below Inferred Mineral Resources in Island Main area. This hole intersected high-grade mineralization 160 m vertically below Inferred Mineral Resources and is one of the deepest intersections to date at Island Gold. This further highlights the opportunity for the expansion of high-grade Mineral Reserves and Resources at depth, where Island Gold remains open at depth across the 2 km strike of the deposit.

Drill holes MH27-06 ( 10.45 g/t Au (10.45 g/t cut) over 7.28 m), MH27-07 (22.17 g/t Au (22.17 g/t cut) over 8.01 m), and MH27-08 (110.17 g/t Au (52.08 g/t cut) over 7.79 m) intersected wide, high-grade mineralization beyond the nearest Inferred Mineral Resource block in Island East. These drill holes continue to extend gold mineralization down-plunge from the large Inferred Mineral Resource block which has grown rapidly over the last several years to contain 2.0 million ounces grading 15.48 g/t Au (3.96 mt) as of December 31, 2021. Drilling is in progress in this area and is expected to extend Inferred Mineral Resources to the east.

Drillhole MH27-06 was extended into the footwall of the E1E-Zone and two mineralized zones were encountered, 29.81 g/t Au (29.81 g/t cut) over 6.40 m, and 20.67 g/t Au (20.67 g/t cut) over 13.50 m. These zones start 125 m and 137 m, respectively, down-hole from the E1E-Zone, both with apparent moderate to low-angle relative to the core axis, suggesting an oblique orientation relative to the drill hole azimuth (see “Other Zones”). As a result, true width and geometry are unknown at this time and core length is reported. Drill hole MH27-07 was drilled as a step-out to follow up on these zones; however, did not encounter the same zone. Additional interpretation is ongoing to determine the geometry of the zones, and optimal orientation for follow up drilling.

Both MH27-06 and MH27-07 also intersected a mineralized zone in the hanging wall, 25 m up-hole from the E1E-Zone, returning 25.71 g/t Au (25.71 g/t cut) over 5.0 m, and 10.35 g/t Au (10.35 g/t cut) over 4.65 m, respectively. True width is unknown at this time and core length is reported.

Underground Exploration Drilling

Underground drilling from the 620- and 840-level exploration drifts continues to extend high-grade gold mineralization along strike to the east of Mineral Reserves and Resources in the middle portion of Island East (between vertical depths of 500 m and 1,000 m). Drillhole 840-632-11 was drilled from the eastern extent of the 840-level exploration drift and intersected 14.82 g/t Au (14.82 g/t cut) over 3.68 m , 120 m to the east of the nearest Mineral Resource.

New highlights in the E1E-Zone include (Figure 1, Table 2):

  • 49.51 g/t Au (49.51 g/t cut) over 2.27 m (840-608-34);
  • 27.22 g/t Au (27.22 g/t cut) over 2.16 m (620-580-09);
  • 14.82 g/t Au (14.82 g/t cut) over 3.68m (840-632-11);
  • 24.41 g/t Au (24.41 g/t cut) over 2.13 m (840-608-32);
  • 25.27 g/t Au (21.18 g/t cut) over 2.36 m (620-624-09);
  • 11.50 g/t Au (11.50 g/t cut) over 2.73 m (620-633-08);
  • 12.17 g/t Au (12.17 g/t cut) over 2.39 m (840-584-35); and
  • 10.48 g/t Au (10.48 g/t cut) over 2.25 m (620-562-10).

Other Zones

The Island Gold Deposit consists of a number of sub-parallel mineralized structures, with the majority of Mineral Reserves and Resources defined in the C/E1E structure which constitute the main production horizons at the Island Gold Mine. As underground development advances, these sub-parallel hanging wall and footwall structures can be targeted with step-out drilling from underground drill platforms. As demonstrated with the above noted newly defined B, G, and G1 Zones, through additional drilling these zones have the potential to be converted into new Mineral Reserves and Resources adjacent to existing underground infrastructure.

High-grade gold mineralization has been previously intersected from surface and underground drilling throughout the hanging wall and footwall across the 2 km strike extent of the Island Gold Deposit. These intersections are high-priority exploration targets outside of the main C/E1E Zone, which currently hosts the majority (94%) of the known Mineral Reserves and Resources at the Island Gold Mine.

Step-out underground exploration drilling targeting these zones can be completed once underground development has been established. This drilling allows for the confirmation of the geometry and potential continuity of mineralization with the objective of defining new Mineral Resources. These hanging wall and footwall exploration opportunities provide potential further upside to define additional Mineral Reserves and Resources outside of the main C/E1E-Zone in proximity to underground development, which would enhance the ounce per vertical metre profile, and provide multiple mining horizons from the same lateral development levels.

The following are highlights of new hanging wall and footwall intersections from underground and surface exploration drilling where the geometry and continuity is not yet established (“Unknown Zone”) (reported composite intervals are core lengths) (Tables 1 and 2):

  • 116.04 g/t Au (116.04 g/t cut) over 2.80 m (840-632-07);
  • 20.67 g/t Au (20.67 g/t cut) over 13.50 m (MH27-06);
  • 29.81 g/t Au (29.81 g/t cut) over 6.40 m (MH27-06);
  • 10.35 g/t Au (10.35 g/t cut) over 4.65 m (MH27-06);
  • 58.54 g/t Au (58.54 g/t cut) over 2.60 m (840-572-37);
  • 53.22 g/t Au (53.22 g/t cut) over 2.50 m (360-594-01);
  • 49.57 g/t Au (49.57 g/t cut) over 2.10 m (840-632-05);
  • 41.28 g/t Au (41.28 g/t cut) over 2.10 m (840-632-10);
  • 31.02 g/t Au (31.02 g/t cut) over 2.20 m (840-632-08);
  • 11.75 g/t Au (11.75 g/t cut) over 2.20 m (620-633-01);
  • 11.33 g/t Au (11.33 g/t cut) over 3.05 m (340-608-07);
  • 12.13 g/t Au (12.13 g/t cut) over 2.75 m (770-467-14); and
  • 14.86 g/t Au (14.86 g/t cut) over 2.20 m (360-594-04).

Qualified Persons

Scott R.G. Parsons, P.Geo., FAusIMM, Alamos Gold’s Vice President, Exploration, has reviewed and approved the scientific and technical information contained in this news release. Scott R.G. Parsons is a “Qualified Person” as defined by Canadian Securities Administrators’ National Instrument 43-101 - Standards of Disclosure for Mineral Projects.

Exploration programs at the Island Gold Mine are directed by Raynald Vincent, P.Eng., M.G.P., Exploration Superintendent at the Island Gold Mine. Raynald Vincent is a “Qualified Person” as defined by Canadian Securities Administrators’ National Instrument 43-101 - Standards of Disclosure for Mineral Projects.

Quality Assurance and Quality Control

Alamos Gold maintains an internal Quality Assurance / Quality Control (QA/QC) program at the Island Gold Mine to ensure sampling and analysis of all exploration work is conducted in accordance with best practices.

Access to the Island Gold Mine is controlled by security personnel. Drill core is logged and sampled at the core logging facility within the mine site under the supervision of a Qualified Geologist. A geologist marks the individual samples for analysis, and sample intervals, sample numbers, standards and blanks are entered into the database. The core is cut in half using an electric core saw equipped with a diamond tipped blade. One half of the core is placed into a plastic sample bag and sealed with zip ties in preparation for shipment. The other half of the core is returned to the core box and retained for future reference. The samples are placed in large heavy-duty nylon reinforced Fabrene bags, which are identified and sealed before being placed on pallets. The core samples are picked up at the mine site and delivered to AGAT laboratory in Thunder Bay, Ontario.

Gold is analyzed by a 50 grams fire assay with an Atomic Absorption (AA) finish. Samples greater than 10.0 g/t Au are re-analyzed using gravimetric finish methods. AGAT is a certified laboratory and has internal quality control (“QC”) programs that include insertion of reagent blanks, reference materials, and pulp duplicates.

The Corporation inserts QC samples (blanks and reference materials) at regular intervals to monitor laboratory performance. Cross check assays are completed on a regular basis in a secondary accredited laboratory. The QA/QC procedures are more completely described in the Technical Report filed on SEDAR August 29, 2022.

About Alamos

Alamos is a Canadian-based intermediate gold producer with diversified production from three operating mines in North America. This includes the Young-Davidson and Island Gold mines in northern Ontario, Canada and the Mulatos mine in Sonora State, Mexico. Additionally, the Company has a strong portfolio of growth projects, including the Phase 3+ Expansion at Island Gold, and the Lynn Lake project in Manitoba, Canada. Alamos employs more than 1,900 people and is committed to the highest standards of sustainable development. The Company’s shares are traded on the TSX and NYSE under the symbol “AGI”.

FOR FURTHER INFORMATION, PLEASE CONTACT:

Scott K. Parsons
Vice President, Investor Relations
(416) 368-9932 x 5439

All amounts are in United States dollars, unless otherwise stated.

The TSX and NYSE have not reviewed and do not accept responsibility for the adequacy or accuracy of this release.

Cautionary Note

This news release includes certain statements that constitute forward-looking information within the meaning of applicable Canadian and U.S. securities laws ("forward-looking statements"). All statements in this news release other than statements of historical fact, which address events, results, outcomes or developments that Alamos expects to occur are forward-looking statements. Forward-looking statements are generally, but not always, identified by the use of forward-looking terminology such as “continue”, "expect", "plan", "estimate", “target”, “budget”, “prospective” or “potential” or variations of such words and phrases and similar expressions or statements that certain actions, events or results "may", "could", "would", "might" or "will" be taken, occur or be achieved or the negative connotation of such terms.

Such statements in this news release include, without limitation, statements with respect to planned exploration programs and focuses, potential drilling results and related expectations, costs and expenditures, project economics, gold price assumptions, potential mineralization, projected ore grades, opportunities to add near mine and further high-grade Mineral Reserves and Resources, potential additions to the mine plan, extension of Inferred Mineral Resources, expected increases in the value of operations, and other information that is based on forecasts and projections of future operational, geological or financial results, estimates of amounts not yet determinable and assumptions of management.

Exploration results that include geophysics, sampling, and drill results on wide spacings may not be indicative of the occurrence of a mineral deposit. Such results do not provide assurance that further work will establish sufficient grade, continuity, metallurgical characteristics and economic potential to be classed as a category of Mineral Resource. A Mineral Resource that is classified as "inferred" or "indicated" has a great amount of uncertainty as to its existence and economic and legal feasibility. It cannot be assumed that any or part of an "Indicated Mineral Resource" or "Inferred Mineral Resource" will ever be upgraded to a higher category of Mineral Resource. Investors are cautioned not to assume that all or any part of mineral deposits in these categories will ever be converted into Proven and Probable Mineral Reserves.

Alamos cautions that forward-looking statements are necessarily based upon several factors and assumptions that, while considered reasonable by management at the time of making such statements, are inherently subject to significant business, economic, technical, legal, political and competitive uncertainties and contingencies. Known and unknown factors could cause actual results to differ materially from those projected in the forward-looking statements, and undue reliance should not be placed on such statements and information.

These factors and assumptions include, but are not limited to: the actual results of current exploration activities, conclusions of economic and geological evaluations, changes in project parameters as plans continue to be refined, operations may be exposed to widespread pandemic; the impact of the COVID-19 pandemic on the broader market; state and federal orders or mandates (including with respect to mining operations generally or auxiliary businesses or services required for the Company’s operations) in Canada, Mexico and other jurisdictions in which the Company does or may conduct business; the duration of regulatory responses to the COVID-19 pandemic; changes in national and local government legislation, controls or regulations; failure to comply with environmental and health and safety laws and regulations; labour and contractor availability (and being able to secure the same on favourable terms); ability to sell or deliver gold doré bars; disruptions in the maintenance or provision of required infrastructure and information technology systems; fluctuations in the price of gold or certain other commodities such as, diesel fuel, natural gas, and electricity; operating or technical difficulties in connection with mining or development activities, including geotechnical challenges and changes to production estimates (which assume accuracy of projected ore grade, mining rates, recovery timing and recovery rate estimates and may be impacted by unscheduled maintenance); changes in foreign exchange rates (particularly the Canadian dollar, U.S. dollar, and Mexican peso); the impact of inflation; employee and community relations; litigation and administrative proceedings; disruptions affecting operations; availability of and increased costs associated with mining inputs and labour; delays in the development or updating of mine plans; inherent risks and hazards associated with mining and mineral processing including environmental hazards, industrial accidents, unusual or unexpected formations, pressures and cave-ins; the risk that the Company’s mines may not perform as planned; uncertainty with the Company's ability to secure additional capital to execute its business plans; the speculative nature of mineral exploration and development, risks in obtaining and maintaining necessary licenses, permits and authorizations, contests over title to properties; expropriation or nationalization of property; political or economic developments in Canada or Mexico and other jurisdictions in which the Company may carry on business in the future; increased costs and risks related to the potential impact of climate change; the costs and timing of construction and development of new deposits; risk of loss due to sabotage, protests and other civil disturbances; the impact of global liquidity and credit availability and the values of assets and liabilities based on projected future cash flows; and business opportunities that may be pursued by the Company.

For a more detailed discussion of such risks and other factors that may affect the Company's ability to achieve the expectations set forth in the forward-looking statements contained in this news release, see the Company’s latest 40-F/Annual Information Form and Management’s Discussion and Analysis, each under the heading “Risk Factors”, available on the SEDAR website at www.sedar.com or on EDGAR at www.sec.gov. The foregoing should be reviewed in conjunction with the information and risk factors and assumptions found in this news release.

The Company disclaims any intention or obligation to update or revise any forward-looking statements, whether written or oral, or whether as a result of new information, future events or otherwise, except as required by applicable law.

Note to U.S. Investors – Mineral Reserve and Resource Estimates

Unless otherwise indicated, all Mineral Resource and Mineral Reserve estimates included in this news release have been prepared in accordance with National Instrument 43-101 - Standards of Disclosure for Mineral Projects (“NI 43-101”) and the Canadian Institute of Mining, Metallurgy and Petroleum (the “CIM”) - CIM Definition Standards on Mineral Resources and Mineral Reserves, adopted by the CIM Council, as amended (the “CIM Standards”). NI 43-101 is a rule developed by the Canadian Securities Administrators, which established standards for all public disclosure an issuer makes of scientific and technical information concerning mineral projects. Mining disclosure in the United States was previously required to comply with SEC Industry Guide 7 (“SEC Industry Guide 7”) under the United States Securities Exchange Act of 1934, as amended. The U.S. Securities and Exchange Commission (the “SEC”) has adopted final rules, to replace SEC Industry Guide 7 with new mining disclosure rules under sub-part 1300 of Regulation S-K of the U.S. Securities Act (“Regulation S-K 1300”) which became mandatory for U.S. reporting companies beginning with the first fiscal year commencing on or after January 1, 2021. Under Regulation S-K 1300, the SEC now recognizes estimates of “Measured Mineral Resources”, “Indicated Mineral Resources” and “Inferred Mineral Resources”. In addition, the SEC has amended its definitions of “Proven Mineral Reserves” and “Probable Mineral Reserves” to be substantially similar to international standards.

Investors are cautioned that while the above terms are “substantially similar” to CIM Definitions, there are differences in the definitions under Regulation S-K 1300 and the CIM Standards. Accordingly, there is no assurance any mineral reserves or mineral resources that the Company may report as “proven mineral reserves”, “probable mineral reserves”, “measured mineral resources”, “indicated mineral resources” and “inferred mineral resources” under NI 43-101 would be the same had the Company prepared the mineral reserve or mineral resource estimates under the standards adopted under Regulation S-K 1300. U.S. investors are also cautioned that while the SEC recognizes “measured mineral resources”, “indicated mineral resources” and “inferred mineral resources” under Regulation S-K 1300, investors should not assume that any part or all of the mineralization in these categories will ever be converted into a higher category of mineral resources or into mineral reserves. Mineralization described using these terms has a greater degree of uncertainty as to its existence and feasibility than mineralization that has been characterized as reserves. Accordingly, investors are cautioned not to assume that any measured mineral resources, indicated mineral resources, or inferred mineral resources that the Company reports are or will be economically or legally mineable.


Table 1: Island Gold – Previously Unreleased Select Composite Intervals from Surface Exploration Drilling

Composite intervals greater than 3 g/t Au weighted average, capping values:
Island Main and East @ 185 g/t Au, Island West @ 225 g/t Au.

Hole ID
Zone
Target Area
From (m)
To (m)
Core Length (m)
True Width (m)
Au Uncut (g/t)
Au Cut (g/t)
Vertical Depth (m)
MH27-06
E1E
Island East
1615.34
1624.50
9.16
7.28
10.45
10.45
1538
MH27-07
E1E
Island East
1615.85
1626.15
10.30
8.01
22.17
22.17
1540
MH27-08
E1E
Island East
1586.00
1595.30
9.30
7.79
110.17
52.08
1502
MH30-02
E1E
Island Main
1811.50
1814.75
3.25
2.50
23.21
23.21
1666
MH33-01
C
Island West
785.90
795.10
9.20
5.05
97.21
58.55
733
MH27-06
Unknown
Island East
1589.00
1594.00
5.00
25.71
25.71
1511
MH27-06
Unknown
Island East
1751.20
1757.60
6.40
29.81
29.81
1666
MH27-06
Unknown
Island East
1769.90
1783.40
13.50
20.67
20.67
1687
MH27-07
Unknown
Island East
1585.20
1589.85
4.65
10.35
10.35
1508


Table 2: Island Gold – Previously Unreleased Select Composite Intervals from Underground Exploration Drilling

Composite intervals greater than 3 g/t Au weighted average, capping values:
Island West (C-zone) @ 225 g/t Au; Island Main and East (E1E Zone) @ 185 g/t Au. B Zone @ 90 g/t Au; D1 and G1 Zones @ 45 g/t Au; G Zone @ 70 g/t Au.

Hole ID
Zone
Target Area
From (m)
To (m)
Core Length (m)
True Width (m)
Au Uncut (g/t)
Au Cut (g/t)
Vertical Depth (m)
770-467-08
B
Island West
12.15
14.80
2.65
2.53
9.48
9.48
790
770-467-10
B
Island West
16.90
20.55
3.65
2.65
73.16
47.35
780
770-467-11
B
Island West
33.90
40.40
6.50
5.07
34.41
22.77
781
770-467-12
B
Island West
12.10
15.15
3.05
2.33
525.28
80.26
783
770-467-13
B
Island West
16.20
19.45
3.25
2.58
226.16
32.33
777
770-467-14
B
Island West
17.70
20.30
2.60
2.53
37.75
36.54
776
770-468-01A
B
Island West
13.00
15.90
2.90
2.61
91.14
35.59
787
770-468-02
B
Island West
16.20
19.95
3.75
3.15
72.03
44.05
782
770-468-03
B
Island West
14.00
16.20
2.20
2.11
51.17
37.18
790
770-468-04A
B
Island West
13.75
16.80
3.05
3.02
7.37
7.37
793
770-468-05
B
Island West
14.00
17.00
3.00
2.56
3.13
3.13
785
770-468-07
B
Island West
15.00
17.60
2.60
2.32
38.96
20.83
792
770-471-02
B
Island West
48.00
50.30
2.30
2.27
6.21
6.21
805
770-474-16
B
Island West
8.70
10.90
2.20
2.02
4.22
4.22
790
770-474-19
B
Island West
7.50
10.20
2.70
2.45
6.35
6.35
795
790-450-01
B
Island West
182.90
185.40
2.50
2.10
5.50
5.50
846
790-450-02
B
Island West
159.65
161.75
2.10
2.07
31.79
26.36
798
790-459-01
B
Island West
337.00
340.90
3.90
2.03
8.65
8.65
1077
790-459-02
B
Island West
287.00
292.00
5.00
2.12
3.75
3.75
1019
790-459-03
B
Island West
213.95
216.45
2.50
2.40
9.29
9.29
898
790-460-07
B
Island West
197.30
202.80
5.50
3.20
8.83
8.83
703
740-471-44A
C
Island West
870.00
875.00
5.00
2.53
3.15
3.15
1478
790-450-01
C
Island West
148.45
150.80
2.35
2.03
3.19
3.19
842
790-450-03
C
Island West
163.10
166.90
3.80
2.28
5.18
5.18
889
790-450-06
C
Island West
193.80
197.60
3.80
2.18
22.40
22.40
940
790-459-01
C
Island West
299.50
304.20
4.70
2.49
3.75
3.75
1049
790-460-05
C
Island West
110.75
113.85
3.10
2.99
3.35
3.35
809
790-460-05A
C
Island West
110.00
113.60
3.60
3.50
5.75
5.75
809
790-460-06
C
Island West
99.10
103.00
3.90
3.69
8.37
8.37
786
790-460-07
C
Island West
112.00
114.70
2.70
2.27
12.83
12.83
756
790-460-10
C
Island West
104.70
107.90
3.20
2.79
12.07
12.07
766
790-465-12
C
Island West
107.00
112.00
5.00
2.18
13.91
13.91
898
790-465-13B
C
Island West
89.30
92.30
3.00
2.02
11.29
11.29
876
840-530-05
C
Island West
705.00
710.60
5.60
2.14
5.89
5.89
1464
790-450-05
D1
Island West
93.50
96.30
2.80
2.46
15.25
10.92
863
790-450-06
D1
Island West
101.30
104.50
3.20
2.61
4.06
4.06
887
340-608-07
E1E
Island East
88.10
90.80
2.70
2.14
3.71
3.71
260
620-562-03
E1E
Island East
128.40
131.30
2.90
2.66
4.66
4.66
517
620-562-04
E1E
Island East
135.40
139.00
3.60
3.14
5.04
5.04
497
620-562-10
E1E
Island East
250.25
253.45
3.20
2.25
10.48
10.48
740
620-580-09
E1E
Island East
85.20
87.60
2.40
2.16
27.22
27.22
545
620-624-09
E1E
Island East
100.70
103.40
2.70
2.36
25.27
21.18
570
620-624-10
E1E
Island East
93.00
95.40
2.40
2.22
5.31
5.31
542
620-624-13
E1E
Island East
209.85
214.70
4.85
2.28
3.82
3.82
702
620-633-05
E1E
Island East
91.40
94.80
3.40
2.76
4.32
4.32
509
620-633-08
E1E
Island East
85.80
88.60
2.80
2.73
11.50
11.50
565
840-584-35
E1E
Island East
168.95
171.35
2.40
2.39
12.17
12.17
782
840-584-36
E1E
Island East
166.10
168.80
2.70
2.69
4.01
4.01
808
840-590-27
E1E
Island East
161.70
164.50
2.80
2.08
6.07
6.07
906
840-608-32
E1E
Island East
135.25
137.60
2.35
2.13
24.41
24.41
803
840-608-34
E1E
Island East
146.00
148.70
2.70
2.27
49.51
49.51
811
840-632-02
E1E
Island East
141.00
143.50
2.50
2.40
3.10
3.10
829
840-632-05
E1E
Island East
135.00
137.15
2.15
2.08
6.31
6.31
840
840-632-11
E1E
Island East
157.25
161.50
4.25
3.68
14.82
14.82
754
920-630-06
E1E
Island East
94.10
97.40
3.30
2.14
5.81
5.81
945
770-467-08
G
Island West
71.70
74.00
2.30
2.14
22.81
22.81
796
770-468-02
G
Island West
74.00
76.20
2.20
2.11
4.00
4.00
766
770-471-01A
G
Island West
90.00
92.65
2.65
2.14
5.86
5.86
837
770-471-02
G
Island West
72.80
75.60
2.80
2.34
14.01
13.65
813
770-474-26
G
Island West
80.35
83.00
2.65
2.59
10.20
10.20
744
770-467-13
G1
Island West
149.20
151.80
2.60
2.02
50.55
5.78
704
770-467-14
G1
Island West
153.00
155.70
2.70
2.33
37.15
15.97
697
770-474-17
G1
Island West
107.30
110.80
3.50
3.44
7.00
7.00
782
770-474-18
G1
Island West
104.50
106.70
2.20
2.14
4.06
4.06
767
770-474-19
G1
Island West
124.40
127.00
2.60
2.00
38.50
19.68
859
770-474-20
G1
Island West
104.00
107.00
3.00
2.96
7.24
7.24
765
770-474-22
G1
Island West
115.05
117.65
2.60
2.31
9.32
9.32
827
770-474-23
G1
Island West
108.05
110.45
2.40
2.13
5.13
5.13
831
340-608-07
Unknown
80.50
83.55
3.05
11.33
11.33
265
360-594-01
Unknown
147.70
149.90
2.20
3.10
3.10
349
360-594-01
Unknown
203.20
206.40
3.20
5.19
5.19
353
360-594-01
Unknown
52.70
55.20
2.50
53.22
53.22
344
360-594-03
Unknown
211.90
214.10
2.20
5.35
5.35
278
360-594-04
Unknown
50.20
52.40
2.20
14.86
14.86
344
620-633-01
Unknown
56.60
58.80
2.20
11.75
11.75
576
740-471-46
Unknown
101.00
104.60
3.60
4.11
4.11
830
740-471-46
Unknown
336.70
340.55
3.85
6.96
6.96
984
740-471-47
Unknown
376.80
379.70
2.90
9.97
9.97
994
770-467-10
Unknown
23.65
26.80
3.15
6.33
6.33
778
770-467-13
Unknown
27.25
30.05
2.80
4.05
4.05
771
770-467-14
Unknown
27.80
30.55
2.75
12.13
12.13
770
790-450-01
Unknown
142.70
145.10
2.40
3.08
3.08
841
790-450-01
Unknown
33.70
36.75
3.05
7.01
7.01
829
790-450-01
Unknown
54.40
56.65
2.25
7.60
7.60
831
790-450-03
Unknown
57.10
59.90
2.80
3.68
3.68
848
790-450-03
Unknown
31.10
34.95
3.85
4.54
4.54
838
790-450-04
Unknown
301.70
304.40
2.70
3.26
3.26
687
790-450-05
Unknown
28.30
30.70
2.40
9.10
7.91
838
840-572-37
Unknown
159.00
161.60
2.60
58.54
58.54
972
840-572-38
Unknown
206.20
208.55
2.35
3.80
3.80
1006
840-632-04
Unknown
106.65
109.00
2.35
3.03
3.03
796
840-632-05
Unknown
131.10
133.20
2.10
49.57
49.57
840
840-632-07
Unknown
146.10
148.90
2.80
116.04
116.04
913
840-632-08
Unknown
103.30
105.70
2.40
5.60
5.60
776
840-632-08
Unknown
109.10
111.30
2.20
31.02
31.02
773
840-632-10
Unknown
101.60
103.70
2.10
41.28
41.28
857


Table 3: Surface exploration drill holes; azimuth, dip, drilled length, and collar location at surface (UTM NAD83)

Hole ID
Azimuth (°)
Dip
(°)
Drilled Length (m)
UTM Easting (m)
UTM Northing (m)
UTM Elevation (m)
Comments
MH25-12
335
-80
861
692320
5351076
393
Cut from MH25-11 at 1006 m
MH26-06
339
-79
1098
692210
5351208
394
Cut from MH26-05 at 671 m
MH26-07
339
-79
995
692210
5351208
394
Cut from MH26-06 at 843 m
MH26-08
339
-79
615
692210
5351208
394
Cut from MH26-07 at 1202 m
MH27-03
338
-76
614
692344
5351146
392
Cut from MH27-02 at 1113 m
MH27-04
338
-76
937
692344
5351146
392
Cut from MH27-03 at 823 m
MH27-06
338
-76
1413
692344
5351146
392
Cut from MH27-01 at 563 m
MH27-07
338
-76
593
692344
5351146
392
Cut from MH27-06 at 1399 m
MH27-08
338
-76
1395
692344
5351146
392
Cut from MH27-01 at 605 m
MH28-02
253
-84
763
692701
5351670
391
Cut from MH28-01B at 1152 m
MH28-03
253
-84
1216
692701
5351670
391
Cut from MH28-01B at 763 m
MH28-04
253
-84
954
692701
5351670
391
Cut from MH28-03 at 1043 m
MH28-05
253
-84
974
692701
5351670
391
Cut from MH28-01A at 1060 m
MH29-01
308
-79
1757
691319
5350979
395
MH29-02
308
-79
1314
691319
5350979
395
Cut from MH29-01 at 518 m
MH30-01
325
-77
1985
692051
5350830
394
MH30-02
325
-77
671
692051
5350830
394
Cut from MH30-01 at 1255 m
MH31-01
338
-80
1779
691003
5350847
395
MH31-02
338
-80
628
691003
5350847
395
Cut from MH31-01 at 1225 m
MH31-03
338
-80
840
691003
5350847
395
Cut from MH31-01 at 1049 m
MH33-01
318
-72
981
690225
5351183
382
21IGX009
344
-59
1013
692312
5351992
401
21IGX010
316
-65
1452
692595
5351636
396
21IGX011
331
-51
754
691961
5351901
394
21IGX012
331
-62
755
691961
5351901
394
21IGX013
312
-57
1304
692593
5351639
390
21IGX013W1
312
-57
550
692593
5351639
390
Cut from 21IGX013 at 751 m
21IGX014
331
-45
720
691961
5351901
394

Note: UTM mine surface elevation 393 m


Table 4: Underground exploration drill holes; azimuth, dip, drilled length, and collar location at surface (UTM NAD83).

Hole ID
Azimuth (°)
Dip (°)
Drilled Length (m)
UTM Easting (m)
UTM Northing (m)
UTM Elevation (m)
340-608-04
148
-18
135
691517
5352227
62
340-608-05
148
-31
189
691517
5352227
62
340-608-06
148
-38
237
691517
5352227
61
340-608-07
158
51
126
691517
5352227
65
340-614-01
146
-36
231
691571
5352255
63
340-614-02
159
-25
168
691570
5352255
63
340-614-03A
147
-10
228
691570
5352254
64
340-614-04
156
49
126
691570
5352255
66
360-594-01
330
1
351
691390
5352160
50
360-594-03
330
19
228
691391
5352160
50
360-594-04
349
1
219
691392
5352161
49
620-562-03
145
45
162
691130
5351956
-217
620-562-04
145
55
168
691130
5351956
-217
620-562-05
158
34
159
691130
5351955
-220
620-562-06
158
12
165
691130
5351955
-220
620-562-07
181
44
168
691130
5351955
-220
620-562-09
168
-27
270
691130
5351955
-220
620-562-10
162
-31
285
691130
5351955
-220
620-562-11
159
-22
240
691130
5351955
-220
620-562-12
151
-28
261
691130
5351955
-220
620-580-08
128
74
159
691311
5351989
-212
620-580-09
134
44
120
691313
5351988
-213
620-623-14
154
-33
271
691707
5352177
-208
620-624-02A
134
30
129
691714
5352180
-206
620-624-03
139
56
132
691713
5352179
-206
620-624-04
144
-35
282
691713
5352180
-209
620-624-05
146
-23
195
691713
5352180
-208
620-624-08
201
46
135
691711
5352179
-205
620-624-09
186
15
129
691711
5352179
-207
620-624-10
184
37
126
691713
5352179
-208
620-624-11
169
-13
186
691712
5352179
-208
620-624-12
162
-22
201
691712
5352179
-209
620-624-13
149
-31
243
691712
5352179
-208
620-624-14
141
-32
270
691712
5352180
-209
620-624-15
144
-25
261
691712
5352180
-209
620-624-16
176
21
114
691711
5352179
-207
620-624-17
169
-19
186
691712
5352179
-208
620-633-01
130
21
129
691794
5352217
-205
620-633-02
136
-31
276
691794
5352217
-207
620-633-03
138
-8
162
691794
5352217
-206
620-633-05
148
70
159
691793
5352217
-203
620-633-06A
150
-19
186
691793
5352217
-206
620-633-07
154
-27
225
691793
5352217
-206
620-633-08
166
22
126
691793
5352216
-205
740-471-40A
133
-66
845
690297
5351608
-369
740-471-44A
106
-63
933
690297
5351608
-369
740-471-46
333
-40
834
690293
5351610
-369
740-471-47
304
-35
930
690288
5351608
-369
770-467-08
145
-6
87
690303
5351482
-395
770-467-09
136
10
84
690303
5351483
-395
770-467-10
148
22
87
690303
5351483
-394
770-467-11
158
11
57
690302
5351483
-395
770-467-12
173
19
90
690302
5351482
-394
770-467-13
170
31
159
690302
5351482
-393
770-467-14
178
35
168
690302
5351482
-394
770-468-01A
177
6
96
690310
5351486
-395
770-468-02
165
17
90
690310
5351486
-395
770-468-03
165
-6
93
690310
5351486
-396
770-468-04A
160
-15
96
690310
5351486
-396
770-468-05
149
11
84
690311
5351486
-395
770-468-06
141
-1
87
690311
5351486
-395
770-468-07
145
-12
96
690311
5351486
-396
770-471-01A
160
-30
138
690348
5351496
-397
770-471-02
175
-17
125
690348
5351496
-397
770-474-16
140
-1
138
690370
5351502
-396
770-474-17
149
4
144
690370
5351502
-396
770-474-18
158
11
162
690370
5351501
-396
770-474-19
159
-33
168
690369
5351501
-397
770-474-20
166
13
168
690369
5351501
-396
770-474-21
166
-12
153
690369
5351501
-397
770-474-22
171
-18
150
690369
5351501
-397
770-474-23
175
-22
156
690369
5351501
-397
770-474-24
150
-3
165
690370
5351502
-396
770-474-25
139
31
126
690370
5351502
-395
770-474-26
156
32
126
690370
5351502
-395
770-474-28
145
12
123
690370
5351502
-396
790-450-01
188
-5
195
690104
5351528
-433
790-450-02
183
9
195
690105
5351528
-432
790-450-03
188
-21
200
690104
5351528
-433
790-450-04
163
24
321
690105
5351528
-431
790-450-05
157
-23
204
690106
5351529
-433
790-450-06
153
-36
258
690106
5351529
-433
790-459-01
149
-47
402
690167
5351590
-434
790-459-02
159
-41
324
690167
5351590
-434
790-459-03
164
-21
282
690167
5351590
-434
790-460-02
147
-17
192
690192
5351553
-434
790-460-03
156
-10
159
690192
5351553
-434
790-460-04
161
-21
234
690192
5351553
-434
790-460-05
170
9
189
690192
5351552
-433
790-460-05A
170
9
189
690191
5351552
-434
790-460-06
173
24
237
690192
5351552
-432
790-460-07
173
38
225
690191
5351552
-431
790-460-08
175
48
186
690193
5351553
-431
790-460-09
164
41
201
690194
5351554
-432
790-460-10
164
34
186
690194
5351553
-432
790-460-11
168
17
180
690193
5351553
-433
790-460-12
164
25
120
690194
5351554
-433
790-465-12
152
-44
399
690256
5351538
-429
790-465-13B
159
-36
147
690256
5351538
-429
840-530-04A
178
-64
852
690848
5351794
-469
840-530-05
178
-64
249
690848
5351794
-469
840-572-37
162
-47
396
691247
5351951
-460
840-572-38
154
-46
396
691247
5351951
-460
840-584-31
146
24
207
691378
5351957
-454
840-584-34
151
34
198
691378
5351957
-454
840-584-35
152
22
201
691378
5351957
-455
840-584-36
155
13
186
691378
5351957
-455
840-584-37
159
34
198
691377
5351957
-454
840-590-24
153
-26
183
691442
5351958
-455
840-590-27
137
-21
207
691442
5351958
-455
840-602-30
176
-11
177
691560
5351985
-453
840-608-30
169
-11
171
691617
5352008
-452
840-608-32
147
16
150
691618
5352008
-451
840-608-34
141
12
162
691618
5352008
-451
840-608-38
151
-5
174
691618
5352008
-452
840-632-01
122
-15
174
691836
5352115
-447
840-632-02
122
3
168
691833
5352113
-447
840-632-03
120
22
171
691836
5352116
-446
840-632-04
137
20
156
691836
5352115
-446
840-632-05
140
-3
156
691836
5352115
-446
840-632-06C
133
55
177
691833
5352113
-447
840-632-07
146
-29
201
691835
5352115
-448
840-632-08
146
34
153
691836
5352115
-445
840-632-09
159
51
165
691835
5352115
-444
840-632-10
172
-10
186
691834
5352114
-447
840-632-11
107
30
192
691836
5352117
-445
840-632-12A
109
14
237
691833
5352113
-447
840-632-13
109
-12
201
691836
5352116
-447
920-630-05
190
7
90
691853
5352006
-534
920-630-06
192
-13
111
691854
5352006
-534
920-630-07
186
-28
123
691854
5352006
-534
920-630-09
174
16
99
691855
5352006
-532
920-630-10
168
-22
102
691855
5352007
-534
920-630-11
147
19
87
691856
5352007
-532
920-630-12
172
-7
81
691855
5352006
-533
920-630-13
177
34
102
691855
5352006
-531
920-630-14
196
32
123
691854
5352006
-531
920-630-15
206
17
120
691853
5352005
-532

Note: UTM mine surface elevation 393 m


Figure 1: Island Gold Mine – C/E1E/E1EN Longitudinal, New Underground and Surface Exploration Drilling Results


Figure 2: Island Gold West (C-Zone) Longitudinal – Surface and Underground Exploration Drilling Results


Figure 3: Island Gold East (E1E-Zone) Longitudinal – Underground Exploration Drilling Results


Figure 4: Island Gold Mine B-Zone Longitudinal – Underground Exploration Drilling Results


Figure 5: Island Gold Mine G-Zone Longitudinal – Underground Exploration Drilling Results


Figure 6: Island Gold Mine G1-Zone Longitudinal – Underground Exploration Drilling Results


Photos accompanying this announcement are available at

https://www.globenewswire.com/NewsRoom/AttachmentNg/7148aeb8-c0b0-4873-a09f-46fbc0be497e

https://www.globenewswire.com/NewsRoom/AttachmentNg/ed1bc839-df01-42a1-80da-886c18913d16

https://www.globenewswire.com/NewsRoom/AttachmentNg/d7b79e25-db59-4cd5-9ad8-8e8f01de132f

https://www.globenewswire.com/NewsRoom/AttachmentNg/ef0046dd-02e0-4170-9539-40e4e0b0e609

https://www.globenewswire.com/NewsRoom/AttachmentNg/43aefbdc-dcb4-4ca7-9160-8b14cff121c2

https://www.globenewswire.com/NewsRoom/AttachmentNg/3833a095-738d-47ba-9ec1-3ab71f8b9191


Stock Information

Company Name: Alamos Gold Inc. Class A
Stock Symbol: AGI
Market: NYSE
Website: alamosgold.com

Menu

AGI AGI Quote AGI Short AGI News AGI Articles AGI Message Board
Get AGI Alerts

News, Short Squeeze, Breakout and More Instantly...