Twitter

Link your Twitter Account to Market Wire News


When you linking your Twitter Account Market Wire News Trending Stocks news and your Portfolio Stocks News will automatically tweet from your Twitter account.


Be alerted of any news about your stocks and see what other stocks are trending.



home / news releases / NSRPF - High-Grade Assay Results at the Parnell-Vulture Trend


NSRPF - High-Grade Assay Results at the Parnell-Vulture Trend

HIGHLIGHTS

  • First phase of a 15,000 metre reverse circulation (“ RC ”) drilling program across shallow oxide mineralization on granted mining leases at the Parnell-Vulture Trend was completed prior to the 2021 holiday period, with 83 holes drilled for a total of 5,200 metres
  • PhotonAssay gold results from Parnell have been received, with significant assays including:
    • 7 m at 7.75 g/t gold from 31 m in 21NU0198,
    • 4 m at 10.19 g/t gold from 31 m in 21NU0196,
    • 13 m at 2.51 g/t gold from 21 m in 21NU0156, and
    • 8 m at 3.14 g/t gold from 4 m in 21NU0156
  • Initial results received from Vulture include:
    • 8 m at 10.02 g/t gold from 11 m in 21NU0216
  • Further results from holes drilled prior to the holiday period will be released in coming weeks
  • Drilling on the Parnell - Vulture trend is scheduled to recommence on January 24, 2022

    The above results are not necessarily representative of mineralization throughout the Parnell-Vulture Trend. Refer to Table 1 for drill results for all holes drilled to date at Parnell – Vulture.

_________________________________________________________________________

VANCOUVER, British Columbia, Jan. 21, 2022 (GLOBE NEWSWIRE) -- Novo Resources Corp. ( “Novo” or the “Company” ) (TSX: NVO, NVO.WT & NVO.WT.A) (OTCQX: NSRPF) is pleased to provide a drilling update for the Parnell-Vulture trend in Western Australia. The RC drilling planned at Parnell and Vulture is part of the Nullagine Gold Project ( “NGP” ) exploration program ramp-up, with forward programs currently being generated at several priority basement targets ( figure 1 ). Parnell – Vulture is located some 45 kms from the Company’s Golden Eagle processing facility (“ Golden Eagle Plant ”) and is accessed by a robust, reliable haul road and associated infrastructure.

https://www.globenewswire.com/NewsRoom/AttachmentNg/29300a6a-ac54-4be5-84f5-a0fe8d5b48f5
(
Figure 1 : Location map for NGP showing Novo tenure and priority prospects.)

Drilling completed before the holiday period comprised 83 RC holes for 5,200 metres ( figure 4 ), drilled by experienced contractor Stark Drilling using a truck mounted Schramm 450. The initial program at Parnell focussed on every alternate planned drill line, in order to fast track strike coverage. The quick assay turnaround means that best drilling intersections can be followed up immediately whilst the remainder of the program is ongoing.

Parnell - Vulture covers a strike length of approximately 2 kms and contains a series of vein-hosted targets with historical drill intercepts including 9 m at 8.4 g/t gold from 7 m, 12 m at 14.6 g/t gold from 40 m and 7 m at 6.1 g/t gold from 40 m 1 . These results are not necessarily representative of mineralization throughout the district. Refer to Table 2 for drill results for all holes drilled to date at Parnell - Vulture.

Recent results for Parnell - Vulture, received via the Company’s priority arrangement with Intertek 2 , show similar width and grade tenor as historical drilling intersections, improving confidence in historical data and potential strike extent.

Most significant results are located around the historic workings at Parnell, including 4 m at 10.19 g/t gold in hole 21NU0196 ( figure 2 ). The main target is a ~ 10m wide E-W to WNW trending shear variably intruded by porphyry. Mineralization dips moderately to steeply to the south (generally 70 degrees). Sandstone and interbedded siltstone-sandstone sequences adjacent to the main shear are extremely bleached in the weathering profile, indicating likely sericite alteration of the original rock. Alteration is up to 50 m wide. Several other dykes are present in the area, mainly sub-parallel to stratigraphy, including a 6 m thick dolerite dyke and a hornblende porphyritic gabbro.

Results show good continuity along strike ( figure 3 ), and on section show numerous small but frequent high-grade shoot like components. Further infill and extensional drilling will be designed to test this area.

https://www.globenewswire.com/NewsRoom/AttachmentNg/8591dd69-a2ef-4475-92d4-e5392323a2f1
( Figure 2 , section at Parnell showing 21NU0196 results in relation to the main shear zone)

Importantly a series of significant drill intersections are located approximately 550 m along strike to the north-west including 13 m at 2.51 g/t gold from 21 m in 21NU0156, and 8 m at 3.14 g/t gold from 4 m in 21NU0156 ( figure 3 ). This shows the complexity of the system at Parnell and the scale potential of the system along strike.

In addition, the 6 m at 5.28 g/t gold from 29 m in 21NU0204 is located to the north of Parnell in one of the mapped vein swarms. The vein swarm was identified from rock sampling and anomalous results in historical drilling and was tested with a single line of drilling.

Assays received to date also included the first batch from Vulture, including 8 m at 10.02 g/t gold from 11 m in 21NU0216 drilled adjacent to a historical working and in an area of complex quartz veining. Historical results in this area are sparse, and include a best result of 12 m at 2.76 g/t. These results are not necessarily representative of mineralization throughout Vulture. All other results from Vulture are pending and are anticipated within the next three to four weeks.

https://www.globenewswire.com/NewsRoom/AttachmentNg/5cb1a965-7325-4702-9ce8-07ae79484a40
( Figure 3 : Map of historical and Novo significant intercepts at Parnell and Vulture prospect to date.)

https://www.globenewswire.com/NewsRoom/AttachmentNg/4f132c15-5952-41b9-ab6f-b17d1983ad48
( Figure 4 : RC drilling status at Parnell and Vulture.)

Analytic Methodology

Drilling was based on detailed mapping and targeted to be perpendicular to mineralization as much as practical. In some areas, the geology is complex and due to the explorative nature of the work, the true width of mineralization cannot yet be precisely determined.

RC samples from Parnell and Vulture were submitted to Intertek in Perth, Australia. Samples are crushed to -2 mm and RSD split into a single 500-gram jar for PhotonAssay. To test for gold variability and potential coarse gold effect, field duplicates and crushed duplicates were analysed. Standards and blanks are inserted in the sample sequence to test for lab performance.

There were no limitations to the verification process and all relevant data was verified by a qualified person as defined in National Instrument 43-101 Standards of Disclosure for Mineral Projects by reviewing analytical procedures undertaken by the various laboratories. Dr. Quinton Hennigh (P. Geo.) is the qualified person responsible for, and having reviewed and approved, the technical information contained in this news release. Dr. Hennigh is the Non-Executive Co-Chairman and a director of Novo.

ABOUT NOVO

Novo operates its flagship Beatons Creek gold project while exploring and developing its prospective land package covering approximately 13,250 square kilometres in the Pilbara region of Western Australia. In addition to the Company’s primary focus, Novo seeks to leverage its internal geological expertise to deliver value-accretive opportunities to its shareholders. For more information, please contact Leo Karabelas at (416) 543-3120 or e-mail leo@novoresources.com .

On Behalf of the Board of Directors,

Novo Resources Corp.

Michael Spreadborough

Michael Spreadborough

Executive Co-Chairman

Forward-looking information

Some statements in this news release contain forward-looking information (within the meaning of Canadian securities legislation) including, without limitation, that forward programs are currently being generated at several priority basement targets at the NGP, that further infill and extensional drilling will be designed to test the Parnell area, and that all other results from Vulture are anticipated within the next two weeks. These statements address future events and conditions and, as such, involve known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements to be materially different from any future results, performance or achievements expressed or implied by the statements. Such factors include, without limitation, the actual time required by Intertek Laboratory to process samples, customary risks of the resource industry and the risk factors identified in Novo’s management’s discussion and analysis for the nine-month period ended September 30, 2021, which is available under Novo’s profile on SEDAR at www.sedar.com. Forward-looking statements speak only as of the date those statements are made. Except as required by applicable law, Novo assumes no obligation to update or to publicly announce the results of any change to any forward-looking statement contained or incorporated by reference herein to reflect actual results, future events or developments, changes in assumptions or changes in other factors affecting the forward-looking statements. If Novo updates any forward-looking statement(s), no inference should be drawn that the Company will make additional updates with respect to those or other forward-looking statements.

Table 1, collar table of all holes drilled to date

HOLE ID
COORDSYS
EASTING
NORTHING
HEIGHT
AZI GRID
DIP
TYPE
DEPTH
LEASE
21NU0153
MGA94_51
241102.657
7584163.415
388.292
20
-55
RC
54
M46/527
21NU0154
MGA94_51
241089.817
7584125.188
385.508
20
-55
RC
72
M46/527
21NU0155
MGA94_51
241132.708
7584153.606
389.503
20
-55
RC
54
M46/527
21NU0156
MGA94_51
241126.52
7584135.836
387.203
20
-55
RC
54
M46/527
21NU0157
MGA94_51
241119.585
7584113.086
386.179
20
-55
RC
78
M46/527
21NU0158
MGA94_51
241171.268
7584139.014
390.099
20
-55
RC
54
M46/527
21NU0159
MGA94_51
241164.727
7584122.37
387.816
20
-55
RC
54
M46/527
21NU0160
MGA94_51
241155.989
7584099.711
386.639
20
-55
RC
72
M46/527
21NU0161
MGA94_51
241150.265
7584082.431
388.577
20
-55
RC
84
M46/426
21NU0162
MGA94_51
241095.94
7584144.73
390
20
-55
RC
54
M46/527
21NU0163
MGA94_51
241207.643
7584126.922
390.423
20
-55
RC
54
M46/527
21NU0164
MGA94_51
241201.647
7584108.868
387.985
20
-55
RC
60
M46/527
21NU0165
MGA94_51
241192.522
7584082.147
387.827
20
-55
RC
72
M46/527
21NU0166
MGA94_51
241296.684
7584132.045
391.871
20
-55
RC
54
M46/527
21NU0167
MGA94_51
241287.561
7584113.379
389.677
20
-55
RC
54
M46/527
21NU0168
MGA94_51
241281.151
7584095.568
387.696
20
-55
RC
54
M46/527
21NU0169
MGA94_51
241274.333
7584077
388.059
20
-55
RC
54
M46/527
21NU0170
MGA94_51
241267.686
7584058.403
388.542
20
-55
RC
72
M46/426
21NU0171
MGA94_51
241260.893
7584039.838
389.808
20
-55
RC
84
M46/426
21NU0178
MGA94_51
241371.821
7584109.808
389.868
20
-55
RC
54
M46/527
21NU0179
MGA94_51
241364.378
7584089.821
388.733
20
-55
RC
54
M46/527
21NU0180
MGA94_51
241355.952
7584067.665
388.413
20
-55
RC
54
M46/527
21NU0181
MGA94_51
241349.571
7584051.224
388.978
20
-55
RC
54
M46/527
21NU0182
MGA94_51
241342.981
7584033.664
390.309
20
-55
RC
72
M46/426
21NU0183
MGA94_51
241442.282
7584074.733
390.393
20
-55
RC
54
M46/527
21NU0184
MGA94_51
241435.649
7584056.883
390.92
20
-55
RC
54
M46/527
21NU0185
MGA94_51
241428.546
7584037.402
390.719
20
-55
RC
54
M46/527
21NU0186
MGA94_51
241422.145
7584018.315
390.185
20
-55
RC
54
M46/527
21NU0187
MGA94_51
241415.856
7584001.066
391.413
20
-55
RC
72
M46/426
21NU0188
MGA94_51
241409.872
7583981.141
392.928
20
-55
RC
90
M46/426
21NU0189
MGA94_51
241518.391
7584050.74
392.657
20
-55
RC
54
M46/527
21NU0190
MGA94_51
241512.401
7584032.65
393.151
20
-55
RC
54
M46/527
21NU0191
MGA94_51
241505.442
7584013.681
393.377
20
-55
RC
78
M46/527
21NU0192
MGA94_51
241498.661
7583994.874
393.707
20
-55
RC
60
M46/527
21NU0193
MGA94_51
241492.061
7583975.735
393.509
20
-55
RC
72
M46/426
21NU0194
MGA94_51
241487.622
7583962.907
392.934
20
-55
RC
84
M46/426
21NU0195
MGA94_51
241573.298
7583960.428
398.341
20
-55
RC
72
M46/527
21NU0196
MGA94_51
241566.956
7583943.681
396.229
20
-55
RC
84
M46/426
21NU0197
MGA94_51
241590.747
7583950.441
398.514
20
-55
RC
72
M46/527
21NU0198
MGA94_51
241587.36
7583938.799
397.01
20
-55
RC
90
M46/426
21NU0199
MGA94_51
241609.571
7583947.275
397.882
20
-55
RC
72
M46/527
21NU0200
MGA94_51
241603.468
7583931.345
396.59
20
-55
RC
84
M46/426
21NU0201
MGA94_51
241624.481
7583937.163
397.169
20
-55
RC
72
M46/426
21NU0202
MGA94_51
241639.804
7583974.596
397.697
20
-55
RC
54
M46/527
21NU0203
MGA94_51
241689.284
7584055.528
394.643
20
-55
RC
54
M46/527
21NU0204
MGA94_51
241682.225
7584034.409
395.126
20
-55
RC
72
M46/527
21NU0205
MGA94_51
241677.202
7584017.522
394.88
20
-55
RC
84
M46/527
21NU0206
MGA94_51
241797.643
7583972.516
402.059
20
-55
RC
54
M46/527
21NU0207
MGA94_51
241790.682
7583955.216
400.928
20
-55
RC
72
M46/527
21NU0208
MGA94_51
241782.944
7583934.55
401.595
20
-55
RC
54
M46/527
21NU0209
MGA94_51
241776.061
7583914.106
401.157
20
-55
RC
54
M46/527
21NU0210
MGA94_51
241826.679
7583961.085
402.982
20
-55
RC
54
M46/527
21NU0211
MGA94_51
241816.073
7583948.444
402.522
20
-55
RC
72
M46/527
21NU0212
MGA94_51
241810.585
7583920.195
403.255
20
-55
RC
54
M46/527
21NU0213
MGA94_51
241805.417
7583906.187
402.44
20
-55
RC
54
M46/527
21NU0214
MGA94_51
241799.288
7583886.997
403.562
20
-55
RC
72
M46/527
21NU0215
MGA94_51
240690.046
7584259.466
385.551
210
-50
RC
54
M46/426
21NU0216
MGA94_51
240699.858
7584275.457
386.273
210
-50
RC
54
M46/426
21NU0217
MGA94_51
240710.979
7584293.934
387.288
210
-50
RC
54
M46/426
21NU0218
MGA94_51
240721.038
7584311.98
386.623
210
-50
RC
54
M46/426
21NU0219
MGA94_51
240731.366
7584329.776
387.062
210
-50
RC
84
M46/426
21NU0220
MGA94_51
240740.661
7584346.642
387.108
210
-50
RC
54
M46/426
21NU0221
MGA94_51
240665.899
7584296.424
385.045
210
-50
RC
54
M46/426
21NU0222
MGA94_51
240675.809
7584313.227
386.039
210
-50
RC
54
M46/426
21NU0223
MGA94_51
240685.546
7584329.684
385.822
210
-50
RC
54
M46/426
21NU0224
MGA94_51
240696.655
7584349.284
385.907
210
-50
RC
54
M46/426
21NU0225
MGA94_51
240706.331
7584365.897
386.074
210
-50
RC
54
M46/426
21NU0226
MGA94_51
240716.124
7584382.575
386.974
210
-50
RC
84
M46/426
21NU0227
MGA94_51
240724.983
7584398.074
387.66
210
-50
RC
54
M46/426
21NU0228
MGA94_51
240673.321
7584390.563
386.935
210
-50
RC
54
M46/426
21NU0229
MGA94_51
240681.247
7584404.148
387.378
210
-50
RC
54
M46/426
21NU0230
MGA94_51
240690.323
7584420.965
388.316
210
-50
RC
54
M46/426
21NU0231
MGA94_51
240701.86
7584440.337
389.138
210
-50
RC
84
M46/426
21NU0232
MGA94_51
240646.8
7584424.125
387.49
210
-50
RC
54
M46/426
21NU0233
MGA94_51
240656.929
7584440.846
391.511
210
-50
RC
54
M46/426
21NU0234
MGA94_51
240668.378
7584458.307
390.53
210
-50
RC
54
M46/426
21NU0235
MGA94_51
240678.186
7584475.581
390.304
210
-50
RC
84
M46/426
21NU0236
MGA94_51
240602.903
7584426.905
387.291
210
-50
RC
54
M46/426
21NU0237
MGA94_51
240612.729
7584444.263
387.578
210
-50
RC
54
M46/426
21NU0238
MGA94_51
240623.145
7584461.986
387.704
210
-50
RC
54
M46/426
21NU0239
MGA94_51
240633.731
7584480.114
387.677
210
-50
RC
54
M46/426
21NU0240
MGA94_51
240641.921
7584494.857
387.603
210
-50
RC
54
M46/426

Table 2, Significant intercept table for all results from this phase of drilling with a gram * metre intersection greater than 1. The table is generated using a 0.5 g/t gold cut off and no more than two metre internal waste.

HOLE ID
FROM
TO
Au ppm
WIDTH
GRAM*METRES
21NU0216
11
19
10.02
8
80.16
21NU0198
31
38
7.75
7
54.25
21NU0196
31
35
10.19
4
40.76
21NU0156
21
34
2.5
13
32.5
21NU0204
29
35
5.28
6
31.68
21NU0156
4
12
3.14
8
25.12
21NU0161
71
73
9.93
2
19.86
21NU0207
0
7
2.67
7
18.69
21NU0169
27
29
8.59
2
17.18
21NU0165
2
9
2.38
7
16.66
21NU0154
49
51
8.1
2
16.2
21NU0208
28
32
3.94
4
15.76
21NU0162
14
17
4.24
3
12.72
21NU0199
18
31
0.94
13
12.22
21NU0170
30
36
1.81
6
10.86
21NU0195
21
29
1.22
8
9.76
21NU0200
34
36
4.86
2
9.72
21NU0197
25
38
0.67
13
8.71
21NU0157
68
70
4.13
2
8.26
21NU0196
40
50
0.72
10
7.2
21NU0216
26
28
3.43
2
6.86
21NU0187
59
61
3.31
2
6.62
21NU0205
34
37
2.16
3
6.48
21NU0159
28
36
0.73
8
5.84
21NU0153
24
30
0.95
6
5.7
21NU0156
43
46
1.63
3
4.89
21NU0154
59
65
0.67
6
4.02
21NU0205
2
4
1.88
2
3.76
21NU0192
33
36
1.22
3
3.66
21NU0160
18
20
1.77
2
3.54
21NU0180
9
14
0.67
5
3.35
21NU0190
10
12
1.62
2
3.24
21NU0207
17
19
1.53
2
3.06
21NU0153
1
3
1.42
2
2.84
21NU0166
35
37
1
2
2
21NU0169
12
15
0.66
3
1.98
21NU0202
6
8
0.93
2
1.86
21NU0164
51
53
0.92
2
1.84
21NU0198
48
50
0.82
2
1.64
21NU0203
10
12
0.82
2
1.64
21NU0188
58
60
0.77
2
1.54
21NU0184
1
3
0.76
2
1.52
21NU0160
27
29
0.75
2
1.5
21NU0201
24
26
0.75
2
1.5
21NU0171
80
82
0.73
2
1.46
21NU0198
82
84
0.7
2
1.4
21NU0196
81
83
0.6
2
1.2
21NU0157
50
52
0.55
2
1.1
21NU0169
1
3
0.53
2
1.06
21NU0207
38
40
0.5
2
1

________________________
1 Refer to the Company’s news release dated November 19, 2021 .
2 Refer to the Company’s news release dated May 18, 2021 .


Stock Information

Company Name: Novo Resources Corp
Stock Symbol: NSRPF
Market: OTC
Website: novoresources.com

Menu

NSRPF NSRPF Quote NSRPF Short NSRPF News NSRPF Articles NSRPF Message Board
Get NSRPF Alerts

News, Short Squeeze, Breakout and More Instantly...