Twitter

Link your Twitter Account to Market Wire News


When you linking your Twitter Account Market Wire News Trending Stocks news and your Portfolio Stocks News will automatically tweet from your Twitter account.


Be alerted of any news about your stocks and see what other stocks are trending.



home / news releases / FUU:CC - F3 Hits Anomalous Radioactivity on A1B Shear 2.6km South of JR Zone


FUU:CC - F3 Hits Anomalous Radioactivity on A1B Shear 2.6km South of JR Zone

Off-Scale Mineralization at JR Zone Extended 25m Southward

Kelowna, British Columbia--(Newsfile Corp. - September 14, 2023) - F3 Uranium Corp (TSXV: FUU) (OTCQB: FUUF) ("F3" or "the Company") is pleased to announce results from thirteen holes of the ongoing summer drill program on the Patterson Lake North ("PLN") Property, including PLN23-095 2.6km south of the JR Zone testing the recently discovered A1B Shear Zone, which intersected anomalous radioactivity. Additionally, PLN23-093 was drilled 840m further to the south along strike and intersected intense alteration and dissolution in the sandstone and strongly deformed and clay altered basement rocks.

Concurrently at the JR Zone, PLN23-090 extended off-scale mineralization by 25m towards the south from PLN23-062 (see NR May 15, 2023). Drill hole PLN23-090 on line 120S intersected mineralization over a 14.0m interval, including 1.65m of high grade (>10,000 cps), of which 0.50m was off-scale radioactivity (>65,535 cps) between 240.00 and 240.50m. PLN23-097 on line 045S intersected mineralization over an 11.0m interval, including 2.69m of high grade (>10,000 cps), of which 0.25m was off-scale radioactivity (>65,535 cps) between 219.75m and 220.00m, resulting in a high grade dip extent of 52m on line 045S.

JR Zone drilling, as well as exploration drilling, continues with two diamond drills and one sonic drill. As a result of the recently over-subscribed private placement, grossing aggregate proceeds of C$20 Million in flow through funds (see NR September 12, 2023), and strong drilling results, the summer drill program will be further extended into late fall and consist of up to 54 drill holes totaling approximately 20,000m.

Raymond Ashley, President, commented:

"As the summer drilling program transitions into an expanded fall program, we are starting to focus on exploration drilling, with the goal of characterizing areas for more detailed follow-up drilling during 2024. The A1B EM conductor was first confirmed to correspond to a major shear zone with PLN23-078 (see NR August 14, 2023); PLN23-095 was drilled as a follow up, testing both the A1 and A1B shear zones on section. This resulted in the intersection of several additional shears ranging in thickness from 5 to 10 meters both between the A1 and A1B main shear zones, as well as beyond the main A1B shear where PLN23-095 intersected anomalous radioactivity at depth within the approximately 400m wide structural corridor. Drilling at the JR Zone continues as well, with some drill holes exploring the peripheral regions to the high grade mineralization, as well as expanding the high grade domains on lines 045S and 120S.

"PLN23-093 targeted the A1B main shear near the projected Athabasca Unconformity; due to significantly more sandstone than expected, the structure was overshot by approximately 100m. The intense sandstone alteration and dissolution was coupled with drill core loss encountered over a 140m interval, in line with the projection of the A1B shear, followed by strongly deformed and clay altered basement rocks. These are features associated with JR Zone mineralization on the A1 main shear zone that, coupled with the radioactivity intersected in PLN23-095, reinforce the potential for A1B to host uranium mineralization."

JR Zone Drilling Highlights:

PLN23-090 (line 120S):

  • 14.0m composite mineralization from 231.5m - 248.50m, including
    • 1.65m composite mineralization of >10,000 cps radioactivity between 239.20m - 245.20m including 0.50m off-scale radioactivity (> 65,535 cps) between 240.00m and 240.50m

PLN23-097 (line 045S):

  • 11.0m mineralization from 212.5m - 223.5m, including
    • 2.69m composite mineralization of >10,000 cps radioactivity between 215.65m - 224.24m including 0.25m off-scale radioactivity (> 65,535 cps) between 219.75m and 220.00m

Exploration Drilling Highlights:

PLN23-093 (line 3450S), A1B Shear Zone

  • 75.0m cumulative core loss in Athabasca Sandstone between 140.0m and 287.0m
    • Approximately 100m up-dip of the A1B Main Shear projection to the unconformity
    • Indicative of large scale sandstone dissolution due to intense alteration above the projected A1B shear zone

PLN23-095 (line 2610S), A1B Shear Zone

  • 0.5m radioactivity of 300 cps from 610.00m to 610.50m
    • First occurrence of anomalous radioactivity, approximately 100m past the main A1B shear zone within the 50m wide A1B shear zone complex

Table 1. Drill Hole Summary and Handheld Spectrometer Results

Collar Information
* Hand-held Spectrometer Results On Mineralized Drillcore (>300 cps / >0.5m minimum)
Athabasca Unconformity Depth (m)
Total Drillhole Depth (m)
Hole ID
Section Line
Easting
Northing
Elevation
Az
Dip
From
(m)
To
(m)
Interval (m)
Max CPS
PLN23-087
435S
587983.0
6410421.8
531.5
54.2
-59.7
A1 MSZ exploration; no radioactivity >300 cps
n/a
344
PLN23-088
060S
587640.5
6410626.1
543.9
53.8
-70.5
Deep A1 MSZ test; no radioactivity >300 cps
183.2
419
PLN23-089
300S
587849.0
6410449.7
527.2
45.8
-55.4
A1 MSZ exploration; no radioactivity >300 cps
149.0
320
PLN23-090
120S
587828.0
6410594.8
545.5
13.6
-60.5
231.50
232.00
0.50
550
188.0
368
 
 
 
 
 
 
 
232.00
232.50
0.50
6600
 
 
 
 
 
 
 
 
 
232.50
233.00
0.50
2900
 
 
 
 
 
 
 
 
 
233.00
233.50
0.50
4600
 
 
 
 
 
 
 
 
 
233.50
234.00
0.50
4300
 
 
 
 
 
 
 
 
 
234.00
234.50
0.50
6700
 
 
 
 
 
 
 
 
 
234.50
235.00
0.50
2100
 
 
 
 
 
 
 
 
 
235.00
235.50
0.50
1400
 
 
 
 
 
 
 
 
 
235.50
236.00
0.50
3200
 
 
 
 
 
 
 
 
 
236.00
236.50
0.50
920
 
 
 
 
 
 
 
 
 
236.50
237.00
0.50
860
 
 
 
 
 
 
 
 
 
237.00
237.50
0.50
<300
 
 
 
 
 
 
 
 
 
237.50
238.00
0.50
430
 
 
 
 
 
 
 
 
 
238.00
238.50
0.50
1400
 
 
 
 
 
 
 
 
 
238.50
239.00
0.50
770
 
 
 
 
 
 
 
 
 
239.00
239.20
0.20
9900
 
 
 
 
 
 
 
 
 
239.20
239.50
0.30
18700
 
 
 
 
 
 
 
 
 
239.50
239.65
0.15
12200
 
 
 
 
 
 
 
 
 
239.65
240.00
0.35
9800
 
 
 
 
 
 
 
 
 
240.00
240.50
0.50
>65535
 
 
 
 
 
 
 
 
 
240.50
241.00
0.50
40000
 
 
 
 
 
 
 
 
 
241.00
241.50
0.50
8700
 
 
 
 
 
 
 
 
 
241.50
242.00
0.50
750
 
 
 
 
 
 
 
 
 
245.00
245.20
0.20
16500
 
 
 
 
 
 
 
 
 
245.20
245.50
0.30
9700
 
 
 
 
 
 
 
 
 
245.50
246.50
1.00
<300
 
 
 
 
 
 
 
 
 
246.50
247.00
0.50
320
 
 
 
 
 
 
 
 
 
247.00
248.00
1.00
<300
 
 
 
 
 
 
 
 
 
248.00
248.50
0.50
460
 
 
PLN23-091
555S
588100.3
6410348.0
534.4
54.3
-60.0
A1 MSZ exploration; no radioactivity >300 cps
145.9
314
PLN23-092
060S
587806.5
6410746.2
546.1
54.9
-55.0
A1 MSZ exploration; no radioactivity >300 cps
208.2
299
PLN23-093
3450S
589796.7
6408001.6
540.0
53.6
-55.9
A1B MSZ exploration; no radioactivity >300 cps
374.4
578
PLN23-094
105S
587766.7
6410661.8
544.4
54.1
-59.2
231.00
231.50
0.50
410
203.1
305
 
 
 
 
 
 
 
231.50
233.50
2.00
<300
 
 
 
 
 
 
 
 
 
233.50
234.00
0.50
360
 
 
PLN23-095
2610S
589161.3
6408578.2
542.7
54.3
-50.5
610.00
610.50
0.50
300
n/a
680.8
PLN23-096
090S
587780.0
6410689.9
546.3
54.2
-61.1
221.00
221.50
0.50
710
194.0
302
PLN23-097
045S
587755.1
6410727.5
545.4
55.7
-59.8
212.50
213.00
0.50
330
203.2
296
 
 
 
 
 
 
 
213.00
213.50
0.50
1100
 
 
 
 
 
 
 
 
 
213.50
214.00
0.50
1100
 
 
 
 
 
 
 
 
 
214.00
214.50
0.50
840
 
 
 
 
 
 
 
 
 
214.50
215.00
0.50
1100
 
 
 
 
 
 
 
 
 
215.00
215.50
0.50
3800
 
 
 
 
 
 
 
 
 
215.50
215.65
0.15
8100
 
 
 
 
 
 
 
 
 
215.65
216.00
0.35
12600
 
 
 
 
 
 
 
 
 
216.00
216.50
0.50
22600
 
 
 
 
 
 
 
 
 
216.50
217.00
0.50
15000
 
 
 
 
 
 
 
 
 
217.00
217.50
0.50
25700
 
 
 
 
 
 
 
 
 
217.50
217.85
0.35
19600
 
 
 
 
 
 
 
 
 
217.85
218.00
0.15
3100
 
 
 
 
 
 
 
 
 
218.00
218.50
0.50
6400
 
 
 
 
 
 
 
 
 
218.50
219.00
0.50
2200
 
 
 
 
 
 
 
 
 
219.00
219.50
0.50
410
 
 
 
 
 
 
 
 
 
219.50
219.75
0.25
8200
 
 
 
 
 
 
 
 
 
219.75
220.00
0.25
>65535
 
 
 
 
 
 
 
 
 
220.00
220.50
0.50
4000
 
 
 
 
 
 
 
 
 
220.50
221.00
0.50
2400
 
 
 
 
 
 
 
 
 
221.00
221.50
0.50
4000
 
 
 
 
 
 
 
 
 
221.50
222.00
0.50
5600
 
 
 
 
 
 
 
 
 
222.00
222.24
0.24
14000
 
 
 
 
 
 
 
 
 
222.24
222.50
0.26
2200
 
 
 
 
 
 
 
 
 
222.50
223.00
0.50
1700
 
 
 
 
 
 
 
 
 
223.00
223.50
0.50
450
 
 
PLN23-098
120S
587766.3
6410642.8
544.5
54.4
-58.3
226.00
226.50
0.50
340
201.6
332
 
 
 
 
 
 
 
233.00
233.50
0.50
1300
 
 
 
 
 
 
 
 
 
233.50
234.00
0.50
460
 
 
PLN23-099
045S
587767.9
6410736.9
545.3
53.9
-60.2
210.00
210.50
0.50
300
194.3
302

 

Handheld spectrometer composite parameters:
1: Minimum Thickness of 0.5m
2: CPS Cut-Off of 300 counts per second
3: Maximum Internal Dilution of 2.0m

Natural gamma radiation in the drill core that is reported in this news release was measured in counts per second (cps) using a handheld Radiation Solutions RS-125 scintillometer. The Company considers greater than 300 cps on the handheld spectrometer as anomalous, >10,000 cps as high grade and greater than 65,535 cps as off-scale. The reader is cautioned that scintillometer readings are not directly or uniformly related to uranium grades of the rock sample measured and should be used only as a preliminary indication of the presence of radioactive materials.

All depth measurements reported are down-hole and true thickness are yet to be determined but the Company estimates true thickness of the reported intervals in this news release to be close to reported interval widths.

About Patterson Lake North:

The Company's 4,078-hectare 100% owned Patterson Lake North property (PLN) is located just within the south-western edge of the Athabasca Basin in proximity to Fission Uranium's Triple R and NexGen Energy's Arrow high-grade world class uranium deposits which is poised to become the next major area of development for new uranium operations in northern Saskatchewan. PLN is accessed by Provincial Highway 955, which transects the property, and the new JR Zone uranium discovery is located 23km northwest of Fission Uranium's Triple R deposit.

Qualified Person:

The technical information in this news release has been prepare in accordance with the Canadian regulatory requirements set out in National Instrument 43-101 and approved on behalf of the company by Raymond Ashley, P.Geo., President & COO of F3 Uranium Corp, a Qualified Person. Mr. Ashley has verified the data disclosed.

About F3 Uranium Corp.:

F3 Uranium is a uranium project generator and exploration company, focusing on projects in the Athabasca Basin, home to some of the world's largest high grade uranium discovery. F3 Uranium currently has 18 projects in the Athabasca Basin. Several of F3's projects are near large uranium discoveries including Triple R, Arrow and Hurricane.

Forward Looking Statements

This news release contains certain forward-looking statements within the meaning of applicable securities laws. All statements that are not historical facts, including without limitation, statements regarding future estimates, plans, programs, forecasts, projections, objectives, assumptions, expectations or beliefs of future performance, including statements regarding the suitability of the Properties for mining exploration, future payments, issuance of shares and work commitment funds, entry into of a definitive option agreement respecting the Properties, are "forward-looking statements." These forward-looking statements reflect the expectations or beliefs of management of the Company based on information currently available to it. Forward-looking statements are subject to a number of risks and uncertainties, including those detailed from time to time in filings made by the Company with securities regulatory authorities, which may cause actual outcomes to differ materially from those discussed in the forward-looking statements. These factors should be considered carefully and readers are cautioned not to place undue reliance on such forward-looking statements. The forward-looking statements and information contained in this news release are made as of the date hereof and the Company undertakes no obligation to update publicly or revise any forward-looking statements or information, whether as a result of new information, future events or otherwise, unless so required by applicable securities laws.

The TSX Venture Exchange and the Canadian Securities Exchange have not reviewed, approved or disapproved the contents of this press release, and do not accept responsibility for the adequacy or accuracy of this release.

F3 Uranium Corp.
750-1620 Dickson Avenue
Kelowna, BC V1Y9Y2
Contact Information
Investor Relations
Telephone: 778 484 8030
Email: ir@fission3corp.com

ON BEHALF OF THE BOARD
"Dev Randhawa"
Dev Randhawa, CEO

(See Plan Maps below and Cross Sections on the F3 Website at https://f3uranium.com/projects/athabasca-basin/pls-area-projects/pln-a1-discovery/ under the sections tab)

Figure 1. Patterson Lake North Summer 2023 Drill Program Update Map 1: Scintillometer Results

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/8110/180584_08eb9667f477a816_003full.jpg

Figure 2. Patterson Lake North Summer 2023 Drill Program Update Map 2

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/8110/180584_08eb9667f477a816_004full.jpg

To view the source version of this press release, please visit https://www.newsfilecorp.com/release/180584

Stock Information

Company Name: Fission 3.0 Corp.
Stock Symbol: FUU:CC
Market: TSXVC
Website: fission3corp.com

Menu

FUU:CC FUU:CC Quote FUU:CC Short FUU:CC News FUU:CC Articles FUU:CC Message Board
Get FUU:CC Alerts

News, Short Squeeze, Breakout and More Instantly...