Twitter

Link your Twitter Account to Market Wire News


When you linking your Twitter Account Market Wire News Trending Stocks news and your Portfolio Stocks News will automatically tweet from your Twitter account.


Be alerted of any news about your stocks and see what other stocks are trending.



home / news releases / ARSMF - Ares Strategic Mining Completes Purchase of 48-Acre Industrial Property


ARSMF - Ares Strategic Mining Completes Purchase of 48-Acre Industrial Property

(TheNewswire)

  • Property is already industrially zoned, allowing for manufacturingoperations.

  • Property possesses $2M of infrastructure and buildings, saving Aresconstruction costs and time.

  • Property contains its own water wells to supply the Ares processingoperation.

  • Direct access to highway, power, utilities, and gas

  • Property is several miles from Delta City, requiring no mining campfor employees.

Vancouver, B.C. - TheNewswire- April 18 th , 2023 — AresStrategic Mining Inc. (the “Company”) (CSE:ARS) (OTC:ARSMF)(FRA:N8I1), is pleased to announce that it has fully completed thepurchased, and received title, of a 48-acre, industrially zonedmanufacturing site for its upcoming fluorspar processing operation(the “Property”). The Property is located in Delta, Utah, theclosest city to the Company’s Spor Mountain fluorspar project(“Spor Mountain”).

The Property is already fitted with utilities, andpossesses its own water wells, reducing reliance on local waternetworks. The facilities will be able to locate both Ares’ lumps andflotation plants and house a large tailings facility for the comingproduction. The Property is connected to Ares’ Lost Sheep projectvia large, paved highways, requiring no infrastructure upgradesoutside of the facility so the Company can receive material.

The Company has already delivered its lumps plants andthe associated structural steel to its new industrial site and haslocated a firm able to perform the plant assembly. With the newlyacquired land, the Company will now be able to construct a tailingsdam, allowing also for storage of waste aggregate well suited forselling to local businesses and construction projects.

New Ares Workshop

James Walker, President and CEO of the Company said,“Purchasing the processing site is a major advance towards ourproduction goals. Locating the most suitable site required balancingthe site’s size, location, facilities, accessibility, suitability,and cost – the Company believes it has located the best and mostbalanced industrial facility and land available. The new acquisitionmeans no second site is needed for the second processing facility, andstaff can be more efficiently managed between operations. Ares willhave a good workforce to draw from, accessible water, good access fortrucks, and will be located near its newly installed rail sur forshipment of its products throughout the U.S.”

In 2018 the U.S. government classified fluorspar as aCritical Mineral, “deemed critical to U.S. national security and theeconomy”. Fluorspar remains the only non-metallic Critical Mineralwhich is 100% imported in the entire country. Fluorspar’sclassification as a Critical Mineral in the United States translatesto a faster permitting period, enabling mining operations to initiatemore quickly than operations for conventional minerals.

New Facility and WarehouseInstallation

Lost Sheep Fluorspar Project – Delta, Utah

  • 100% owned – 5,982 acres – 353 Claims

  • Located in the Spor Mountain area, Juab County, Utah,approximately 214 km south-west of Salt Lake City.

  • Fully Permitted – including mining permits.

  • NI 43-101 Technical Report identified extensivehigh-grade fluorspar with low levels of impurities.

  • Mining plan approved by BLM 1

First approved by Rex Rowley – Area Manager, Bureauof Land Management – 24th August 1992.

Renewed by Mike Gates – Minerals Program Manager,Bureau of Land Management – 12th December 2016.

ON BEHALF OF THE BOARD OF DIRECTORS OF

ARES STRATEGIC MINING INC.

James Walker
Chief Executive Officer and President

For further information, please contact James Walker byemail at jwalker@aresmining.com

DISCLOSURE AND FORWARD-LOOKINGSTATEMENTS:

Companies typically rely oncomprehensive feasibility reports on mineral reserve estimates toreduce the risks and uncertainties associated with a productiondecision. Historically, situations where the issuer decides to put amineral project into production without first establishing mineralreserves supported by a technical report and completing a feasibilitystudy have a higher risk of economic or technical failure, though someindustrial mineral ventures are relatively simple operations with lowlevels of investment and risk, where the operating entity hasdetermined that a formal prefeasibility or feasibility study inconformance with NI 43-101 and 43-101 CP is not required for aproduction decision. Based on historical engineering work, geologicalreports, historical production data and current engineering workcompleted or in the process by Ares, the Company intends to moveforward with the development of its Utah asset.

Certain information in this newsrelease may contain forward-looking statements that involvesubstantial known and unknown risks and uncertainties. Forward-lookingstatements are often identified by terms such as “will”,“may”, “should”, “anticipate”, “expects” and similarexpressions. All statements other than statements of historical factincluded in this news release are forward-looking statements thatinvolve risks and uncertainties. There can be no assurance that suchstatements will prove to be accurate and actual results and futureevents could differ materially from those anticipated in suchstatements. Important factors that could cause actual results todiffer materially from the Company’s expectations include thefailure to satisfy the conditions of the relevant securitiesexchange(s) and other risks detailed from time to time in the filingsmade by the Company with securities regulations. The reader iscautioned that assumptions used in the preparation of anyforward-looking information may prove to be incorrect. Events orcircumstances may cause actual results to differ materially from thosepredicted, as a result of numerous known and unknown risks,uncertainties, and other factors, many of which are beyond the controlof the Company. The reader is cautioned not to place undue reliance onany forward-looking information. Such information, although consideredreasonable by management at the time of preparation, may prove to beincorrect and actual results may differ materially from thoseanticipated. Forward-looking statements contained in this news releaseare expressly qualified by this cautionary statement. Theforward-looking statements contained in this news release are made asof the date of this news release and the Company disclaims anyintention or obligation to update or revise such information, exceptas required by applicable law.

1

Copyright (c) 2023 TheNewswire - All rights reserved.

Stock Information

Company Name: Aureus Mining Inc
Stock Symbol: ARSMF
Market: OTC
Website: aresmining.com

Menu

ARSMF ARSMF Quote ARSMF Short ARSMF News ARSMF Articles ARSMF Message Board
Get ARSMF Alerts

News, Short Squeeze, Breakout and More Instantly...