Twitter

Link your Twitter Account to Market Wire News


When you linking your Twitter Account Market Wire News Trending Stocks news and your Portfolio Stocks News will automatically tweet from your Twitter account.


Be alerted of any news about your stocks and see what other stocks are trending.



home / news releases / BTR:CC - Bonterra Intersects 79.9 g/t Au over 2.1 m; Including 333.0 g/t over 0.5 m at the Barry Underground Project and Provides Corporate Updates


BTR:CC - Bonterra Intersects 79.9 g/t Au over 2.1 m; Including 333.0 g/t over 0.5 m at the Barry Underground Project and Provides Corporate Updates

Val-d'Or, Quebec--(Newsfile Corp. - November 15, 2022) - Bonterra Resources Inc. (TSXV: BTR) (OTCQX: BONXF) (FSE: 9BR2) ("Bonterra" or the "Company") is pleased to announce the first results from the ongoing infill drilling campaign at the Barry underground project as well as the latest results of the open pit project, which are expected to be used for the grade interpolation of the mineralization at depth. The Company commenced a 125,000 metres ("m") drill program at the Barry underground deposit last August, which contains 0.5 million ounces of Measured and Indicated Mineral resources and 0.7 million ounces of Inferred Mineral resources, as stated in the last mineral resource estimate (the "2021 MRE", see press release dated June 23, 2021). To date, 15,900 m (33 holes) of infill drilling has been completed from the surface, mainly in the upper half of the Barry underground deposit.

Highlights include:

  • 79.9 g/t Au over 2.1 m, including 333.0 g/t Au over 0.5 m in hole MB-22-529A
  • 12.8 g/t Au over 7.9 m, including 29.1 g/t Au over 2.8 m in hole MB-22-433
  • 10.7 g/t Au over 5.7 m, including 96.5 g/t Au over 0.5 m and 8.7 g/t Au over 0.5 m in hole
    MB-22-509A
  • 10.2 g/t Au over 4.0 m, including 13.9 g/t Au over 1.1 m and 48.6 g/t Au over 0.5 m in hole MB-22-430
  • 12.9 g/t Au over 3.3 m, including 31.3 g/t Au over 1.1 m in hole MB-22-539A

Marc André Pelletier, President and CEO, commented: "We are pleased with the recent results of the ongoing infill drilling campaign for the underground deposit at Barry. MB-22-529A drill hole results of 333.0 g/t over 0.5 m represents the highest reported interception ever at the Barry project. This campaign fits well with our strategy of moving the Barry asset toward a production re-start. Considering the magnitude of the underground mineral resources, the deposit has the potential to become a long-lived operation and the Company intends to further define its potential. Drilling at Barry will continue with two drill rigs on site. Also, the pre-feasibility study ("PFS") on the Barry open pit project is at an important juncture and an update is expected before year end."

Diamond Drilling Results Highlights:


 
Figure 1 - Barry Project -Surface Plan, holes and highlight's location
 
To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/1528/144192_a1af5409347dcb3a_001full.jpg
 


 
Figure 2 - Barry Project - Zoomed-in Surface Plan, holes and highlight's location
 
To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/1528/144192_a1af5409347dcb3a_002full.jpg

The Barry open pit drill program was designed to fill gaps in the drill spacing in and immediately around the pit shell from the 2021 MRE. Some holes have been extended below the pit scope to target high potential underground mineralization zones and will be used for the grade interpolation of the mineralization at depth. The results obtained from the in the pit mineralization depth range confirmed the strong southeast extension potential yielded by the H6 zone. Highlights include, from 25 to 40 m vertical depth, 10.7 g/t Au over 5.7 m including 96.5 g/t Au over 0.5 m and 8.7 g/t Au over 0.5 m in hole MB-22-509A, 1.5 g/t Au over 8.8 m in hole MB-22-518 and 5.4 g/t Au over 2.8 m including 23.7 g/t Au over 0.6 m in hole MB-22-516 (figure 3).


 
Figure 3 - Barry Project - Long section 35m, H6 zone results, Looking Northwest
 
To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/1528/144192_a1af5409347dcb3a_003full.jpg

The definition drilling program of the Barry underground project is designed to convert inferred resources from the 2021 MRE in indicated resources by decreasing the drill spacing to 25 m. The program especially aims to delineate and expand high grades mineralization shoots identified in the 2021 MRE. The results from the H1 zone, 200m below the surface, demonstrated the continuity of these mineralized shoots over more than 150 m. Best results includes : 12.8 g/t Au over 7.9 m including 29.1 g/t Au over 2.8 m in hole MB-22-433, 10.2 g/t Au over 4,0 m including 13.9 g/t Au over 1.1 m and 48.6 g/t Au over 0.5 m in hole MB-22-430 and 12.9 g/t Au over 3.3 m including 31.3 g/t Au over 1.1 m in hole MB-22-539A (figure 4).


 
Figure 4 - Barry Project - Longitudinal Section 35m, H1 Zone, looking northwest
 
To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/1528/144192_a1af5409347dcb3a_004full.jpg

As winter conditions allow access to drill sites, the upcoming infill program will be focused on the prolific sub-vertical 800 Zone and its surrounding H-series zones. Preliminary results from accessible drill site returned good results in accordance with 2021 MRE block model prediction. Highlights include 2.5 g/t Au over 13.8 m including 5.3 g/t Au over 2.9 m in hole MB-22-534, and 9.5 g/t Au over 2.1 m in hole MB-22-529A. In addition to these results the highest drill hole sample ever reported at the Barry project has returned 333.0 g/t Au over 0.5 m included in a mineralized interval of 79.9 g/t Au over 2.1 m in hole MB-22-529A from a newly interpreted H series zone nearby the 800 zone (figure 5).


 
Figure 5 - Barry Project - Cross Section 25m, Hole MB-22-528A, MB-22-529A, MB-22-534, looking southwest
 
To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/1528/144192_a1af5409347dcb3a_005full.jpg

Barry Deposit Geology

The Barry gold deposit is characterized by three dominant sets of structures, all dipping to the southeast. The sub-vertical shear zones and the H-Series shear zones dipping 25 to 40 degrees are hosted within intermediate to mafic volcanics and tuffs with local felsic intrusions. Contact zones dip at 50-65 degrees along the lower and upper contacts of the D1, D2 and D3 felsic intrusions with mafic volcanics. Gold mineralization is associated with disseminated sulfides within shear zones and veins with local visible gold. The Barry deposit has been delineated over 1.4 kilometre along strike and 700 m vertical and remains open for expansion.

Corporate Updates

The Company is also pleased to announce that it has retained PI Financial Corp. ("PI") to provide marketing services in accordance with TSX Venture Exchange ("TSX") policies. PI will trade the securities of Bonterra on the TSX for the purposes of maintaining an orderly market. In consideration of the services provided by PI, the Company will pay PI a monthly cash fee of $5,000 for a minimum term of three months and renewable thereafter. Bonterra and PI are unrelated and unaffiliated entities. PI will not receive shares or options as compensation. The capital used for market making will be provided by PI.

In addition, the Company also announces that at the annual and special meeting of its shareholders held on June 22, 2022 (the "Meeting"), the shareholders approved the adoption of Bonterra's new omnibus equity incentive plan (the "Omnibus Plan") and reserved common shares of Bonterra ("Common Shares") for issuance under the Omnibus Plan. The Omnibus Plan allows the Company to issue stock options, restricted share units, performance share units and deferred share units (the "Awards"). The Omnibus Plan is a "rolling up to 10% plan" (as that term is used by the TSX) and replaces the Company's previous rolling 10% stock option plan. The maximum aggregate number of Common Shares that may be reserved for issuance under the Omnibus Plan at any point in time is 10% of the outstanding Common Shares in the capital of the Company at the time of the grant of an Award and the Common Shares reserved and currently available for issuance under the Omnibus Plan is 12,619,550 Common Shares (such number being equal to approximately 10% of the issued and outstanding Common Shares). On November 24, 2021, the TSX adopted a new policy governing security-based compensation (the "New Policy 4.4"). In accordance with the New Policy 4.4, the Company has adopted a number of these amendments in the Omnibus Plan. These changes include allowing option holders to exercise options on a "cashless exercise" or "net exercise" basis, as now expressly permitted by the
New Policy 4.4. "Cashless exercise" is a method of exercising stock options in which a securities dealer loans funds to the option holder or sells the same shares as those underlying the option, prior to or in conjunction with the exercise of options, to allow the option holder to fund the exercise of some or all of their options. "Net exercise" is a method of option exercise under which the option holder does not make any payment to the issuer for the exercise of their options and receives on exercise a number of shares equal to the intrinsic value (current market price less the exercise price) of the option valued at the current market price. Under the New Policy 4.4, the current market price must be the 5-day volume weighted average trading price prior to option exercise. "Net exercise" may not be utilized by persons performing investor relations services. The Omnibus Plan, is further described in the Company's information circular, a copy of which can be found on the Company's SEDAR profile at www.sedar.com.

Diamond drill hole results table:

The following table shows the significant intersections of the drill holes presented in this press release.

Program
Hole ID

From
(m)
To
(m)
Length
(m)
Grade
(g/t Au)
Metal Factor (length * grade)
Zone
Pit Extension NE /Underground
MB-21-407

275.5
276.5
1.0
6.4
6.4
New H
Pit Extension NE /Underground
MB-22-421

236.1
238.5
2.4
8.1
19.4
H18
Pit Extension NE /Underground
MB-22-421
Including
237.0
238.0
1.0
18.2
18.2
H18
Pit Extension NE /Underground
MB-22-423

467.5
474.5
7.0
0.9
6.6
H12
Depth Extension
MB-22-429

657.9
665.4
7.5
1.1
8.1
New Vertical
Depth Extension
MB-22-429
Including
657.9
658.6
0.7
7.2
5.0
New Vertical
Depth Extension
MB-22-429

786.5
789.6
3.1
3.3
10.1
H12
Depth Extension
MB-22-429
Including
788.6
789.6
1.0
9.8
9.8
H12
Depth Extension
MB-22-429

801.6
807.6
6.0
1.3
8.0
H12
Depth Extension
MB-22-429
Including
803.6
806.1
2.5
2.8
7.0
H12
Pit Infill / Underground
MB-22-430

271.9
275.9
4.0
10.2
40.7
H1
Pit Infill / Underground
MB-22-430
Including
272.9
274.0
1.1
13.9
15.3
H1
Pit Infill / Underground
MB-22-430
and Including
275.4
275.9
0.5
48.6
24.3
H1
Pit Infill
MB-22-431

91.0
93.9
2.9
4.4
12.9
H8
Pit Infill
MB-22-431
and Including
92.1
93.3
1.2
6.0
7.2
H8
Pit Infill / Underground
MB-22-433

274.7
282.6
7.9
12.8
101.5
H1
Pit Infill / Underground
MB-22-433
Including
276.5
279.3
2.8
29.1
81.6
H1
Pit Infill / Underground
MB-22-435

290.2
297.2
7.0
1.0
6.8
H1
Pit Infill / Underground
MB-22-435
Including
292.8
295.4
2.6
2.1
5.5
H1
Pit Infill
MB-22-438

180.3
182.7
2.4
5.8
14.0
H8
Pit Infill
MB-22-438
Including
181.2
181.7
0.5
15.8
7.9
H8
Pit Infill / Underground
MB-22-444

281.5
289.4
7.9
2.1
16.4
H1
Pit Infill / Underground
MB-22-444
Including
284.5
286.4
1.9
6.6
12.5
H1
Pit Infill / Underground
MB-22-447

212.7
214.4
1.7
3.8
6.4
1000
Pit Infill / Underground
MB-22-447
Including
212.7
213.9
1.2
5.2
6.2
1000
Pit Infill / Underground
MB-22-447

274.3
277.9
3.6
4.7
16.9
New H
Pit Infill / Underground
MB-22-447
Including
276.9
277.9
1.0
15.5
15.5
New H
Pit Infill / Underground
MB-22-449

270.7
278.5
7.8
2.1
16.3
H1
Pit Infill / Underground
MB-22-449
Including
274.8
276.3
1.5
8.8
13.1
H1
Pit Infill / Underground
MB-22-453

221.6
227.3
5.7
2.8
16.1
New H
Pit Infill / Underground
MB-22-453
Including
221.6
223.1
1.5
7.0
10.5
New H
Pit Infill / Underground
MB-22-455

387.9
389.4
1.5
3.6
5.4
1000
Pit Infill
MB-22-458

116.6
118.8
2.2
3.3
7.4
H8
Pit Infill
MB-22-466

29.0
31.0
2.0
3.1
6.2
D5
Pit Infill
MB-22-466

127.8
129.0
1.2
21.2
25.4
1001
Pit Infill
MB-22-466
Including
127.8
128.3
0.5
40.9
20.5
1001
Pit Infill
MB-22-469

147.0
148.0
1.0
7.7
7.7
1004
Pit Infill / Underground
MB-22-472

280.5
294.7
14.2
1.7
23.8
H1
Pit Infill / Underground
MB-22-472
Including
287.0
288.0
1.0
18.4
18.4
H1
Pit Infill
MB-22-475

90.1
92.7
2.6
2.1
5.6
H23
Pit Infill
MB-22-475
Including
92.2
92.7
0.5
10.2
5.1
H23
Pit Infill
MB-22-476

84.3
85.2
0.9
18.5
16.7
New Vertical
Pit Infill
MB-22-480

197.7
199.7
2.0
33.8
67.6
D2B
Pit Infill
MB-22-480
Including
198.2
198.7
0.5
127.5
63.8
D2B
Pit Infill / Underground
MB-22-485

231.5
236.8
5.3
1.6
8.5
New H
Pit Infill / Underground
MB-22-485
Including
232.5
233.1
0.6
10.5
6.3
New H
Pit Infill / Underground
MB-22-485

272.5
274.2
1.7
13.6
23.1
H1
Pit Infill / Underground
MB-22-485
Including
273.2
273.7
0.5
42.2
21.1
H1
Pit Infill
MB-22-492

145.9
151.2
5.3
1.1
5.8
H8
Pit Infill / Underground
MB-22-494

230.8
231.8
1.0
44.9
44.9
H1
Pit Infill / Underground
MB-22-494
Including
230.8
231.3
0.5
89.6
44.8
H1
Pit Infill
MB-22-495

152.0
157.0
5.0
1.0
5.2
D2
Pit Infill
MB-22-495

163.0
166.4
3.4
4.1
14.0
D2
Pit Infill
MB-22-495
Including
164.0
165.7
1.7
8.1
13.8
D2
Pit Infill / Underground
MB-22-495

225.4
228.3
2.9
2.0
5.7
New H
Pit Infill
MB-22-497

60.7
61.3
0.6
42.6
25.6
1003
Pit Infill
MB-22-498

36.8
37.8
1.0
5.5
5.5
D2
Pit Infill
MB-22-498

45.8
47.6
1.8
4.1
7.5
D2
Pit Infill
MB-22-500

106.2
106.7
0.5
13.8
6.9
D2
Barry Pit Sud-Ouest Ext
MB-22-509A

17.9
23.6
5.7
10.7
60.8
H6
Barry Pit Sud-Ouest Ext
MB-22-509A
Including
19.2
19.7
0.5
96.5
48.3
H6
Barry Pit Sud-Ouest Ext
MB-22-509A
and Including
22.0
22.5
0.5
8.7
4.4
H6
Pit Infill
MB-22-513

31.6
36.0
4.4
2.1
9.3
H6
Pit Infill
MB-22-513
Including
32.8
33.3
0.5
13.6
6.8
H6
Barry Pit Sud-Ouest Ext
MB-22-514

39.1
48.5
9.4
1.1
10.5
H6
Barry Pit Sud-Ouest Ext
MB-22-514
Including
40.3
41.1
0.8
8.4
6.7
H6
Barry Pit Sud-Ouest Ext
MB-22-515

40.9
46.5
5.6
0.9
5.3
H6
Pit Infill
MB-22-516

32.8
35.6
2.8
5.4
15.1
D2
Pit Infill
MB-22-516
Including
33.9
34.5
0.6
23.7
14.2
D3
Pit Infill
MB-22-516

46.3
50.0
3.7
3.2
11.8
D2
Pit Infill
MB-22-516
Including
46.9
47.4
0.5
18.5
9.3
D3
Barry Pit Sud-Ouest Ext
MB-22-517

99.6
106.0
6.4
1.3
8.0
H8
Barry Pit Sud-Ouest Ext
MB-22-517
Including
100.2
101.0
0.8
7.2
5.8
H8
Barry Pit Sud-Ouest Ext
MB-22-518

19.2
28.0
8.8
1.5
13.2
H6
Underground Infill
MB-22-524

121.6
126.9
5.3
2.5
13.0
D4
Underground Infill
MB-22-524
Including
122.2
124.1
1.9
6.1
11.5
D4
Underground Infill
MB-22-524

277.5
279.7
2.2
2.7
5.9
D2
Underground Infill
MB-22-525

469.6
470.4
0.8
11.7
9.4
H12
Underground Infill
MB-22-526A

172.2
194.4
22.2
1.3
27.9
D4
Underground Infill
MB-22-526A
Including
180.4
183.1
2.7
5.1
13.8
D4
Underground Infill
MB-22-526A

322.2
324.7
2.5
2.1
5.2
D4
Underground Infill
MB-22-526A

507.9
515.7
7.8
2.6
20.6
H12
Underground Infill
MB-22-526A
Including
508.4
510.9
2.5
7.3
18.3
H12
Underground Infill
MB-22-527A

289.3
297.4
8.1
2.2
17.9
H13
Underground Infill
MB-22-527A
Including
289.3
293.9
4.6
3.5
16.2
H13
Underground Infill
MB-22-527A

425.9
430.4
4.5
1.3
5.7
H3
Underground Infill
MB-22-527A

522.6
524.7
2.1
3.8
8.0
H12
Underground Infill
MB-22-528A

442.5
443.5
1.0
5.6
5.6
H3
Underground Infill
MB-22-528A
Including
443.0
443.5
0.5
10.8
5.4
H3
Underground Infill
MB-22-528A

530.4
535.4
5.0
2.4
12.1
H12
Underground Infill
MB-22-528A
Including
531.7
532.3
0.6
14.1
8.5
H12
Underground Infill
MB-22-529A

155.9
158.9
3.0
6.0
18.0
AB16
Underground Infill
MB-22-529A
Including
156.9
157.9
1.0
17.8
17.8
AB16
Underground Infill
MB-22-529A

196.3
198.6
2.3
4.9
11.4
AB23
Underground Infill
MB-22-529A

239.4
241.5
2.1
79.9
167.8
New H
Underground Infill
MB-22-529A
Including
239.4
239.9
0.5
333.0
166.5
New H
Underground Infill
MB-22-529A

267.8
269.9
2.1
9.5
20.0
800
Underground Infill
MB-22-529A

423.0
429.0
6.0
1.8
11.0
H3
Underground Infill
MB-22-529A
Including
424.5
426.0
1.5
5.1
7.6
H3
Underground Infill
MB-22-530A

339.9
346.5
6.6
3.6
23.9
H1
Underground Infill
MB-22-531

246.7
250.4
3.7
3.5
12.9
800
Underground Infill
MB-22-531
Including
248.9
249.9
1.0
10.3
10.3
800
Underground Infill
MB-22-531

484.0
487.8
3.8
3.1
12.0
H10
Underground Infill
MB-22-531
Including
485.5
487.1
1.6
6.8
10.9
H10
Underground Infill
MB-22-532

132.9
138.6
5.7
0.9
5.4
H26
Underground Infill
MB-22-532

152.0
164.0
12.0
1.6
19.5
D4
Underground Infill
MB-22-532
Including
155.6
156.2
0.6
10.2
6.1
D4
Underground Infill
MB-22-534

185.0
198.8
13.8
2.5
34.0
800
Underground Infill
MB-22-534
Including
185.0
187.9
2.9
5.3
15.5
800
Underground Infill
MB-22-534

395.4
398.7
3.3
4.3
14.1
H3
Underground Infill
MB-22-534
Including
396.1
396.9
0.8
13.8
11.0
H3
Underground Infill
MB-22-537

48.8
51.6
2.8
1.9
5.4
New H
Underground Infill
MB-22-537

111.0
112.8
1.8
2.9
5.3
AB16
Underground Infill
MB-22-537

165.0
168.5
3.5
2.5
8.7
AB23
Underground Infill
MB-22-537

200.2
202.3
2.1
4.8
10.2
800
Underground Infill
MB-22-537
Including
201.8
202.3
0.5
11.4
5.7
800
Underground Infill
MB-22-537

480.2
481.2
1.0
6.0
6.0
H12
Underground Infill
MB-22-538

197.5
198.5
1.0
15.5
15.5
H17
Underground Infill
MB-22-538

202.5
204.1
1.6
6.8
10.9
H6
Underground Infill
MB-22-538

208.9
209.5
0.6
11.5
6.9
H6
Underground Infill
MB-22-539A

70.0
72.3
2.3
2.5
5.7
AB15
Underground Infill
MB-22-539A

147.7
148.2
0.5
14.1
7.1
AB05
Underground Infill
MB-22-539A

278.2
281.5
3.3
12.9
42.5
H1
Underground Infill
MB-22-539A
Including
279.4
280.5
1.1
31.3
34.4
H1

 

Notes:
1) The meterage represents the actual length of the drilled lengths.
2) Estimated true widths for the Barry interpreted zones are as follows: D series, AB series, H series 70% to 90% of core length, 800 series 50% to 70% of core length.
3) The mineralized intervals listed are above 0.5 g/t Au and with metal factor (grades x thickness) above 5.

Quality Control and Reporting Protocols

The Barry project's drill core gold analyses are performed at the Company's Bachelor Mine analytical laboratory (the "Laboratory") And at AGAT Laboratories in Val d'or. The Company employs a rigorous QA-QC analysis program that meets industry standards. The analyses are carried out by fire assay (A.A.) with atomic absorption finish at Bachelor Mine Laboratory and with gravimetric finish for assay above 10g/t Au at AGAT laboratories. Blanks, duplicates, and certified reference standards are inserted into the sample stream to monitor the Laboratory's performance. The Company's QA-QC program requires that at least 10% of samples be analyzed by an independent laboratory. These verification samples are sent to ALS Minerals laboratory facility located in Val-d'Or, Quebec. The verifications show a high degree of correlation with the Laboratory's results.

Qualified Persons

Donald Trudel, P.Geo., (OGQ # 813) Director of Geology of the Company oversees all exploration activities on the Barry property and has compiled and approved the information contained in this press release. Mr. Trudel is a qualified person as defined by National Instrument 43-101
on standards of disclosure for mineral projects.

About Bonterra Resources Inc.

Bonterra is a Canadian gold exploration company with a large portfolio of advanced exploration assets anchored by a central milling facility in Quebec, Canada. The Company has four main assets, Gladiator, Barry, Moroy, and Bachelor that collectively have a total of 1.24 million ounces in Measured and Indicated categories, and 1.78 million ounces in Inferred category. Importantly, the Company owns the only permitted and operational gold mill in the region. Bonterra is focused on graduating from advanced exploration to a development company to deliver shareholder value.

FOR ADDITIONAL INFORMATION

Marc-André Pelletier, President & CEO
ir@btrgold.com

2872 Sullivan Road, Suite 2, Val d'Or, Quebec J9P 0B9
819-279-9304 | Website: www.btrgold.com

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.
Cautionary and Forward-Looking Statements

Caution regarding forward-looking statements

This press release contains "forward-looking information" that is based on Bonterra's current expectations, estimates, forecasts and projections. This forward-looking information includes, among other things, statements with respect to Bonterra's exploration and development plans and placing the Bachelor-Moroy deposit under long-term care and maintenance. The words "will", "anticipated", "plans" or other similar words and phrases are intended to identify forward-looking information. This forward-looking information includes namely information with respect to the planned exploration programs and the potential growth in mineral resources. Exploration results that include drill results on wide spacings may not be indicative of the occurrence of a mineral deposit and such results do not provide assurance that further work will establish sufficient grade, continuity, metallurgical characteristics and economic potential to be classed as a category of mineral resource. The potential quantities and grades of drilling targets are conceptual in nature and, there has been insufficient exploration to define a mineral resource, and it is uncertain if further exploration will result in the targets being delineated as mineral resources. Forward-looking information is subject to known and unknown risks, uncertainties and other factors that may cause Bonterra's actual results, level of activity, performance or achievements to be materially different from those expressed or implied by such forward-looking information. Such factors include but are not limited to: uncertainties related exploration and development; the ability to raise sufficient capital to fund exploration and development; changes in economic conditions or financial markets, environmental and other judicial, regulatory, political and competitive developments; technological or operational difficulties or inability to obtain permits encountered in connection with exploration activities; and labour relations matters. This list is not exhaustive of the factors that may affect our forward-looking information. These and other factors should be considered carefully, and readers should not place undue reliance on such forward-looking information.

To view the source version of this press release, please visit https://www.newsfilecorp.com/release/144192

Stock Information

Company Name: Bonterra Resources Inc.
Stock Symbol: BTR:CC
Market: TSXVC
Website: btrgold.com

Menu

BTR:CC BTR:CC Quote BTR:CC Short BTR:CC News BTR:CC Articles BTR:CC Message Board
Get BTR:CC Alerts

News, Short Squeeze, Breakout and More Instantly...