Twitter

Link your Twitter Account to Market Wire News


When you linking your Twitter Account Market Wire News Trending Stocks news and your Portfolio Stocks News will automatically tweet from your Twitter account.


Be alerted of any news about your stocks and see what other stocks are trending.



home / news releases / ARSMF - Ares Strategic Mining Announces Lumps Plant Arrival at its Utah Site


ARSMF - Ares Strategic Mining Announces Lumps Plant Arrival at its Utah Site

(TheNewswire)



Highlights Include:

  • The plant will be the first of its kind in NorthAmerica.

  • Once operational the plant will produce the onlydomestic supply of fluorspar in the US.

  • Plant optimization expertise supplied by internationalfluorspar producers.

  • Product predominantly anticipated to fuel the steelindustry.

  • Significant interest expressed in Ares’ anticipatedproducts by international and domestic manufacturers.

Vancouver, B.C. - TheNewswire - March 1st, 2022— Ares Strategic Mining Inc. (the “Company”) (CSE:ARS) (OTC:ARSMF) (FRA:N8I1), is pleased toannounce that the Company’s metallurgical lumps plant has arrived atis industrial site in Delta, Utah. The plant is a large 3-storeyfacility, which will be the only one of its kind in North America. Theplant was shipped from Asia and was routed through Long Beach,California.

Ares’ strategic partner in Asia, the Mujim Group, has committed toprovide labor and expertise for the installation and optimization ofthe plant. Mujim has already commissioned several fluorspar miningoperations in Asia, most notably in Thailand and Laos, and have agreedto share their expertise and experience to assist Ares commenceoperations as efficiently as possible. Mujim’s Executive Chairman,Mr. Bob Li, will oversee the installation and initial production, andwill be appointed as the Chief Technology Officer for the plantcommissioning.

Industrial manufacturers, both international anddomestic, have expressed considerable interest in the product and arecurrently in negotiations with the Company to develop contracts forfuture purchases of the metallurgical fluorspar lumps. The lumps areexpected to principally supply the steel industry, but will also feedinto the ceramics and glass industries.


Click Image To View Full Size

Several Components of Ares’ Lumps Plant

James Walker, President and CEO of the Company said,“All the components of our operation, construction, and productionare lining up. We are planning to coincide the work to begin themining with the infrastructure and processing construction, as well asthe release of negotiated US government grants allocated for ourproject. We have obtained enormous support locally, with nearbyoperations offering to assist us with the supply of power, land, andeven rail spurs for shipping our product. We have long-term plans forproject and Company expansion over the coming years and anticipatebecoming an important part of the US industrial landscape.”

Lost Sheep Fluorspar Project – Delta, Utah

  • 100% owned – 5,982 acres – 353 Claims

  • Located in the Spor Mountain area, Juab County, Utah,approximately 214 km south-west of Salt Lake City.

  • Fully Permitted – including mining permits.

  • NI 43-101 Technical Report identified extensivehigh-grade fluorspar with low levels of impurities.

  • Mining plan approved by BLM 1

First approved by Rex Rowley – Area Manager, Bureauof Land Management – 24th August 1992.

Renewed by Paul B. Baker – Minerals ProgramManager, Bureau of Land Management – 12th December 2016.

ON BEHALF OF THE BOARD OF DIRECTORS OF

ARES STRATEGIC MINING INC.

James Walker
Chief Executive Officer and President

For further information, please contact James Walker byphone at 604-345-1576 or by email at jwalker@aresmining.com

DISCLOSURE AND FORWARD-LOOKINGSTATEMENTS:

Companies typically rely oncomprehensive feasibility reports on mineral reserve estimates toreduce the risks and uncertainties associated with a productiondecision. Historically, situations where the issuer decides to put amineral project into production without first establishing mineralreserves supported by a technical report and completing a feasibilitystudy have a higher risk of economic or technical failure, though someindustrial mineral ventures are relatively simple operations with lowlevels of investment and risk, where the operating entity hasdetermined that a formal prefeasibility or feasibility study inconformance with NI 43-101 and 43-101 CP is not required for aproduction decision. Based on historical engineering work, geologicalreports, historical production data and current engineering workcompleted or in the process by Ares, the Company intends to moveforward with the development of its Utah asset.

Certain information in this newsrelease may contain forward-looking statements that involvesubstantial known and unknown risks and uncertainties. Forward-lookingstatements are often identified by terms such as “will”,“may”, “should”, “anticipate”, “expects” and similarexpressions. All statements other than statements of historical factincluded in this news release are forward-looking statements thatinvolve risks and uncertainties. There can be no assurance that suchstatements will prove to be accurate and actual results and futureevents could differ materially from those anticipated in suchstatements. Important factors that could cause actual results todiffer materially from the Company’s expectations include thefailure to satisfy the conditions of the relevant securitiesexchange(s) and other risks detailed from time to time in the filings made bythe Company with securities regulations. The reader is cautioned thatassumptions used in the preparation of any forward-looking informationmay prove to be incorrect. Events or circumstances may cause actualresults to differ materially from those predicted, as a result ofnumerous known and unknown risks, uncertainties, and other factors,many of which are beyond the control of the Company. The reader iscautioned not to place undue reliance on any forward-lookinginformation. Such information, although considered reasonable bymanagement at the time of preparation, may prove to be incorrect andactual results may differ materially from those anticipated.Forward-looking statements contained in this news release areexpressly qualified by this cautionary statement. The forward-lookingstatements contained in this news release are made as of the date ofthis news release and the Company disclaims any intention orobligation to update or revise such information, except as required byapplicable law.

1

Copyright (c) 2022 TheNewswire - All rights reserved.

Stock Information

Company Name: Aureus Mining Inc
Stock Symbol: ARSMF
Market: OTC
Website: aresmining.com

Menu

ARSMF ARSMF Quote ARSMF Short ARSMF News ARSMF Articles ARSMF Message Board
Get ARSMF Alerts

News, Short Squeeze, Breakout and More Instantly...