MMSDF - Assays completed for infill drilling of the Lake Giles Iron Project

VANCOUVER, British Columbia, May 05, 2020 (GLOBE NEWSWIRE) -- Macarthur Minerals Limited (TSX-V: MMS) (ASX: MIO) (the “Company” or “Macarthur”) has recently received the final XRF and Davis Tube Recovery (DTR) assays for the infill drilling program completed at its Lake Giles Iron Project near Kalgoorlie in Western Australia. The DTR assays confirm significant intersections of magnetite mineralisation with DTR concentrate grades up to 68.9% Fe.

Drilling at the Moonshine North deposit comprised 21 reverse circulation (RC) holes for 3379 metres and 9 diamond drill (DD) holes for 1676.2 metres, totalling 5055.2m.  A total of 25 holes were submitted for XRF and DTR analysis.

Macarthur has now engaged CSA Global to complete an updated resource model and classification.

Highlights

  • Weighted average DTR concentrate grade of 66.6% Fe and weighted average mass recovery of 31.2%.
  • High grade DTR concentrate including the following intervals:
Hole
mFrom
mTo
DTR Mass
Recovery %
Fe Concentrate
%
LGRC_2165
52
110
39.9
68.88
LGRC_2160
96
179
41.3
68.78
LGRC_2147
139
199
42.4
67.17
Including
139
167
45.2
66.63
LGRC_2166
114
149
51.6
68.61
  • High grade magnetite intervals:
Hole
mFrom
mTo
Fe%
SiO2%
LGRC_2160
131
168
50.28
12.64
Including
139
155
55.44
8.03
and
141
145
61.00
6.28
LGRC_2166
115
149
50.07
15.67
Including
127
150
55.45
9.49
and
129
148
60.03
7.02

Macarthur Minerals Executive Chairman Mr Cameron McCall said that “The assay results for the infill drilling confirmed good intersections of magnetite.  This has been a successful program, and these intersections will form the basis of a revised mineral resource estimate that will underpin the Feasibility Study.” 

Mr McCall also said that “Macarthur has been working hard on progressing key components of the Lake Giles Iron Project, and is well underway in advancing discussions to achieve a contracted position with port and rail service providers.

We look forward to informing investors about the outcomes of the updated resource classification that is anticipated to include Indicated and Measured Mineral Resources, and to further advising on progress on the Company’s march toward securing its route to market” Mr McCall said.

Drilling Results

The Moonshine magnetite deposit is currently defined by drill hole spacings of 200m x 200m and classified as an Inferred Mineral Resource of approximately 710 mt at 30.2% Fe1.  The Company’s infill drilling program targeted two discrete areas of the Moonshine and Moonshine North magnetite deposits as shown in Figure 1. Drilling was conducted at closer spacing to provide greater confidence in resource estimates with a plan to upgrade the resource classification to include Indicated and Measured Resources.

Ore grade XRF assays were previously released to the market on December 10, 2019 and January 17, 2020.  Samples were subsequently submitted for DTR analysis to determine the magnetite fraction and concentrate grade.

DTR analysis has been completed for 25 holes intersecting magnetite mineralisation at the Moonshine and Moonshine North deposits. DTR assays were completed for sample composites ranging from 3m to 5m intervals based on head grade XRF assays and geological logging.

Average concentrate grades across holes ranged from 63.7% Fe to 68.9% Fe with mass recoveries ranging from 15.5% to 51.6% (Table 1).  Weighted average ore grades across mineralised intervals approximated 30.4% Fe with weighted average DTR concentrate of 66.6% Fe with a mass recovery of 31.2%.  These data are in accordance with the mineral resource estimate at 30.2% Fe and 31.4% mass recovery1.

Several holes showed elevated mass recoveries including:

  • LGRC_2166:  52 to 110m; DTR 39.9% and 68.9% Fe
  • LGRC_2160:  96 to 179m; DTR 41.3% and 68.8% Fe
  • LGRC_2147:  139 to 199m; DTR 42.4% and 67.2% Fe
  • LGRC_2166:  114 to 149m; DTR 51.6% and 68.6% Fe

The following table details significant intervals of magnetite mineralisation confirmed by XRF and DTR analysis (Table 1). Note these intersections are not true widths. For completeness, the drill hole locations for all holes drilled in the infill program are presented in Table 2. Significant magnetite intervals and drill hole locations throughout the Moonshine deposit are shown in Figure 1.

Table 1. XRF and DTR assay results for DD and RC drill samples from the Moonshine and Moonshine North deposits.

Hole ID
m From
m To
Interval
Fe%
SiO2%
P%
S%
Al2O3%
LOI
Average
DTR
mass
recovery
%
DTR
  Conc.
Fe %
LGDD_066
60
175
115
25.95
54.85
0.04
1.05
1.04
2.05
26.46
64.75
LGDD_067
69
137
68
31.61
48.99
0.05
0.42
0.84
0.06
38.41
67.97
LGDD_068
83
194
111
26.82
55.15
0.04
0.42
0.23
1.12
29.67
66.46
LGDD_069
64
115
51
31.96
47.89
0.05
1.16
0.58
2.00
29.31
66.35
GDD_070
88
174
86
27.64
56.00
0.05
0.54
0.17
1.99
30.91
66.71
LGDD_071
82
162
80
30.74
47.11
0.05
1.64
1.82
1.80
33.56
66.43
LGDD_072
56
130
74
28.19
53.12
0.04
0.41
0.18
0.59
32.65
67.42
LGDD_073
105
142
37
28.74
52.86
0.06
0.32
0.66
0.55
21.40
64.12
LGDD_073
199
269
70
30.12
46.02
0.05
2.00
1.74
0.63
35.35
64.90
LGDD_074
46
100
54
32.36
50.46
0.05
0.27
0.21
0.82
31.94
67.62
LGRC_2146
58
106
48
25.43
58.15
0.04
0.20
0.12
1.60
19.77
67.07
LGRC_2147
100
245
145
27.29
50.49
0.07
1.13
2.81
0.77
30.22
65.85
LGRC_2148
75
101
26
26.08
53.08
0.07
0.13
2.96
1.66
24.50
67.51
LGRC_2149
102
106
4
17.30
67.25
0.03
0.11
0.05
4.35
15.50
64.40
LGRC_2150
53
84
31
26.05
58.02
0.04
0.14
0.10
1.95
22.33
64.29
LGRC_2151
105
186
81
31.25
50.92
0.04
1.16
0.94
0.71
37.75
67.00
LGRC_2154
113
161
48
21.52
58.90
0.04
1.78
1.11
2.46
19.46
63.70
LGRC_2155
55
80
25
31.20
51.99
0.05
0.15
0.31
2.18
17.58
67.46
LGRC_2156
85
97
12
18.69
64.32
0.03
0.25
0.09
2.57
18.47
65.52
LGRC_2159
200
285
85
33.96
30.93
0.06
3.27
2.85
5.70
27.66
66.94
LGRC_2160
96
179
83
42.01
18.46
0.08
1.85
2.60
7.15
41.30
68.78
LGRC_2161
117
223
106
31.70
41.33
0.05
1.66
2.44
2.68
32.68
66.76
LGRC_2163
86
103
17
31.32
32.00
0.07
0.17
3.97
6.54
25.61
68.21
LGRC_2165
52
110
58
37.68
37.58
0.06
1.00
0.39
3.56
39.85
68.88
LGRC_2166
114
149
35
49.02
16.12
0.09
3.34
2.89
3.51
51.55
68.61

Table 2. Drill hole locations for the Moonshine Magnetite infill drilling program. 
Highlighted holes relate to assay data presented herein.

Hole_ID
Hole
Type
Prospect
Max
Depth
NAT_RL
NAT_Grid
NAT_East
NAT_North
DIP
AZIMUTH
LGDD_066
DD
MOONSHINE
228.4
502.842
MGA94_50
790222.9
6672154.3
-60.37
244.97
LGDD_067
DD
MOONSHINE
138
499.512
MGA94_50
790050.1
6672396.3
-60.78
242.59
LGDD_068
DD
MOONSHINE
222
501.624
MGA94_50
790289.5
6672079.6
-59.64
236.29
LGDD_069
DD
MOONSHINE
145
501.338
MGA94_50
790492.9
6671732.0
-60.49
241.84
LGDD_070
DD
MOONSHINE
215.1
507.458
MGA94_50
790351.7
6671884.0
-60.5
240.94
LGDD_071
DD
MOONSHINE NORTH
223.4
480.941
MGA94_50
787935.2
6674890.6
-61.72
248.38
LGDD_072
DD
MOONSHINE
133.2
490.221
MGA94_50
789865.0
6672633.7
-60.03
246.21
LGDD_073
DD
MOONSHINE
270.8
498.521
MGA94_50
789956.5
6672801.8
-60.66
241.84
LGDD_074
DD
MOONSHINE NORTH
100.3
488.778
MGA94_50
787735.6
6675226.8
-60.66
255.25
LGRC_2146
RC
MOONSHINE
150
497.672
MGA94_50
790002.0
6672371.0
-59.64
241.61
LGRC_2147
RC
MOONSHINE
282
498.468
MGA94_50
790155.1
6672346.7
-59.64
241.18
LGRC_2148
RC
MOONSHINE
108
498.484
MGA94_50
790087.2
6672300.1
-60.13
240.53
LGRC_2149
RC
MOONSHINE
126
506.135
MGA94_50
790221.0
6672028.6
-60.14
230.83
LGRC_2150
RC
MOONSHINE
132
500.564
MGA94_50
790164.6
6672132.9
-60.33
227.21
LGRC_2151
RC
MOONSHINE
186
508.888
MGA94_50
790398.5
6671905.3
-60.61
245.79
LGRC_2152
RC
MOONSHINE
39
508.93
MGA94_50
790347.6
6671769.4
-59.96
247.61
LGRC_2153
RC
MOONSHINE
132
509.043
MGA94_50
790342.4
6671767.2
-59.96
247.61
LGRC_2154
RC
MOONSHINE
234
508.398
MGA94_50
790549.0
6671763.6
-59.82
238.13
LGRC_2155
RC
MOONSHINE
114
498.103
MGA94_50
790428.4
6671707.7
-60.5
221.8
LGRC_2156
RC
MOOSHINE
151
500.828
MGA94_50
789918.7
6672458.8
-60.2
213.48
LGRC_2157
RC
MOONSHINE
138
498.558
MGA94_50
789788.2
6672579.1
-60.24
237.28
LGRC_2158
RC
MOONSHINE
120
493.389
MGA94_50
789719.1
6672674.8
-60.16
259.02
LGRC_2159
RC
MOONSHINE NORTH
294
502.948
MGA94_50
787889.7
6675197.1
-60.36
234.16
LGRC_2160
RC
MOONSHINE NORTH
294
486.933
MGA94_50
787908.1
6674997.0
-60.28
222
LGRC_2161
RC
MOONSHINE NORTH
261
486.27
MGA94_50
787904.6
6674993.7
-77.35
229.3
LGRC_2162
RC
MOONSHINE NORTH
100
483.151
MGA94_50
787760.8
6675122.9
-60.51
240.45
LGRC_2163
RC
MOONSHINE NORTH
114
488.285
MGA94_50
787807.9
6675038.1
-60.59
244.4
LGRC_2164
RC
MOONSHINE NORTH
114
486.831
MGA94_50
787852.4
6674946.7
-59.52
239.31
LGRC_2165
RC
MOONSHINE NORTH
130
486.6
MGA94_50
787888.9
6674854.7
-60.23
244.79
LGRC_2166
RC
MOONSHINE NORTH
160
475.268
MGA94_50
788022.4
6674690.6
-60.61
245.02

A photo accompanying this announcement is available at https://www.globenewswire.com/NewsRoom/AttachmentNg/725c1ba7-0b99-4582-953e-b2b291f32124

On behalf of the Board of Directors, Mr Cameron McCall, Executive Chairman

For more information please contact:

Joe Phillips                                                                            
CEO & Director                                                                    
M +61 (0)448 899 247                                                      
jphillips@macarthurminerals.com                   

Qualified Person

Mr Andrew Hawker, BSc. Geol, MAusIMM and MAIG, a member of the Australian Institute of Geoscientists is a full-time employee of Hawker Geological Services Pty Ltd and a Qualified Person as defined in National Instrument 43-101. Mr Hawker has reviewed and approved the technical information contained in this news release.

Company profile

Macarthur is an iron ore development, gold and lithium exploration company that is focused on bringing to production its Western Australia iron ore projects. The Lake Giles Iron Project mineral resources include the Ularring hematite resource (approved for development) comprising Indicated resources of 54.5 million tonnes at 47.2% Fe and Inferred resources of 26 million tonnes at 45.4% Fe; and the Moonshine magnetite resource of 710 million tonnes (Inferred). Macarthur has prominent (~1,281 square kilometer tenement area) gold, lithium and copper exploration interests in Pilbara region of Western Australia. In addition, Macarthur has lithium brine Claims in the emerging Railroad Valley region in Nevada, USA.

This news release is not for distribution to united states services or for dissemination in the United States

Caution Regarding Forward Looking Statements

Certain of the statements made and information contained in this press release may constitute forward-looking information and forward-looking statements (collectively, “forward-looking statements”) within the meaning of applicable securities laws.  All statements herein, other than statements of historical fact, that address activities, events or developments that the Company believes, expects or anticipates will or may occur in the future, including but limited to statements regarding: the proposed strategy regarding core mining, road and rail inputs at the Project; anticipated increases in annual production at the Project; anticipated decreases in Project costs; the possible reclassification of current inferred mineral resources on the Project as indicated mineral resources in the future; expected completion of the FS on the Project containing a new reserve calculation and a new economic assessment; the granting of a license for the Menzies rail siding; the status of the MRRT; and plans to secure mining approvals under the Mining Act, are forward-looking statements.  The forward-looking statements in this press release reflect the current expectations, assumptions or beliefs of the Company based upon information currently available to the Company. With respect to forward-looking statements contained in this press release, assumptions have been made regarding, among other things, the reliability of information prepared and/or published by third parties that are referenced in this press release or was otherwise relied upon by the Company in preparing this press release. Although the Company believes the expectations expressed in such forward-looking statements are based on reasonable assumptions, such statements are not guarantees of future performance and no assurance can be given that these expectations will prove to be correct as actual results or developments may differ materially from those projected in the forward-looking statements.  Factors that could cause actual results to differ materially from those in forward-looking statements include but are not limited to:  unforeseen technology changes that results in a reduction in iron or magnetite demand or substitution by other metals or materials; the discovery of new large low cost deposits of iron magnetite; the general level of global economic activity; future changes in strategy regarding core mining, road and rail inputs with respect to the Project; final Project costs varying from those determined from the EOI program; failure to successfully negotiate a BOO arrangement for the Project; failure to complete the FS; failure of the FS to reflect currently anticipated increases annual production and decreases in expected costs at the Project; the results of infill drilling being insufficient to reclassify current inferred mineral resources on the Project as indicated mineral resources; failure to receive a license for the Menzies rail siding; failure to repeal the MRRT; and failure to obtain mining approvals under the Mining Act.  Readers are cautioned not to place undue reliance on forward-looking statements due to the inherent uncertainty thereof. Such statements relate to future events and expectations and, as such, involve known and unknown risks and uncertainties. The forward-looking statements contained in this press release are made as of the date of this press release and except as may otherwise be required pursuant to applicable laws, the Company does not assume any obligation to update or revise these forward-looking statements, whether as a result of new information, future events or otherwise.

______________________________

1 NI43-101 Technical Report filed June 17, 2019, titled “Macarthur Minerals Limited, Preliminary Economic Assessment Lake Giles Iron Project, Western Australia”, NI43-101 Technical Report – Preliminary Assessment 

Figure 1

Drill hole locations for the Moonshine Magnetite infill drilling program showing significant magnetite intervals for the last seven holes drilled.
Stock Information

Company Name: Macarthur Minerals Ltd
Stock Symbol: MMSDF
Market: OTC
Website: macarthurminerals.com

Menu

MMSDF MMSDF Quote MMSDF Short MMSDF News MMSDF Articles MMSDF Message Board
Get MMSDF Alerts

News, Short Squeeze, Breakout and More Instantly...