Twitter

Link your Twitter Account to Market Wire News


When you linking your Twitter Account Market Wire News Trending Stocks news and your Portfolio Stocks News will automatically tweet from your Twitter account.


Be alerted of any news about your stocks and see what other stocks are trending.



home / news releases / LIO:CC - Lion One Starts Mechanized Production at Tuvatu Drills 1.2 M of 393.01 g/t Gold


LIO:CC - Lion One Starts Mechanized Production at Tuvatu Drills 1.2 M of 393.01 g/t Gold

North Vancouver, British Columbia--(Newsfile Corp. - June 5, 2024) - Lion One Metals Limited (TSXV: LIO) (OTCQX: LOMLF) (ASX: LLO) ("Lion One" or the "Company") is pleased to report the start of mechanized production at Tuvatu and reports significant new high-grade gold results from Zone 5 infill and grade control drilling at its 100% owned Tuvatu Alkaline Gold Project in Fiji.

Mechanized production mining has commenced at Tuvatu. The first remote bogging at Tuvatu occurred on May 16th, and the first long hole stope blast occurred on May 18th. Both are also firsts for the country of Fiji. This is a major milestone for the company as it represents the transition from predominantly development mining to predominantly production mining. The processing plant can now also sustainably process over 400 TPD, which is above the plant's name plate capacity of 300 TPD. The increased throughput is possible due to the successful implementation of operational improvements and debottlenecking initiatives completed by the mill team.

Assay results are also presented here for infill and grade control drilling in the Zone 5 area of Tuvatu. Drill results include multiple bonanza grade gold assays such as 1568.55 g/t, 215.86 g/t, 143.95 g/t, and 134.68 g/t (see Table 1 below). These results are all located proximal to underground development in the near-surface portion of the mine. Drilling was focused on two locations; to the north and south of the Cabex fault, which is a carbonate healed, deposit scale structure. The primary targets for these drillholes were the downdip and southern extensions of the UR2 and URW3 lodes. Previous drill results from the Zone 5 area are available in the December 13, 2023, November 2, 2023, and August 10, 2023 news releases.

Highlights:

  • First mechanized production mining at Tuvatu

  • First ever remote bogging at Tuvatu on May 16th

  • First ever long hole firing at Tuvatu on May 18th

  • Mill operations increased from 300 TPD to 400 TPD

  • Top new drill intersects: 

393.01 g/t Au over 1.2 m (including 1568.55 g/t Au over 0.3 m)
215.86 g/t Au over 0.6 m
49.85 g/t Au over 1.2 m
(including 63.35 g/t Au over 0.3 m)
14.98 g/t Au over 3.9 m (including 143.95 g/t Au over 0.3 m)
26.59 g/t Au over 1.8 m (including 90.85 g/t Au over 0.3 m)

  • 36 new drill holes reported (30 underground, 6 surface)

  • 4930.7 m of new drilling reported

*All drill intersects are downhole lengths, 3.0 g/t cutoff. See Table 1 for additional data

Figure 1. Location of Zone 5 drilling reported in this news release. Left image: Plan view of Tuvatu showing Zone 5 drillholes in relation to the mineralized lodes at Tuvatu, shown in grey. The approximate location of the Cabex fault at the 1120 level is shown in light blue. Zone 5 drilling is divided into North of Cabex and South of Cabex programs. Yellow dashed square represents the area shown in the right image. Right image: Oblique view of Zone 5 drilling looking northeast. The Cabex Fault is modelled in pale blue, striking ESE and dipping SSW.

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/2178/211748_19a03de954442a42_001full.jpg

Table 1. Highlights of grade control and infill drill results in the Zone 5 area. Composites are calculated using a 3 g/t Au cutoff with maximum internal dilution intervals of 1 m at <3 g/t Au. For full results see Table 3 in the appendix.

Hole ID

From (m)
To (m)
Width (m)
Au (g/t)
TGC-0163

24.9
26.1
1.2
393.01

including
25.8
26.1
0.3
1568.55
TUDDH-709

252.2
252.8
0.6
215.86
TGC-0173

98.7
99.9
1.2
49.85
TGC-0171

103.2
107.1
3.9
14.98

including
105.3
106.5
1.2
42.42

which includes
106.2
106.5
0.3
143.95
TGC-0179

101.1
102.9
1.8
26.59

including
102.6
102.9
0.3
90.85
TUDDH-718

249.9
254.4
4.5
9.79

including
251.4
252.6
1.2
20.63
TGC-0181

60.0
60.9
0.9
47.11

including
60.6
60.9
0.3
134.68
TGC-0149

19.2
22.2
3.0
11.06

including
21.3
22.2
0.9
29.92

which includes
21.9
22.2
0.3
73.22
TGC-0164

100.5
102.9
2.4
11.95

including
101.7
102.6
0.9
20.42
TUDDH-718

267.9
270.0
2.1
12.73

including
267.9
268.5
0.6
31.96
TGC-0161

94.2
96.0
1.8
14.53
TGC-0166

103.7
106.4
2.7
9.64

including
104.0
104.6
0.6
33.10
TUDDH-714

241.7
243.8
2.1
12.02

including
243.2
243.8
0.6
24.02
*All drill intersects are downhole lengths

 

Zone 5 Drilling

The Zone 5 area of Tuvatu is located along the main decline and includes the principal north-south oriented lodes (UR1 to UR3), the principal northeast-southwest oriented lodes (UR4 to UR8), and several of the western lodes (URW2, URW2A, URW3). These lodes are steeply dipping structures that converge at approximately 500 m depth to form the 500 Zone, which is the highest-grade part of the deposit and is interpreted to be the feeder zone at Tuvatu. The system remains open at depth with the deepest high-grade intersects occurring below 1000 m depth.

The drilling reported in this news release was focused on the near-surface portions of the UR2 and URW3 lodes. These areas are scheduled to be mined throughout the next 12 months. Drilling was separated into two focus areas; to the north of the Cabex Fault, and to the south of the Cabex Fault. The Cabex Fault is a post-mineralization fault that strikes approximately ESE and dips approximately 65° to the SSW. It is interpreted to be a late caldera collapse structure that is healed with carbonate.

The purpose of the Zone 5 infill and grade control drill program is to enhance the mine model and inform stope design in advance of mining. Drilling to the north of the Cabex primarily targeted the down dip extension of the UR2 lode below the 1120 level. Drilling to the south of the Cabex targeted both the down dip extensions of the UR2 and URW3 lodes below the 1100 level, as well as the southern extension of the lodes above and below the 1120 level. Highlights of the Zone 5 drill program are shown in Figure 2 and Figure 3.

Figure 2. Zone 5 north of Cabex drilling with high-grade intersects highlighted, 3.0 g/t gold cutoff. View is to the NNW. The primary target area is the down-dip extension of the UR2 lode below the 1120 level.

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/2178/211748_19a03de954442a42_002full.jpg

Figure 3. Zone 5 south of Cabex drilling with high-grade intersects highlighted, 3.0 g/t gold cutoff. View is to the NNE. The primary target areas are the southern extension of the UR2 and URW3 lodes above and below the 1120 level, and the down-dip extension of the UR2 and URW3 lodes below the 1100 level.

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/2178/211748_19a03de954442a42_003full.jpg

Operations Update

Mechanized production mining is underway at Tuvatu. The two remote-capable loaders on site are now fully commissioned and in operation. The first ever remote bogging activity at Tuvatu occurred on May 16th at the 1120 level south, on the UR2 lode in Zone 5. Remote loaders are necessary to extract material from open stopes after blasting. The two long hole drills on site are also fully commissioned and in operation. The first ever long hole production blast at Tuvatu occurred on May 18th, blasting level to level via long holes from the 1120 level north to the 1130 level north, also on the UR2 lode in Zone 5. Both the first remote bogging activity and the first long hole production blast at Tuvatu are major milestones for the company as they represent the start of mechanized production mining. They are also both firsts for the country of Fiji as this style of mining has not taken place in Fiji until now.

Figure 4. Location of the first long hole production blasting and remote bogging activities at Tuvatu. Left image: Plan view of Tuvatu showing the location of long hole blasting and remote bogging activities in relation to the underground development (red) and the mineralized lodes (grey) at Tuvatu. Yellow dashed square represents the area shown in the right image. Right image: Oblique view looking northeast.

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/2178/211748_19a03de954442a42_004full.jpg

Mill operations are also advancing successfully. Operational improvements and debottlenecking projects completed by the mill operations team have successfully increased throughput at the mill. These bottlenecking projects include upgrading the process water recycle system, upgrading the thickener pumps and piping, and reducing the tailings filter press cycle times. As a result of these upgrades the processing plant can now achieve a sustained throughput of over 400 TPD, with peak daily throughput of over 450 TPD. The name plate capacity of the processing plant during the ongoing pilot plant stage of operations is 300 TPD. These upgrades therefore represent a substantial improvement in the processing capacity available at Tuvatu.

Competent Persons Statement

The information in this report that relates to mineral exploration at the Tuvatu Gold Project is based on information compiled by the Lion One team and reviewed by Alex Nichol, who is the company's Vice President of Geology and Exploration. Mr Nichol is a Member of the Australian Institute of Geoscientists and has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration, and to the activity being undertaken, to qualify as a Competent Person as defined in the 2012 edition of the 'Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves' (JORC code). Mr Nichol consents to the inclusion in this report of the matters based on the information in the form and context in which it appears.

Lion One Laboratories / QAQC

Lion One adheres to rigorous QAQC procedures above and beyond basic regulatory guidelines in conducting its drilling, sampling, testing, and analyses. The Company operates its own geochemical assay laboratory and its own fleet of diamond drill rigs using PQ, HQ and NQ sized drill rods.

Diamond drill core samples are logged and split by Lion One personnel on site and delivered to the Lion One Laboratory for preparation and analysis. All samples are pulverized at the Lion One lab to 85% passing through 75 microns and gold analysis is carried out using fire assay with an AA finish. Samples that return grades greater than 10.00 g/t Au are re-analyzed by gravimetric method, which is considered more accurate for very high-grade samples.

Duplicates of 5% of samples with grades above 0.5 g/t Au are delivered to ALS Global Laboratories in Australia for check assay determinations using the same methods (Au-AA26 and Au-GRA22 where applicable). ALS also analyses 33 pathfinder elements by HF-HNO3-HClO4 acid digestion, HCl leach and ICP-AES (method ME-ICP61). The Lion One lab can test a range of up to 71 elements through Inductively Coupled Plasma Optical Emission Spectrometry (ICP-OES), but currently focuses on a suite of 23 important pathfinder elements with an aqua regia digest and ICP-OES finish.

About Lion One Metals Limited

Lion One Metals is an emerging Canadian gold producer headquartered in North Vancouver BC, with new operations established in late 2023 at its 100% owned Tuvatu Alkaline Gold Project in Fiji. The Tuvatu project comprises the high-grade Tuvatu Alkaline Gold Deposit, the Underground Gold Mine, the Pilot Plant, and the Assay Lab. The Company also has an extensive exploration license covering the entire Navilawa Caldera, which is host to multiple mineralized zones and highly prospective exploration targets.

Contact Information

Investor inquiries: info@liononemetals.com

Phone:1-855-805-1250 (toll free North America)

Website: www.liononemetals.com

Neither the TSX-V nor its Regulation Service Provider accepts responsibility or the adequacy or accuracy of this release

This press release may contain statements that may be deemed to be "forward-looking statements" within the meaning of applicable Canadian securities legislation. All statements, other than statements of historical fact, included herein are forward-looking information. Generally, forward-looking information may be identified by the use of forward-looking terminology such as "plans", "expects" or "does not expect", "proposed", "is expected", "budget", "scheduled", "estimates", "forecasts", "intends", "anticipates" or "does not anticipate", or "believes", or variations of such words and phrases, or by the use of words or phrases which state that certain actions, events or results may, could, would, or might occur or be achieved. This forward-looking information reflects Lion One Metals Limited's current beliefs and is based on information currently available to Lion One Metals Limited and on assumptions Lion One Metals Limited believes are reasonable. These assumptions include, but are not limited to, the actual results of exploration projects being equivalent to or better than estimated results in technical reports, assessment reports, and other geological reports or prior exploration results. Forward-looking information is subject to known and unknown risks, uncertainties and other factors that may cause the actual results, level of activity, performance, or achievements of Lion One Metals Limited or its subsidiaries to be materially different from those expressed or implied by such forward-looking information. Such risks and other factors may include, but are not limited to: the stage development of Lion One Metals Limited, general business, economic, competitive, political and social uncertainties; the actual results of current research and development or operational activities; competition; uncertainty as to patent applications and intellectual property rights; product liability and lack of insurance; delay or failure to receive board or regulatory approvals; changes in legislation, including environmental legislation, affecting mining, timing and availability of external financing on acceptable terms; not realizing on the potential benefits of technology; conclusions of economic evaluations; and lack of qualified, skilled labor or loss of key individuals. Although Lion One Metals Limited has attempted to identify important factors that could cause actual results to differ materially from those contained in forward-looking information, there may be other factors that cause results not to be as anticipated, estimated, or intended. Accordingly, readers should not place undue reliance on forward-looking information. Lion One Metals Limited does not undertake to update any forward-looking information, except in accordance with applicable securities laws.

Appendix 1: Full Drill Results and Collar Information

Table 2. Collar coordinates for drillholes reported in this release. Coordinates are in Fiji map grid.

Hole ID
Easting
Northing
Elevation
Azimuth
Dip
Depth
TGC-0137
1876384
3920626
129
100.4
8.2
116.4
TGC-0139
1876384
3920627
129
84.2
1.1
92.6
TGC-0141
1876384
3920627
129
89.0
0.5
105.0
TGC-0143
1876386
3920530
111
109.9
15.4
135.0
TGC-0145
1876383
3920628
128
60.5
-8.2
131.2
TGC-0147
1876383
3920628
128
52.2
-7.2
140.0
TGC-0149
1876386
3920530
111
117.7
9.5
135.0
TGC-0151
1876383
3920628
128
65.5
-6.1
48.0
TGC-0153
1876383
3920628
129
65.8
6.6
125.5
TGC-0154
1876386
3920530
111
123.1
11.9
11.1
TGC-0155
1876386
3920530
110
123.3
8.1
135.0
TGC-0157
1876383
3920627
129
70.7
6.8
116.0
TGC-0159
1876387
3920531
110
100.8
-13.3
135.0
TGC-0160
1876383
3920627
129
78.6
5.6
26.7
TGC-0161
1876383
3920627
129
78.4
7.1
105.0
TGC-0163
1876387
3920531
110
107.1
-13.2
135.0
TGC-0164
1876384
3920626
128
91.7
-13.5
115.6
TGC-0166
1876384
3920627
128
84.6
-18.4
120.0
TGC-0167
1876387
3920531
110
107.9
-18.9
140.4
TGC-0169
1876384
3920626
128
104.5
-18.2
120.0
TGC-0171
1876387
3920531
110
100.1
-18.5
140.3
TGC-0173
1876384
3920627
128
83.4
-11.4
113.6
TGC-0175
1876386
3920528
109
158.2
-22.2
100.2
TGC-0177
1876383
3920627
128
78.2
-9.9
92.5
TGC-0178
1876386
3920530
111
127.3
8.7
140.0
TGC-0179
1876383
3920627
128
71.6
-9.3
111.0
TGC-0180
1876383
3920628
128
65.5
-8.7
125.5
TGC-0181
1876386
3920530
110
131.6
7.9
140.1
TGC-0182
1876384
3920627
128
77.5
-10.6
105.0
TUDDH-699
1876557
3920390
352
310.1
-58.6
9.9
TUDDH-702
1876557
3920390
352
310.3
-57.6
263.5
TUDDH-705
1876557
3920390
352
308.5
-66.0
270.0
TUDDH-707
1876458
3920271
403
328.2
-60.9
320.6
TUDDH-709
1876559
3920388
353
311.1
-64.0
270.0
TUDDH-714
1876559
3920388
353
303.6
-66.7
270.0
TUDDH-718
1876559
3920388
353
297.6
-65.3
270.0

 

Table 3. Composite results from drillholes reported in this news release (composite grade >3.0 g/t Au)

Hole ID

From (m)
To (m)
Width (m)
Au (g/t)
TGC-0137

79.8
80.4
0.6
5.88
TGC-0141

93.7
95.2
1.5
11.16

including
93.7
94.0
0.3
10.05

and
94.0
94.3
0.3
20.02

and
94.3
94.6
0.3
6.13

and
94.6
94.9
0.3
3.99

and
94.9
95.2
0.3
15.60
TGC-0141

96.7
97.0
0.3
9.92
TGC-0143

95.2
95.8
0.6
19.32

including
95.2
95.5
0.3
7.50

and
95.5
95.8
0.3
31.13
TGC-0143

106.3
107.2
0.9
16.37

including
106.3
106.6
0.3
10.89

and
106.6
106.9
0.3
30.74

and
106.9
107.2
0.3
7.48
TGC-0143

120.7
121.0
0.3
7.61
TGC-0145

110.2
111.4
1.2
3.63

including
110.2
110.5
0.3
3.69

and
110.5
110.8
0.3
4.30

and
110.8
111.1
0.3
3.52

and
111.1
111.4
0.3
3.01
TGC-0149

19.2
22.2
3.0
11.06

including
19.2
19.5
0.3
3.27

and
19.5
20.1
0.6
3.79

and
20.1
20.7
0.6
<0.01

and
20.7
21.3
0.6
5.00

and
21.3
21.6
0.3
6.10

and
21.6
21.9
0.3
10.45

and
21.9
22.2
0.3
73.22
TGC-0149

30.0
30.9
0.9
7.98
TGC-0149

30.0
30.3
0.3
17.17
TGC-0149

30.3
30.9
0.6
3.38
TGC-0149

55.8
56.1
0.3
4.92
TGC-0149

87.6
87.9
0.3
5.22
TGC-0149

89.4
90.0
0.6
11.29

including
89.4
89.7
0.3
15.06

and
89.7
90.0
0.3
7.51
TGC-0149

103.5
104.7
1.2
14.46

including
103.5
103.8
0.3
9.85

and
103.8
104.1
0.3
10.89

and
104.1
104.4
0.3
6.09

and
104.4
104.7
0.3
30.99
TGC-0149

117.0
117.3
0.3
4.72
TGC-0153

103.0
103.9
0.9
3.11

including
103.0
103.3
0.3
3.83

and
103.3
103.6
0.3
0.59

and
103.6
103.9
0.3
4.90
TGC-0155

24.3
24.9
0.6
3.94

including
24.3
24.6
0.3
4.85

and
24.6
24.9
0.3
3.02
TGC-0155

50.4
50.7
0.3
6.91
TGC-0155

53.4
53.7
0.3
4.52
TGC-0155

57.3
58.2
0.9
5.99

including
57.3
57.6
0.3
9.41

and
57.6
57.9
0.3
3.84

and
57.9
58.2
0.3
4.72
TGC-0155

92.7
93.3
0.6
28.27

including
92.7
93.0
0.3
28.99

and
93.0
93.3
0.3
27.54
TGC-0155

105.0
105.3
0.3
7.91
TGC-0159

84.2
84.5
0.3
5.56
TGC-0159

86.0
87.2
1.2
8.51

including
86.0
86.3
0.3
12.67

and
86.3
86.6
0.3
4.64

and
86.6
86.9
0.3
10.25

and
86.9
87.2
0.3
6.47
TGC-0159

90.2
90.8
0.6
11.92

including
90.2
90.5
0.3
15.05

and
90.5
90.8
0.3
8.79
TGC-0159

92.6
93.5
0.9
3.21

including
92.6
92.9
0.3
4.10

and
92.9
93.2
0.3
<0.01

and
93.2
93.5
0.3
5.54
TGC-0159

101.0
101.3
0.3
32.52
TGC-0161

94.2
96.0
1.8
14.53

including
94.2
94.5
0.3
4.89

and
94.5
94.8
0.3
18.66

and
94.8
95.1
0.3
23.78

and
95.1
95.4
0.3
9.53

and
95.4
95.7
0.3
15.36

and
95.7
96.0
0.3
14.98
TGC-0163

24.9
26.1
1.2
393.01

including
24.9
25.2
0.3
3.40

and
25.2
25.5
0.3
0.07

and
25.5
25.8
0.3
<0.01

and
25.8
26.1
0.3
1568.55
TGC-0163

36.9
37.2
0.3
3.15
TGC-0163

45.0
45.3
0.3
3.91
TGC-0163

90.9
91.2
0.3
4.20
TGC-0163

93.3
93.6
0.3
6.02
TGC-0163

100.5
100.8
0.3
6.30
TGC-0163

104.1
104.4
0.3
4.74
TGC-0163

106.8
107.1
0.3
21.23
TGC-0164

100.5
102.9
2.4
11.95

including
100.5
100.8
0.3
4.59

and
100.8
101.1
0.3
10.68

and
101.1
101.4
0.3
5.15

and
101.4
101.7
0.3
6.60

and
101.7
102.0
0.3
25.77

and
102.0
102.3
0.3
5.19

and
102.3
102.6
0.3
30.31

and
102.6
102.9
0.3
7.30
TGC-0166

103.7
106.4
2.7
9.64

including
103.7
104.0
0.3
5.16

and
104.0
104.3
0.3
30.56

and
104.3
104.6
0.3
35.63

and
104.6
104.9
0.3
3.25

and
104.9
105.2
0.3
2.26

and
105.2
105.8
0.6
1.53

and
105.8
106.4
0.6
3.40
TGC-0167

49.5
53.2
3.7
6.43

including
49.5
49.8
0.3
4.23

and
49.8
50.1
0.3
19.96

and
50.1
50.4
0.3
5.91

and
50.4
50.7
0.3
18.69

and
50.7
51.0
0.3
3.30

and
51.0
51.3
0.3
<0.01

and
51.3
51.6
0.3
0.04

and
51.6
51.9
0.3
21.50

and
51.9
52.2
0.3
0.30

and
52.2
52.5
0.3
0.05

and
52.5
52.8
0.3
1.13

and
52.8
53.2
0.4
3.12
TGC-0167

94.1
94.7
0.6
15.94

including
94.1
94.4
0.3
6.24

and
94.4
94.7
0.3
25.63
TGC-0167

96.6
96.9
0.3
3.87
TGC-0167

98.8
99.1
0.3
41.89
TGC-0167

109.3
110.2
0.9
9.56

including
109.3
109.6
0.3
4.53

and
109.6
109.9
0.3
13.39

and
109.9
110.2
0.3
10.76
TGC-0167
and
118.3
118.6
0.3
10.05
TGC-0169

106.8
108.6
1.8
5.41

including
106.8
107.4
0.6
6.35

and
107.4
108.0
0.6
<0.01

and
108.0
108.6
0.6
9.87
TGC-0169

109.8
112.8
3.0
3.27

including
109.8
110.4
0.6
3.50

and
110.4
110.7
0.3
3.99

and
110.7
111.3
0.6
0.65

and
111.3
111.6
0.3
9.14

and
111.6
111.9
0.3
0.16

and
111.9
112.5
0.6
3.79

and
112.5
112.8
0.3
3.53
TGC-0171

87.3
87.6
0.3
20.20
TGC-0171

90.0
90.6
0.6
7.01

including
90.0
90.3
0.3
8.67

and
90.3
90.6
0.3
5.35
TGC-0171

91.8
92.1
0.3
11.75
TGC-0171

99.0
99.3
0.3
3.12
TGC-0171

103.2
107.1
3.9
14.98

including
103.2
103.5
0.3
5.07

and
103.5
103.8
0.3
0.25

and
103.8
104.1
0.3
9.90

and
104.1
104.4
0.3
4.80

and
104.4
104.7
0.3
0.27

and
104.7
105.0
0.3
0.37

and
105.0
105.3
0.3
0.31

and
105.3
105.6
0.3
5.97

and
105.6
105.9
0.3
18.36

and
105.9
106.2
0.3
1.38

and
106.2
106.5
0.3
143.95

and
106.5
106.8
0.3
0.14

and
106.8
107.1
0.3
4.01
TGC-0173

98.7
99.9
1.2
49.85

including
98.7
99.0
0.3
36.99

and
99.0
99.3
0.3
63.35

and
99.3
99.6
0.3
55.50

and
99.6
99.9
0.3
43.55
TGC-0175

41.1
41.4
0.3
4.92
TGC-0175

44.4
44.7
0.3
9.89
TGC-0178

28.2
28.5
0.3
4.32
TGC-0178

57.9
58.2
0.3
4.08
TGC-0178

97.5
98.1
0.6
24.07

including
97.5
97.8
0.3
15.99

and
97.8
98.1
0.3
32.15
TGC-0178

108.6
108.9
0.3
11.42
TGC-0178

122.4
122.7
0.3
4.29
TGC-0178

127.2
127.5
0.3
5.61
TGC-0179

101.1
102.9
1.8
26.59

including
101.1
101.7
0.6
15.32

and
101.7
102.0
0.3
9.13

and
102.0
102.6
0.6
14.46

and
102.6
102.9
0.3
90.85
TGC-0180

105.7
106.3
0.6
8.43

including
105.7
106.0
0.3
3.07

and
106.0
106.3
0.3
13.78
TGC-0181

21.6
22.2
0.6
3.49
TGC-0181

34.2
36.6
2.4
5.40

including
34.2
34.5
0.3
3.05

and
34.5
34.8
0.3
0.78

and
34.8
35.4
0.6
6.12

and
35.4
36.0
0.6
8.23

and
36.0
36.6
0.6
5.34
TGC-0181

57.0
58.2
1.2
20.10

including
57.0
57.6
0.6
27.48

and
57.6
58.2
0.6
12.72
TGC-0181

60.0
60.9
0.9
47.11

including
60.0
60.6
0.6
3.33

and
60.6
60.9
0.3
134.68
TGC-0181

88.5
89.1
0.6
3.76
TGC-0181

105.0
106.2
1.2
6.39

including
105.0
105.6
0.6
3.15

and
105.6
105.9
0.3
3.99

and
105.9
106.2
0.3
15.25
TGC-0181

124.8
125.4
0.6
4.09
TUDDH-702

102.2
103.1
0.9
23.19
TUDDH-702

125.6
126.8
1.2
11.45

including
125.6
126.2
0.6
7.92

and
126.2
126.8
0.6
14.98
TUDDH-702

229.3
229.9
0.6
3.89
TUDDH-705

43.4
44.6
1.2
10.47
TUDDH-705

154.7
155.0
0.3
4.67
TUDDH-705

228.0
228.6
0.6
3.74
TUDDH-705

258.9
260.1
1.2
4.88

including
258.9
259.5
0.6
4.07

and
259.5
260.1
0.6
5.69
TUDDH-705

263.4
263.7
0.3
3.05
TUDDH-709

234.8
235.1
0.3
6.36
TUDDH-709

247.1
247.7
0.6
3.23
TUDDH-709

252.2
252.8
0.6
215.86
TUDDH-714

161.1
161.4
0.3
24.09
TUDDH-714

180.8
182.3
1.5
9.08

including
180.8
181.1
0.3
21.89

and
181.1
182.0
0.9
<0.01

and
182.0
182.3
0.3
23.52
TUDDH-714

241.7
243.8
2.1
12.02

including
241.7
242.3
0.6
6.12

and
242.3
243.2
0.9
7.95

and
243.2
243.8
0.6
24.02
TUDDH-718

182.4
183.0
0.6
3.11
TUDDH-718

226.2
226.5
0.3
57.36
TUDDH-718

249.9
254.4
4.5
9.79

including
249.9
250.5
0.6
4.81

and
250.5
251.1
0.6
15.89

and
251.1
251.4
0.3
0.88

and
251.4
252.0
0.6
20.03

and
252.0
252.6
0.6
21.22

and
252.6
253.2
0.6
2.77

and
253.2
253.8
0.6
6.63

and
253.8
254.1
0.3
-0.01

and
254.1
254.4
0.3
3.29
TUDDH-718

256.5
257.1
0.6
3.51
TUDDH-718

262.2
262.8
0.6
6.19
TUDDH-718

264.9
265.5
0.6
7.73
TUDDH-718

267.9
270.0
2.1
12.73

including
267.9
268.5
0.6
31.96

and
268.5
269.1
0.6
6.24

and
269.1
270.0
0.9
4.23

 

To view the source version of this press release, please visit https://www.newsfilecorp.com/release/211748

Stock Information

Company Name: Lion One Metals Limited
Stock Symbol: LIO:CC
Market: TSXVC
Website: liononemetals.com

Menu

LIO:CC LIO:CC Quote LIO:CC Short LIO:CC News LIO:CC Articles LIO:CC Message Board
Get LIO:CC Alerts

News, Short Squeeze, Breakout and More Instantly...