Twitter

Link your Twitter Account to Market Wire News


When you linking your Twitter Account Market Wire News Trending Stocks news and your Portfolio Stocks News will automatically tweet from your Twitter account.


Be alerted of any news about your stocks and see what other stocks are trending.



home / news releases / MNDJF - Mandalay Resources Corporation Provides Exploration Update And Announces Early Success of the Brown's Prospect Drilling Program at Costerfield


MNDJF - Mandalay Resources Corporation Provides Exploration Update And Announces Early Success of the Brown's Prospect Drilling Program at Costerfield

TORONTO, June 22, 2020 (GLOBE NEWSWIRE) -- Mandalay Resources Corporation ("Mandalay" or the "Company") (TSX: MND, OTCQB: MNDJF) is pleased to report on the initial encouraging results of its regional testing programs and high-grade resource extensions in both the Youle and Aurora ore bodies at its Costerfield operation in Victoria, Australia, and its Björkdal operation in Skellefteå, Sweden, respectively.

Exploration Highlights

Costerfield

  • Early success in regional drilling program with significant intercepts in first drill hole into Brown’s prospect:
    • 14.5 g/t gold, over a true width of 1.27 m and 23.5 g/t gold over a true width of 0.12 m in BWN001 (first hole in the testing program)
  • The high-grade Youle ore body extends to the north with substantial grades intercepted:
    • 21.7 g/t gold and 1.7% antimony over a true width of 1.23 m in BC099; and
    • 44.3 g/t gold and 26.3% antimony over a true width of 1.07 m in BC100
  • Commencement of second Costerfield deeps hole with results expected in August.

Björkdal

  • Drilling results show high-grade extension at depth in Aurora with additional extension potential to the east:
    • 9.7 g/t gold over a true width of 4.31 m in MU20-011; and
    • 2.5 g/t gold over a true width of 7.21 m in MU20-018
  • Northern drilling has intercepted three zones exhibiting high-grade intercepts:
    • 26.9 g/t gold over a true width of 0.61 m in MU20-001; and
    • 2.5 g/t gold over a true width of 2.09 m in MU20-002

Dominic Duffy, President and Chief Executive Officer of Mandalay, commented, “We are pleased to report continued exploration success at both of our sites. The most recent drilling results at Costerfield and Björkdal confirm the significant upside potential value of our operations. Despite the ongoing COVID-19 pandemic, we have been able to increase our drilling while protecting our staff and contractors with strict risk mitigation protocols.”

Mr. Duffy added, “At Costerfield, we are excited by the early success in our regional testing programs which have targeted parallel lines of historically mined gold reefs. The first hole drilled into the Brown’s prospect, which is 2.3 km east from our high-grade Youle mine, returned a highly significant intersection of high-grade gold, along with encouraging intercepts on parallel veins. We also encountered encouraging early intercepts within the True Blue line. This intercept strengthens our vision of a long term, high performing asset in this rich central Victorian field. These drilling programs are still in their infancy and Mandalay is committed to continuing and accelerating drilling where needed in order to understand their full potential.”

Mr. Duffy continued, “As we continue to extract excellent grades from the Youle ore body we have also had success in our near-mine drilling program extending strike to the north with characteristically high-grade mineralization intercepted along structure. We have also enjoyed the encouraging intercepts returned from our Aurora extension drilling program at Björkdal. Grades we are seeing at depth are comparable to the highest we have seen at Björkdal with strike extension drilling also showing high-grade results to the east.”

Mr. Duffy continued, “Whilst the Aurora deposit grows at Björkdal, we continue to drill to the north with aims to secure additional, parallel and high-grade veining. This program has continued to deliver towards this goal with three zones of veining intercepted at significant grades. The realization of stacked Aurora-like systems is of great importance to the mining operations at Björkdal and could allow a step change in high-grade ore extraction rates in the future.”

Mr. Duffy concluded, “Along with this exploration update, we have posted on our website a video prepared by Mr. Chris Davis, Vice President of Operational Geology and Exploration, explaining the updates for both sites. I invite you all to click here to view.”

Mandalay Resources Exploration Update June 2020: https://www.globenewswire.com/NewsRoom/AttachmentNg/528007cd-8893-40af-a148-fd3ba7ba7eaa

Costerfield Drilling Programs

Since our last update in January 2020, Mandalay has increased drilling rates on the Youle extension program and started the already successful regional resting programs. The anticipated second deep drill hole underneath the central Costerfield system has also commenced.

Youle Optimisation and Extension Drilling Results

Mandalay’s Youle development has continued with exceptional gold and antimony grades being realised. 12 active headings have advanced along the veining, with strike extents between 240 – 290 m achieved in line with geological interpretation and expected grades. Additionally, 63 optimisation and extension diamond drill holes, totalling 7,667 m of oriented diamond drill core, have increased confidence in Mandalay’s mining schedule and strike extension for the area. Further testing and bounding drilling is planned as optimised underground drill sites continue to become available with active underground development.

Recent production optimisation drilling has been focused on delineating the extents of the Youle system whilst navigating the locally complex system. The program has added significant value by adding detail to a comprehensive model on which sound scheduling and viability decisions are made. Major gold and antimony grades have been intercepted in these holes, including 61.7 g/t gold (“Au”) and 15.0% antimony (“Sb”) over a true width of 1.77 m in hole KD624 and 139 g/t Au and  51.8% Sb over a true width of 0.47 m in hole KD619 (Figure 1). Further highlighted results from the drilling program can be found in Table 1.

Figure 1. Longitudinal section of Youle illustrating the location of recent Youle extension and optimization intercepts in close proximity to current workings.
ttps://www.globenewswire.com/NewsRoom/AttachmentNg/e0fc1801-998a-4f9e-89dc-ffee87ee2f5d

Table 1. Production Optimization Drilling Highlights

Drill
Hole ID
Drill
Width
(m)
True
Width
Au Grade
(g/t)
Sb Grade
(%)
AuEq
(g/t)
AuEq (g/t) over
min. 1.8 m
mining width
KD597
0.46
0.21
44.5
5.4
51.7
6.0
KD599
4.63
4.40
2.5
2.7
6.1
6.1
KD608
0.34
0.30
61.5
7.6
71.6
11.8
KD609
1.21
1.11
11.7
3.9
16.9
10.5
KD615
0.31
0.22
54.2
44.0
112.8
13.5
KD619
0.55
0.47
139.0
51.8
208.0
53.9
KD622A
1.4
1.07
24.7
3.5
29.3
17.5
KD623
2.5
1.92
20.7
17.6
44.1
44.1
KD624
2.31
1.77
61.7
15.0
81.7
80.3
Including
0.26
0.20
280.0
37.9
330.5
36.6
KD625
0.57
0.42
173.7
10.3
187.4
44.1
KD625
1.59
1.44
28.2
16.2
49.8
39.9
KD639
1.4
1.06
30.7
8.0
41.3
24.3
KD640
0.27
0.26
104.0
17.3
127.0
18.0
KD641
0.48
0.31
44.4
14.2
63.3
11.1
KD673
1.2
0.85
1.2
13.3
19.0
8.9
KD675
0.2
0.14
80.1
46.5
142.0
11.4
KD676
0.6
0.30
211.0
34.6
257.1
42.8
KD676
0.73
0.42
39.1
8.2
50.0
11.6
KD677
0.26
0.24
31.5
30.8
72.5
9.7
KD684
1.53
1.10
6.1
4.8
12.5
7.6
KD685
1.1
0.46
46.6
45.8
107.5
27.8
KD687
1.35
1.11
39.6
19.2
65.2
40.1
Including
0.1
0.08
162.0
51.1
230.0
10.5
KD688
2.56
1.96
4.7
4.5
10.7
10.7
KD689
0.9
0.09
62.8
41.3
117.8
6.2
KD699
0.14
0.11
58.4
23.5
89.7
5.3
KD702
1.37
1.02
4.1
6.0
12.1
6.8

Notes
1.     The AuEq (gold equivalent) grade is calculated using the following formula:

AuEq g per t = Au g per t + Sb% x
 Au price per g x Au processing recovery
 
Sb price per 10kg x Sb processing recovery 
 

Figures used: Au $/oz = 1478, Sb $/t = 5931 Au Recovery = 89.3% and Sb Recovery = 95.3%.
2. Where the true width of the composite is greater than 1.8m the diluted AuEq g/t is not diluted.
3. Intercepts listed in the above table are highlights. The full table can be found in Appendix A.

With additional capital development opening up underground drill sites, exploration drilling at Youle has continued to build on the mineralized extents of the ore-body. Youle exploration highlights identified significant mineralization to the north in BC099 (21.7 g/t Au and 1.7% Sb over a true width of 1.23 m including 0.1 m true width at 263 g/t Au and 15% Sb), as well as BC100 (44.3 g/t Au and 26.6% Sb over a true width of 1.07 m). Further significant southern zones were defined down-dip in BC083, which intercepted 49.8 g/t Au and 27.8% Sb at a true width of 0.37 m (Table 2). These results have extended the mine plan in the lower southern portion of the mine and to the north by upwards of 70 m.

Figure 2. Longitudinal Section and Plan Section of Youle illustrating the location of recent exploration intercepts with detail against the Youle Extension intercepts.
https://www.globenewswire.com/NewsRoom/AttachmentNg/caeed020-1a34-4b6e-9128-083bb1a2a11b

Table 2. Youle Extension Highlights

Drill Hole
ID
Drill
Width
(m)
True Width
(m)
Au Grade
(g/t)
Sb Grade
(%)
AuEq
(g/t)
AuEq (g/t) over
min. 1.8m mining
width
BC083
0.51
0.37
49.8
27.8
86.8
18.0
BC084W1
0.65
0.51
21.6
0.3
22.0
6.3
BC099
1.74
1.23
21.7
1.7
24.0
16.4
Including
0.14
0.10
263.0
15.0
283.0
15.6
BC100
1.18
1.07
44.3
26.6
79.7
47.4

Note
1.     The AuEq (gold equivalent) grade is calculated using the following formula:

AuEq g per t = Au g per t + Sb% x 
Au price per g x Au processing recovery
Sb price per 10kg x Sb processing recovery

Figures used: Au $/oz = 1478, Sb $/t = 5931 Au Recovery = 89.3% and Sb Recovery = 95.3%.
2.     Intercepts listed in the above table are highlights. The full table can be found in Appendix A.

Costerfield Regional Testing

A series of short diamond testing programs have been designed and executed with the intent of testing potentials around Costerfield that will add significant growth to the life of the operation.

Early success at the Brown’s prospect includes encouraging results in True Blue and Robinson’s Prospects.

Figure 3. Map of the regional testing programs
https://www.globenewswire.com/NewsRoom/AttachmentNg/d9ac7212-7da2-429c-ac37-d7a3b884001a

Brown’s Prospect

Following a review of historic literature and comprehensive surface mapping of the area, Mandalay began a diamond drilling program targeting both the Brown’s and Robinson’s prospects in May 2020 (Figure 3). The Brown’s drilling program is still underway with only two out of five holes completed (total of 623 m has been drilled of the 1,200 m program). The first drill hole intercepted 14.51 g/t Au, over 1.27 m (true width) in diamond drill hole BWN001. Both BWN001 & BWN002 (Figures 4 & 5) were drilled below the historic Felix Brown mine.

Assays for two (BWN001 & BWN002) drill holes have been returned. Below are the significant assays along with their intervals. The main Brown’s reef intercept in BWN001 consists of a multi-generation breccia, containing free gold, and a small amount of pyrite and trace sphalerite. Two main lines of mineralization have been interpreted at Brown’s, which are hosted by a large north-south orientated anticline, which is broadly continuous for several hundred meters, situated east of the well-known Costerfield anticline.

Figure 4: Plan Section illustrating drill hole trace for BWN001 & BWN002 in relation to historic Felix Brown mine and mapped surface reefs in the Brown’s Program.
https://www.globenewswire.com/NewsRoom/AttachmentNg/ed986c23-675d-4ec0-91e6-fbb1456c2cd7

Table 3. Significant intercepts of the Browns Testing Drilling Program

Drill Hole
ID
Drill
Width
(m)
True Width
(m)
Au Grade
(g/t)
Sb Grade
(%)
AuEq
(g/t)
AuEq (g/t) over
min. 1.8
m mining
width
BWN001
2.21
1.27
14.5
0.0
14.5
10.2
BWN001
1.42
0.91
5.4
1.6
7.6
3.9
Including
0.19
0.12
23.2
0.2
23.5
1.6
BWN002
1.49
0.88
3.3
0.1
3.4
1.7
BWN002
1.96
1.36
0.98
0.62
1.8
1.4

Note
1.     The AuEq (gold equivalent) grade is calculated using the following formula:

AuEq g per t = Au g per t + Sb% x 
Au price per g x Au processing recovery
Sb price per 10kg x Sb processing recovery

Figures used: Au $/oz = 1478, Sb $/t = 5931 Au Recovery = 89.3% and Sb Recovery = 95.3%.
2.     Intercepts listed in the above table are highlights. The full table can be found in Appendix B.

The intercepts gained in BWN001 & BWN002, provide the first step in proving the down-dip continuity of the extensive surface mineralization and the reef worked in the Felix Brown mine. Similar quartz-pyrite-gold breccias similarly occur within the Cuffley and Brunswick veins in the Augusta mine which may have positive implications for the nature of the mineralized vein structures at depth.

Figure 5: Cross Section illustrating interpretation from the first 2 holes drilled so far in the Brown’s Program.
https://www.globenewswire.com/NewsRoom/AttachmentNg/266aeb4b-57f5-420f-ba26-eaebd1480925

Robinson’s Prospect

To the south of the Brown Prospect, three holes totalling 636 m have been drilled out of a five-hole, (900 m) program into the Robinson prospect (Figures 6 & 7). Assays for the most prospective samples have been returned with the most significant intercept recovered on the historically named Cochrane’s reef (RB002, 2.7 g/t Au and 0.4% Sb over a true width of 1.42 m).

Diamond drilling thus far, has confirmed that the geology of Robinson’s and Cochrane’s reefs is very similar to Brown’s prospect. The reefs are situated in the hinge zone of a large anticline, folding silty sandstone-dominated Wapentake Formation turbidites. In drill core, the mineralized structures are found to be quartz-cemented breccias with dispersed pyrite and silica flooding of the included wallrock clasts. In RB001, the intersection of Robinson’s reef was not found to be significantly mineralized and in light of subsequent intercepts of the nearby Cochranes reef appears to be significantly affected by late faulting, causing a blank in mineralization. Where the mineralized structures have been intercepted in the weathered zone (eg, Cochrane’s Reef in RB002), the vein carries a visibly yellowish hue characteristic of decayed sulfides and synonymous with gold mineralization within the district.

Figure 6: Plan Section illustrating drill hole trace for RB001, RB002 and RB003 in relation to historic Robinson’s shaft  and  Robinsons and Cochranes’s surface reefs.
https://www.globenewswire.com/NewsRoom/AttachmentNg/69accc9e-61dc-4d70-a410-7fbc5dfd413c

Table 4. Significant intercepts of the Robinson Testing Drilling Program.

Drill Hole ID
Drill Width (m)
True Width (m)
Au Grade (g/t)
Sb Grade (%)
AuEq (g/t)
AuEq (g/t) over min. 1.8 m mining width
RB002
2.92
1.42
2.7
0.4
3.3
2.6
RB003
2.22
1.70
1.4
0.1
1.4
1.4

Note
1.     The AuEq (gold equivalent) grade is calculated using the following formula:

AuEq g per t = Au g per t + Sb% x
Au price per g x Au processing recovery
Sb price per 10kg x Sb processing recovery

Figures used: Au $/oz = 1478, Sb $/t = 5931 Au Recovery = 89.3% and Sb Recovery = 95.3%.
2.     Intercepts listed in the above table are highlights. The full table can be found in Appendix B.

Figure 7. Cross Section illustrating interpretation from the first 2 holes drilled so far in the Robinson’s Program.
https://www.globenewswire.com/NewsRoom/AttachmentNg/25d4ee84-37d9-4895-a54b-bbc52cb61d31

The confirmation that Brown’s and Robinson’s prospects share a common geological setting, and the interpretation of both prospects lying on the same large-scale structure along strike opens up the possibility of additional undiscovered mineralization under the wide alluvial cover of Sandy Creek which runs between the two areas.

True Blue Testing

The first phase of Costerfield’s True Blue Regional testing commenced mid-March, with the first two (623 m) of five holes completed. Lying 2.2 km west of the Youle and Brunswick mine workings (Figure 3) the True Blue Prospect is targeting several lines of the historic True Blue line of workings.

Mandalay drilled a single hole (TB01) beneath the northern end of the old mine in 2010 and intercepted low-tenor quartz-stibnite veining in heavily faulted ground (Figure 8). Auger-sampled bedrock geochemistry in the area undertaken in 2014, also revealed a large antimony-gold anomaly extending under alluvial cover to the south of the old workings.

Following a review of historic literature, previous diamond and auger drilling programs and intensive surface mapping; two major fault systems have been identified – the Malbec and Merlot faults. The first phase of drilling is testing the down dip extension of the True Blue shaft and the previously identified geochemical anomaly. The first drill hole, TB002, successfully tested the down dip extension of the Malbec fault, below the True blue mine and returned 5.8 g/t Au, and 14.2% Sb over 0.13 m (true width). TB003 tested the down dip continuation of the Merlot fault, also successfully identified mineralization of 2.1 g/t Au over a true width of 0.3 m and 1.5 g/t Au over 1.5 m (true width) in the Merlot splay fault (Figures 8 & 9).

Figure 8: Plan Section illustrating drill hole trace for TB002 & TB003 in relation to historic Merlot and Malbec faults.
https://www.globenewswire.com/NewsRoom/AttachmentNg/423d39c3-6598-40ce-a9e3-635bddca49c1

Table 5. Significant intercepts of the True Blue Testing Drilling Program

Drill Hole ID
Drill Width (m)
True Width (m)
Au Grade (g/t)
Sb Grade (%)
AuEq (g/t)
AuEq (g/t) over min. 1.8 m mining width
TB002
0.14
0.13
5.8
14.2
24.7
1.8
TB003
1.65
1.52
1.5
0.0
1.5
1.3

Note
1.     The AuEq (gold equivalent) grade is calculated using the following formula:

AuEq g per t = Au g per t + Sb% x 
Au price per g x Au processing recovery
Sb price per 10kg x Sb processing recovery

Figures used: Au $/oz = 1478, Sb $/t = 5931 Au Recovery = 89.3% and Sb Recovery = 95.3%

2.     Intercepts listed in the above table are highlights. The full table can be found in Appendix B.

Figure 9. Cross Section illustrating interpretation so far in the True Blue Program.
https://www.globenewswire.com/NewsRoom/AttachmentNg/979b5532-1d9a-4a0d-9ea3-d9125571d9b7

Costerfield Deeps Program

In late March 2020, the second hole of the Costerfield Deeps Program; CD002 commenced drilling. The aim of this hole is to investigate a highly prospective block located at depth below the Augusta-Cuffley portion of Costerfield’s mine. This mineralized zone was first identified in the 2015 – 2016 sub-King Cobra Fault drilling campaign, during which high grade nuggety gold-bearing veins were intercepted in the tail portions of the then deepest holes in the district. CD002 was advanced to 1,043 m by early June, and is not yet entered the anticipated target zone. It is expected that this diamond drill hole and the wedge daughter hole will be completed in August 2020.

Björkdal Drilling Programs

Since our last update in January 2020, Mandalay has continued to focus on the lateral and vertical extensions of the Aurora zone, as well as the further investigation into the progression of the mineralized package to the North of current operations. Furthermore, an additional extensional program was completed in January 2020, targeted at the down dip extension of skarn mineralization observed in the open pit.

West Pit Skarn Extension

During the last quarter of 2019 and the first quarter of 2020, Mandalay completed a surface drilling campaign, totalling 10 diamond drill holes for 1,544 m. The aim of this program was to investigate the down-dip continuation of mineralized skarnification observed in the open-pit. The drilling successfully demonstrated that the skarnification continues down-dip from the pit and above the current underground infrastructure. The resultant grade within the skarnification was relatively low, however, high-grade veining (43 g/t Au over 1.02 m) was intercepted below the marble horizon. Further follow up work will be required in this area.

Table 6. Significant intercepts of the West Pit Skarn Extension Program

Hole id
Drilled
True
Au
Width (m)
Width (m)
Grade (g/t)
MP9-002
1.2
1.02
43.0
MP9-002
0.6
0.49
17.2
MP9-003
0.85
0.71
25.8

Note: intercepts listed in the above table are highlights. The full table can be found in Appendix C.

Figure 12. Cross section of Björkdal Mine Area Showing the Location of the Northern Extension Intercepts.
https://www.globenewswire.com/NewsRoom/AttachmentNg/41c3320a-3a74-4d7b-8f69-a9d2b83e1de1

Figure 13. Cross section of Björkdal Mine Area Showing the Location of the West pit Skarn Extension intercepts.
https://www.globenewswire.com/NewsRoom/AttachmentNg/3ec8a109-a6e5-4c03-995d-312ff2e392c5

Aurora Extension and Delineation

Since Mandalay’s last exploration update, our understanding of the Aurora system has been augmented by 13 extensional drill holes (3,877 m of diamond core) and 24 Development Optimisation Drill (DOD) holes (further 4,230 m of diamond core). Underground drilling to the east and at depth has excitingly intercepted high grades including 9.7g/t Au over 4.3 m in MU20-011 and 14.5 g/t Au over 1.07 m in MU20-009A. These holes have confirmed the existence of a structurally controlled, high-grade zone plunging towards the northeast. The up-dip extension of the zone revealed mixed results with extension to the veining intercepted at shallower depths with lower grades. An exception is ME20-005, which returned grades along Aurora at 1.55 g/t Au gold over 4.3 m to the upper east. Extension drilling towards the east is currently being planned in addition to the four remaining holes within the extension program.

Table 7. Significant intercepts of the Aurora Extension Drilling Program

Hole id
Drilled
Width (m)
True
Width (m)
Au
Grade (g/t)
MU20-009A
11.05
3.35
1.9
MU20-011
7.25
4.31
9.7
MU20-018
8.85
7.21
2.5

Note: intercepts listed in the above table are highlights. The full table can be found in Appendix D.

Figure 14. Björkdal Mine Scale Overview Map Showing the Location of the Aurora Zone and the Northern target test drilling in relation to mine development. Below Cross section are denoted with A-A’ (Aurora Longitudinal Section) and B-B’ (Northern Extension Cross Section).
https://www.globenewswire.com/NewsRoom/AttachmentNg/2a550d63-3c13-4ba3-b106-2ee06ec2b2bd

Figure 15. Longitudinal Section of the Aurora Zone, Looking North, Illustrating Location of Recent Intercepts.
https://www.globenewswire.com/NewsRoom/AttachmentNg/7f030662-b320-4178-b894-6944b5cc3af0

Northern Extension

The Björkdal gold deposit is a lode-style, sheeted vein deposit hosted within the upper portions of the Skellefte Group metavolcanics/volcaniclastics. The veining is locally structurally complex, with many cross-veining features observed and thin mineralized quartz veinlets in the wall rocks proximal to the main quartz veins. The main portion of gold mineralization historically lays below and within the Marble horizon. The Aurora system and surrounding veins uncharacteristically exists above the marble extending up dip for hundreds of meters and, as previously stated, is open to the east and down plunge.

The northern extension drilling is continuing to intercept high grade within Aurora style mineralization along multiple horizons, again sitting above the marble, to the north. Underground drilling in this area has been carried out intermittently since 2016 however, with the establishment of Aurora, this northern extension drilling has become a consistent and highly encouraging program.

A total of three diamond drill holes have been drilled into the area during 2020 to date, totalling 1,768 m. Three additional 600 m holes are planned to be drilled to complete this program. To date the drill spacing in the region is >70 m, however, a number of auriferous veins can now be traced over an approximate 200 m strike length. Although the program is still relatively in its infancy 3 zones of mineralization are becoming apparent with grades, such as 26.9 g/t Au over 0.61 m in MU20-001.

Table 8. Significant intercepts of the Northern Extension Drilling Program.

Hole id
Drilled
Width (m)
True
Width (m)
Au
Grade (g/t)
Au (g/t) over min. 3 m
mining width
MU20-001
0.85
0.61
26.9
5.5
MU20-002
2.45
2.09
2.5
1.8

Note: intercepts listed in the above table are highlights. The full table can be found in Appendix E.

Figure 16. Cross section of Björkdal Mine Area Showing the Location of the Northern Extension Intercepts.
https://www.globenewswire.com/NewsRoom/AttachmentNg/4ca7aead-4604-4baf-88d5-d51786c7bc8d

Drilling and Assaying

At Costerfield, diamond drill core was logged and sampled by Costerfield geologists. All samples were sent to OnSite Laboratory Services in Bendigo, Victoria, Australia, for sample preparation and assay. Site geological and metallurgical personnel have implemented a QA/QC process that includes the regular submission of standard reference materials and blanks with drill and face samples submitted for assay. Standard reference materials have been certified by Geostats Pty Ltd. For further details please refer to the March 30, 2020 Technical Report entitled “Costerfield Operation, Victoria, Australia NI 43-101 Report”, available on SEDAR (www.sedar.com), which contains a complete description of drilling, sampling, and assaying procedures.

At Björkdal, all diamond drill core was logged and sampled by Björkdal geologists. Exploration drill hole samples (prefix MU) were sent to CRS Minlab Oy (CRS) in Kempele, Finland for sample preparation and assaying. Development Optimization drill hole samples (prefix DOD) were at the onsite lab ran by ALS for sample preparation and assaying. For further details please refer to the March 30, 2020 Technical Report entitled “Technical Report on the Björkdal Gold Mine, Sweden”, available on SEDAR (www.sedar.com), which contains a complete description of drilling, sampling, and assaying procedures.

Assaying in both the CRS and ALS laboratories was conducted utilizing the Pal1000 (CRS) cyanide leaching processes. Mandalay’s rigorous QA/QC program included the use of standard reference samples, blanks, duplicates, repeats, and internal laboratory quality assurance procedures.

Qualified Person:

Chris Davis, Vice President of Operational Geology and Exploration at Mandalay Resources, is a Charted Professional of the Australian Institute of Mining and Metallurgy (MAusIMM CP(Geo)), and a Qualified Person as defined by NI 43-101. He has reviewed and approved the technical and scientific information provided in this release.

For Further Information

Dominic Duffy
President and Chief Executive Officer

Edison Nguyen
Manager, Analytics and Investor Relations

Contact:
647.260.1566

About Mandalay Resources Corporation

Mandalay Resources is a Canadian-based natural resource company with producing assets in Australia and Sweden, and care and maintenance and development projects in Chile. The Company is focused on growing production at its gold and antimony operation in Australia, and gold production from its operation in Sweden to generate near term cash flow.

Forward-Looking Statements:

This news release contains "forward-looking statements" within the meaning of applicable securities laws, including statements regarding the exploration and development potential of the Youle deposit (Costerfield) and the Aurora Zone (Björkdal). Readers are cautioned not to place undue reliance on forward-looking statements. Actual results and developments may differ materially from those contemplated by these statements depending on, among other things, changes in commodity prices and general market and economic conditions. The factors identified above are not intended to represent a complete list of the factors that could affect Mandalay. A description of additional risks that could result in actual results and developments differing from those contemplated by forward-looking statements in this news release can be found under the heading “Risk Factors” in Mandalay’s annual information form dated March 30, 2020, a copy of which is available under Mandalay’s profile at www.sedar.com. In addition, there can be no assurance that any inferred resources that are discovered as a result of additional drilling will ever be upgraded to proven or probable reserves. Although Mandalay has attempted to identify important factors that could cause actual actions, events or results to differ materially from those described in forward-looking statements, there may be other factors that cause actions, events or results not to be as anticipated, estimated or intended. There can be no assurance that forward-looking statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward-looking statements.

Appendix A. Costerfield - Youle Extension and Production Optimisation Drilling Result

Hole ID
Hole Completion Date
Total Hole Depth
Intercept Easting (Mine Grid)
Intercept Northing (Mine Grid)
Intercept Elevation (Mine Grid)
Drill Width (m)
True Width
Au Grade (g/t)
Sb Grade (%)
AuEq. (g/t)
AuEq (g/t) over min. 1.8 m mining width
Sampled Structure
BC081
14/01/2020
130.6
15345
6809
899
0.16
0.15
14.1
11.6
29.5
2.5
Youle
BC082
16/01/2020
175.5
15273
6794
833
0.37
0.27
7.5
16.3
29.2
4.3
Youle
BC083
23/02/2020
171.0
15270
6828
807
0.51
0.37
49.8
27.8
86.8
18.0
Youle
BC084W1
23/01/2020
164.9
15267
6879
784
0.65
0.51
21.6
0.3
22.0
6.3
Youle
BC085
23/01/2020
539.3
15232
6718
831
0.30
0.22
0.4
0.0
0.4
0.1
Youle
BC085
23/01/2020
539.3
15243
6722
807
0.27
0.20
3.8
1.3
5.6
0.6
Splay Vein
BC086
17/03/2020
683.9
15195
6945
693
0.20
0.19
0.0
0.0
0.0
0.0
Youle
BC090
30/01/2020
152.6
15271
6708
874
0.20
0.13
0.1
0.0
0.1
0.0
Youle
BC091
3/02/2020
185.5
15262
6672
886
0.43
0.32
0.0
0.0
0.0
0.0
Youle
BC092
4/02/2020
92.5
15334
6749
907
0.26
0.25
0.7
0.3
1.2
0.2
Youle
BC095
12/03/2020
693.7
15227
7065
638
0.43
0.31
0.2
0.0
0.2
0.0
Youle
BC098
27/04/2020
279.5
15421
7104
923
0.15
0.11
19.2
29.4
58.4
3.5
Youle
BC098
27/04/2020
279.5
15427
7107
925
0.15
0.12
0.7
6.1
8.8
0.6
Splay Vein
BC098
27/04/2020
279.5
15436
7112
927
0.16
0.12
28.4
15.9
49.6
3.4
Splay Vein
BC099
21/04/2020
314.5
15420
7139
898
1.74
1.23
21.7
1.7
24.0
16.4
Youle
Including
 
 
 
 
 
0.14
0.10
263.0
15.0
283.0
15.6
Youle
BC100
15/04/2020
306.4
15406
7111
879
1.18
1.07
44.3
26.6
79.7
47.4
Youle
BC100
15/04/2020
306.4
15411
7114
879
0.16
0.15
5.6
39.3
57.9
4.8
Splay Vein
BC102
28/04/2020
211.6
15392
7136
866
0.10
0.08
24.5
1.0
25.8
1.2
Splay Vein
BC102
28/04/2020
211.6
15401
7144
865
1.94
0.76
0.6
1.9
3.2
1.3
Youle
KD597
5/12/2019
70.0
15383
6855
919
0.46
0.21
44.5
5.4
51.7
6.0
Youle
KD599
12/12/2019
80.0
15400
6880
937
4.63
4.40
2.5
2.7
6.1
6.1
Youle + Splays
Including
 
 
 
 
 
0.14
0.13
20.6
21.1
48.7
3.6
Youle
KD604
10/12/2019
75.1
15417
6958
946
0.80
0.11
5.7
1.1
7.1
0.4
Youle
KD604
10/12/2019
75.1
15434
6953
954
0.74
0.46
14.0
4.4
19.9
5.0
Splay Vein
KD605
13/12/2019
50.7
15421
6974
937
0.11
0.11
6.8
9.0
18.8
1.1
Splay Vein
KD606
9/01/2020
69.1
15427
7002
934
0.13
0.11
2.0
1.4
3.8
0.2
Splay Vein
KD608
7/01/2020
61.7
15388
6943
890
0.34
0.30
61.5
7.6
71.6
11.8
Youle
KD609
18/12/2019
55.1
15406
6952
902
1.21
1.11
11.7
3.9
16.9
10.5
Youle
KD610
21/12/2019
50.7
15395
6962
889
0.15
0.15
46.1
6.7
55.0
4.6
Youle
KD612
14/01/2020
66.0
15410
6998
905
0.19
0.15
22.9
29.1
61.7
5.0
Youle
KD615
16/12/2019
74.1
15413
7004
920
0.31
0.22
54.2
44.0
112.8
13.5
Youle
KD615
16/12/2019
74.1
15426
7015
918
0.16
0.09
0.5
7.6
10.7
0.5
Splay Vein
KD618
17/12/2019
80.0
15405
6887
947
1.28
1.07
5.3
2.3
8.3
5.0
Youle + Splays
Including
 
 
 
 
 
0.14
0.12
30.8
9.7
43.7
2.8
Youle
KD619
18/12/2019
72.0
15405
6914
918
0.55
0.47
139.0
51.8
208.0
53.9
Youle
KD620
19/12/2019
51.7
15377
6882
903
0.32
0.22
16.7
10.6
30.8
3.7
Youle
KD621
6/01/2020
60.0
15371
6862
905
0.08
0.07
68.3
31.2
109.8
4.4
Youle
KD622A
31/01/2020
62.2
15393
6896
910
1.40
1.07
24.7
3.5
29.3
17.5
Youle
KD623
16/01/2020
64.0
15414
6938
945
2.50
1.92
20.7
17.6
44.1
44.1
Youle
KD624
30/01/2020
78.2
15416
6914
950
2.31
1.77
61.7
15.0
81.7
80.3
Youle
Including
 
 
 
 
 
0.26
0.20
280.0
37.9
330.5
36.6
Youle
KD625
7/02/2020
64.4
15409
6897
948
0.57
0.42
173.7
10.3
187.4
44.1
Splay Vein
KD625
7/02/2020
64.4
15411
6897
949
1.59
1.44
28.2
16.2
49.8
39.9
Youle
KD626
4/02/2020
32.2
15387
6793
931
0.14
0.08
0.0
0.5
0.7
0.0
Youle
KD627A
5/02/2020
35.4
15373
6793
928
0.16
0.12
0.2
1.0
1.6
0.1
Youle
KD628
11/02/2020
55.2
15379
6733
938
0.39
0.32
0.1
0.2
0.4
0.1
Youle
KD629
12/02/2020
49.5
15372
6736
934
0.51
0.49
0.2
0.0
0.2
0.1
Youle
KD632
13/02/2020
58.2
15380
6752
937
0.23
0.18
0.6
0.0
0.6
0.1
Youle
KD632
13/02/2020
58.2
15383
6752
935
0.12
0.08
0.6
9.1
12.7
0.6
Splay Vein
KD633
14/02/2020
50.0
15368
6751
929
0.38
0.36
0.3
0.1
0.4
0.1
Youle
KD639
19/02/2020
57.5
15386
6923
898
1.40
1.06
30.7
8.0
41.3
24.3
Youle
KD640
21/02/2020
44.7
15382
6951
880
0.27
0.26
104.0
17.3
127.0
18.0
Youle
KD641
20/02/2020
59.7
15372
6914
888
0.48
0.31
44.4
14.2
63.3
11.1
Youle
KD673
26/02/2020
102.0
15400
7043
915
1.20
0.85
1.2
13.3
19.0
8.9
Youle
KD674A
17/03/2020
127.1
15415
7086
901
0.32
0.16
1.6
35.5
48.9
4.3
Youle
KD675
23/03/2020
130.0
15405
7082
887
0.20
0.14
80.1
46.5
142.0
11.4
Youle
KD676
26/03/2020
104.1
15399
7049
865
0.60
0.30
211.0
34.6
257.1
42.8
Youle
KD676
26/03/2020
104.1
15405
7053
858
0.73
0.42
39.1
8.2
50.0
11.6
Splay Vein
KD677
26/02/2020
35.6
15376
6766
934
0.26
0.24
31.5
30.8
72.5
9.7
Youle
KD678
27/02/2020
39.0
15391
6771
943
0.08
0.07
22.3
14.1
41.1
1.7
Youle
KD679
2/03/2020
38.9
15377
6781
933
0.13
0.12
32.2
17.7
55.8
3.7
Youle
KD681
28/02/2020
115.4
15438
7053
925
0.11
0.08
2.9
17.7
26.5
1.2
Youle
KD682
3/03/2020
127.9
15419
7057
927
0.22
0.19
8.4
16.8
30.7
3.3
Splay Vein
KD682
3/03/2020
127.9
15446
7075
930
0.15
0.12
35.7
10.8
50.1
3.3
Youle
KD683
10/03/2020
129.0
15417
7060
918
0.17
0.07
2.7
11.8
18.4
0.8
Splay Vein
KD683
10/03/2020
129.0
15426
7066
918
0.13
0.08
3.6
16.4
25.5
1.2
Youle
KD684
30/03/2020
145.5
15421
7079
920
1.53
1.10
6.1
4.8
12.5
7.6
Youle
KD685
31/03/2020
24.0
15419
6975
942
1.10
0.46
46.6
45.8
107.5
27.8
Youle
KD686
31/03/2020
26.0
15430
6975
951
2.21
0.27
0.0
0.3
0.5
0.1
Youle
KD687
14/04/2020
100.2
15426
6984
945
1.35
1.11
39.6
19.2
65.2
40.1
Youle
Including
 
 
 
 
 
0.10
0.08
162.0
51.1
230.0
10.5
Youle
KD687
14/04/2020
100.2
15417
6987
942
0.15
0.11
15.1
32.8
58.8
3.6
Splay Vein
KD687
14/04/2020
100.2
15432
6981
947
0.57
0.15
10.4
25.5
44.4
3.6
Splay Vein
KD688
1/04/2020
39.2
15420
6811
967
1.61
1.23
4.7
1.3
6.4
4.4
Splay Vein
KD688
1/04/2020
39.2
15415
6815
964
2.56
1.96
4.7
4.5
10.7
10.7
Youle + Splays
KD689
2/04/2020
27.3
15399
6825
953
0.90
0.09
62.8
41.3
117.8
6.2
Youle
KD695
10/04/2020
37.1
15366
6771
926
0.42
0.23
0.0
0.0
0.0
0.0
Youle
KD696
20/04/2020
110.1
15440
7040
947
1.31
1.10
3.7
2.8
7.5
4.6
Youle
KD696
20/04/2020
110.1
15447
7042
949
0.63
0.22
5.1
4.6
11.2
1.3
Splay Vein
KD697
16/04/2020
100.6
15431
7016
939
0.15
0.12
1.2
1.2
2.8
0.2
Youle
KD698
21/04/2020
114.6
15416
7005
948
0.30
0.25
1.9
6.1
10.0
1.4
Youle
KD699
14/05/2020
121.1
15414
7092
903
0.14
0.11
58.4
23.5
89.7
5.3
Youle
KD702
19/05/2020
144.0
15417
7098
910
1.37
1.02
4.1
6.0
12.1
6.8
Youle

Notes
1.     The AuEq (gold equivalent) grade is calculated using the following formula:

AuEq g per t = Au g per t + Sb% x 
Au price per g x Au processing recovery
Sb price per 10kg x Sb processing recovery

Figures used: Au $/oz = 1478, Sb $/t = 5931 Au Recovery = 89.3% and Sb Recovery = 95.3%

2.     Where the true width of the composite is greater than 1.8m the diluted AuEq g/t is not diluted.

Appendix B. Costerfield - Regional Drilling Results

Hole ID
Hole Completion Date
Total Hole Depth
Intercept Easting (Mine Grid)
Intercept Northing (Mine Grid)
Intercept Elevation (Mine Grid)
Drill Width (m)
True Width
Au Grade (g/t)
Sb Grade (%)
AuEq. (g/t)
AuEq (g/t) over min. 1.8 m mining width
Sampled Structure if Known
BWN001
21/05/2020
323.6
17634
6267
1126
2.21
1.27
14.5
0.0
14.5
10.3
Felix Lode
BWN001
21/05/2020
323.6
17597
6267
1094
0.07
0.07
2.6
0.1
2.6
0.1
 
BWN001
21/05/2020
323.6
17587
6267
1086
0.40
0.37
1.8
0.2
2.1
0.4
 
BWN001
21/05/2020
323.6
17586
6267
1085
0.72
0.00
0.6
0.1
0.7
0.0
 
BWN001
21/05/2020
323.6
17579
6266
1079
0.64
0.37
0.6
0.2
0.9
0.2
 
BWN001
21/05/2020
323.6
17578
6266
1079
0.13
0.07
0.7
0.6
1.5
0.1
 
BWN001
21/05/2020
323.6
17576
6266
1076
1.42
0.91
5.4
1.6
7.6
3.8
Western Lode
Including
 
 
 
 
 
0.19
0.12
23.2
0.2
23.5
1.6
Western Lode
BWN002
4/06/2020
300.0
17581
6271
1132
1.49
0.88
3.3
0.1
3.4
1.7
Western Lode
Including
 
 
 
 
 
0.18
0.11
24.4
0.0
24.4
1.5
Western Lode
BWN002
4/06/2020
300.0
17588
6271
1126
2.23
1.15
0.7
0.4
1.2
0.8
 
BWN002
4/06/2020
300.0
17626
6271
1089
1.96
1.36
1.0
0.6
1.8
1.4
Felix Lode
RB001
22/04/2020
244.7
17405
4907
1113
2.96
2.09
0.5
0.0
0.5
0.5
Cochrane Lode
RB002
1/05/2020
241.6
17397
4942
1151
2.92
1.42
2.7
0.4
3.3
2.6
Cochrane Lode
RB003
8/05/2020
149.9
17381
5047
1173
2.22
1.70
1.4
0.1
1.5
1.4
Cochrane Lode
RB003
8/05/2020
149.9
17327
5044
1135
0.29
0.26
0.0
0.0
0.1
0.0
Robinson Lode
TB002
30/03/2020
229.1
13251
7204
1134
0.14
0.13
5.8
14.2
24.7
1.8
Malbec Fault
TB003
15/04/2020
242.4
13615
6579
1119
0.34
0.21
1.0
0.0
1.0
0.1
 
TB003
15/04/2020
242.4
13601
6579
1109
1.65
1.52
1.5
0.0
1.5
1.2
Merlot Splay
TB003
15/04/2020
242.4
13550
6580
1070
0.33
0.30
2.1
0.0
2.1
0.4
 
TB003
15/04/2020
242.4
13549
6580
1070
0.41
0.35
0.9
0.0
0.9
0.2
 

Notes
1.     The AuEq (gold equivalent) grade is calculated using the following formula:

AuEq g per t = Au g per t + Sb% x 
Au price per g x Au processing recovery
Sb price per 10kg x Sb processing recovery

Figures used: Au $/oz = 1478, Sb $/t = 5931 Au Recovery = 89.3% and Sb Recovery = 95.3%

2.     Where the true width of the composite is greater than 1.8m the diluted AuEq g/t is not diluted.

Appendix C. Björkdal – West Pit Skarn Intercepts  

Hole id
Hole
Completion
Date
Intercept
Northing
(Mine Grid)
Intercept
Easting
(Mine Grid)
Intercept
Elevation
(Mine Grid)
From
(m)
To
(m)
Drilled
Width
(m)
True
Width
(m)
Au
Grade
(g/t)
Au (g/t)
over min. 3 m
mining width
MP9-001
8/10/2019
1056
1212
-140
75.7
76.2
0.45
0.36
1.3
0.2
MP9-002
12/10/2019
1026
1241
-183
123.8
124.5
0.65
0.54
1.2
0.2
MP9-002
 
1025
1241
-184
125.0
126.2
1.20
1.02
43.0
14.6
MP9-002
 
1020
1241
-192
134.3
134.9
0.60
0.49
17.2
2.8
MP9-003
16/10/2019
1075
1257
-150
75.1
75.6
0.50
0.41
1.1
0.2
MP9-003
 
1062
1267
-190
118.0
118.9
0.85
0.71
25.8
6.1
MP9-003
 
1059
1270
-200
128.6
129.6
1.00
0.84
0.9
0.3
MP9-004
22/10/2019
1004
1120
-135
61.0
61.4
0.35
0.28
1.4
0.1
MP9-004
 
984
1121
-171
102.0
102.5
0.50
0.41
0.9
0.1
MP9-005
30/11/2019
1111
1324
-172
101.2
101.9
0.70
0.58
2.2
0.4
MP9-005
 
1106
1329
-183
114.5
114.6
0.05
0.01
1.6
0.0
MP9-005
 
1106
1329
-184
114.7
115.7
1.05
0.89
7.8
2.3
MP9-006
6/12/2019
1077
1220
-197
131.7
132.0
0.35
0.28
1.2
0.1
MP9-006
 
1076
1219
-199
133.7
134.7
0.92
0.77
1.2
0.3
MP9-007
10/01/2020
1136
1157
-166
87.8
88.1
0.35
0.28
12.6
1.2
MP9-007
 
1123
1150
-191
116.6
117.6
1.00
0.84
8.6
2.4
MP9-007
 
1112
1144
-212
141.5
141.9
0.45
0.36
2.8
0.3
MP9-007
 
1105
1141
-226
157.3
157.8
0.50
0.41
1.5
0.2
MP9-008
7/01/2020
1119
1199
-208
132.1
132.8
0.65
0.54
2.4
0.4
MP9-009
17/12/2019
1123
1231
-168
107.0
107.4
0.40
0.32
1.0
0.1
MP9-009
 
1103
1250
-199
148.0
149.0
1.00
0.84
2.0
0.5
MP9-009
 
1101
1252
-201
151.7
152.0
0.35
0.28
2.9
0.3
MP9-015
11/12/2019
1142
1233
-90
6.4
7.0
0.65
0.54
1.3
0.2
MP9-015
 
1130
1232
-102
23.0
23.5
0.50
0.41
1.8
0.2
MP9-015
 
1043
1227
-191
147.6
148.2
0.60
0.49
4.2
0.7

Appendix D. Björkdal – Aurora Intercepts  

Hole id
Hole
Completion
Date
Intercept
Northing
(Mine Grid)
Intercept
Easting
(Mine Grid)
Intercept
Elevation
(Mine Grid)
From
(m)
To
(m)
Drilled
Width
(m)
True
Width
(m)
Au
Grade
(g/t)
Au (g/t)
over min. 3 m
mining width
DOD2019-050
12/09/2019
1752
1109
-421
111.0
114.0
3.00
2.75
0.32
0.30
DOD2019-048
29/09/2019
1724
1102
-380
95.8
99.1
3.30
3.04
3.05
3.05
DOD2019-049
20/09/2019
1739
1107
-400
100.9
104.4
3.50
3.31
0.16
0.16
DOD2019-051
17/09/2019
1738
1125
-387
99.8
103.0
3.20
3.17
0.29
0.29
DOD2019-068
23/11/2019
1718
1269
-321
189.6
194.9
5.30
5.01
0.68
0.68
DOD2019-069
13/11/2019
1726
1324
-316
185.6
190.8
5.20
5.19
1.9
1.9
DOD2019-070
8/11/2019
1729
1348
-316
187.4
193.3
5.85
5.83
2.3
2.3
DOD2019-089
16/10/2019
1745
1045
-438
134.3
138.3
4.00
2.66
0.2
0.2
DOD2019-090
23/09/2019
1743
1079
-420
114.7
118.0
3.30
2.71
0.7
0.6
DOD2019-091
14/09/2019
1760
1081
-453
132.0
135.0
3.00
2.24
0.5
0.4
DOD2019-109
3/10/2019
1760
1122
-423
116.0
119.3
3.25
3.03
0.0
0.0
DOD2019-110
9/10/2019
1757
1097
-439
121.3
124.8
3.55
2.90
0.2
0.2
DOD2019-136
9/12/2019
1831
1437
-483
98.8
105.5
6.75
6.09
0.6
0.6
DOD2019-137
29/11/2019
1812
1467
-463
94.0
101.0
7.00
5.73
0.6
0.6
DOD2019-138
3/12/2019
1812
1484
-462
105.6
110.1
4.55
3.38
1.1
1.1
DOD2019-139
6/12/2019
1832
1456
-493
105.4
113.7
8.35
6.76
0.4
0.4
DOD2019-140
12/12/2019
1835
1408
-505
104.6
108.2
3.60
3.03
1.3
1.3
DOD2019-151
28/12/2019
1847
1434
-511
119.0
123.4
4.40
3.56
1.1
1.1
DOD2019-152
20/01/2020
1838
1454
-512
115.7
119.9
4.20
3.11
1.3
1.3
DOD2019-153
24/01/2020
1838
1480
-508
122.2
133.4
11.25
7.90
1.2
1.2
DOD2019-154
27/01/2020
1849
1413
-527
125.8
130.3
4.50
3.38
5.3
5.3
DOD2019-155
3/01/2020
1854
1437
-531
132.5
137.9
5.45
3.97
0.1
0.1
DOD2020-032
21/03/2020
1775
1494
-381
168.0
172.5
4.45
3.89
1.2
1.2
DOD2020-033
21/03/2020
1762
1451
-363
145.9
150.0
4.15
4.00
0.5
0.5
ME20-004
4/03/2020
1649
1409
-151
119.0
123.0
4.00
3.74
0.1
0.1
ME20-005
17/03/2020
1743
1526
-293
331.8
336.4
4.60
4.30
1.6
1.6
ME20-006
26/03/2020
1650
1190
-246
230.6
234.9
4.35
4.33
0.1
0.1
ME20-007
9/04/2020
1672
1116
-274
254.4
257.2
2.85
2.66
1.1
1.0
MU20-007
4/04/2020
1775
1589
-371
305.5
310.0
4.50
4.05
0.6
0.6
MU20-009A
30/03/2020
1923
1597
-670
327.1
329.0
1.95
1.07
14.5
5.2
MU20-009A
 
1957
1595
-701
368.4
379.5
11.05
3.35
2.0
2.0
MU20-010
19/02/2020
1960
1640
-686
363.6
364.2
0.60
0.38
3.8
0.5
MU20-011
19/05/2020
1912
1545
-642
307.3
314.5
7.25
4.31
9.7
9.7
MU20-012
21/04/2020
1811
1626
-458
124.5
128.2
3.75
3.45
0.3
0.3
MU20-014
4/03/2020
1870
1602
-496
163.7
172.5
8.80
7.26
0.2
0.2
MU20-015
25/02/2020
1812
1572
-442
137.0
138.4
1.35
1.14
2.4
0.9
MU20-018
4/05/2020
1803
1619
-397
121.3
130.1
8.85
7.21
2.5
2.5
MU9-001A
6/06/2019
1632
1087
-201
316.3
323.0
6.70
5.89
0.2
0.2
MU9-002
5/09/2019
1700
1381
-253
312.4
315.0
2.65
2.13
0.3
0.2
MU9-003
12/01/2020
1658
1068
-244
339.0
343.7
4.70
3.91
0.2
0.2
MU9-004
29/07/2019
1634
991
-234
339.0
344.8
5.75
4.55
0.5
0.5
MU9-006
20/12/2019
1657
1285
-225
294.9
298.7
3.80
3.36
0.0
0.0
MU9-007
20/01/2020
1731
1477
-307
348.0
353.3
5.35
4.95
0.8
0.8
MU9-030
28/11/2019
1809
1051
-524
279.5
281.5
2.05
1.46
0.6
0.3

Appendix E. Björkdal – Northern Extension Intercepts  

Hole id
Hole
Completion
Date
Intercept
Northing
(Mine Grid)
Intercept
Easting
(Mine Grid)
Intercept
Elevation
(Mine Grid)
From
(m)
To
(m)
Drilled
Width
(m)
True
Width
(m)
Au
Grade
(g/t)
Au (g/t)
over min. 3 m
mining width
MU20-001
11/02/2020
1860
1227
-506
14.8
15.2
0.45
0.38
1.0
0.1
MU20-001
 
1863
1227
-508
18.1
18.5
0.40
0.29
3.2
0.3
MU20-001
 
1895
1228
-521
52.7
53.1
0.35
0.20
3.6
0.2
MU20-001
 
1896
1228
-522
53.6
54.1
0.50
0.31
1.1
0.1
MU20-001
 
1997
1232
-562
162.1
162.7
0.55
0.38
3.4
0.4
MU20-001
 
2003
1233
-564
168.6
169.3
0.70
0.50
0.9
0.2
MU20-001
 
2041
1235
-578
209.3
210.4
1.05
0.82
3.9
1.1
MU20-001
 
2117
1242
-603
289.7
290.9
1.25
0.92
1.6
0.5
MU20-001
 
2132
1243
-608
305.2
305.8
0.65
0.50
2.7
0.5
MU20-001
 
2140
1244
-610
313.6
314.3
0.70
0.66
3.3
0.7
MU20-001
 
2155
1245
-615
329.2
329.9
0.65
0.61
1.3
0.3
MU20-001
 
2166
1246
-618
340.7
341.5
0.85
0.61
27.0
5.5
MU20-001
 
2223
1252
-635
401.0
401.4
0.45
0.21
1.4
0.1
MU20-001
 
2238
1253
-639
416.9
417.2
0.35
0.32
1.4
0.1
MU20-001
 
2252
1255
-643
430.8
431.2
0.40
0.31
10.1
1.0
MU20-002
29/04/2020
1831
1321
-495
0.8
2.3
1.55
0.95
3.2
1.0
MU20-002
 
1912
1301
-528
90.9
91.4
0.50
0.27
1.1
0.1
MU20-002
 
1984
1285
-555
169.7
170.4
0.70
0.64
3.0
0.6
MU20-002
 
2012
1279
-566
200.1
200.8
0.70
0.57
1.5
0.3
MU20-002
 
2039
1273
-575
229.3
230.4
1.10
1.01
2.1
0.7
MU20-002
 
2046
1271
-578
237.4
237.7
0.30
0.25
1.8
0.2
MU20-002
 
2093
1261
-594
287.8
288.4
0.60
0.34
0.9
0.1
MU20-002
 
2136
1252
-609
334.4
334.7
0.25
0.15
6.6
0.3
MU20-002
 
2142
1251
-611
339.4
341.9
2.45
2.09
2.5
1.8
MU20-002
 
2148
1250
-613
346.7
347.2
0.50
0.27
1.1
0.1
MU20-002
 
2150
1249
-613
349.2
349.5
0.35
0.31
0.9
0.1
MU20-002
 
2155
1248
-615
354.2
354.9
0.70
0.61
1.8
0.4
MU20-002
 
2162
1247
-617
362.5
362.9
0.40
0.15
0.8
0.0
MU20-002
 
2165
1246
-618
364.7
365.4
0.70
0.50
5.5
0.9
MU20-002
 
2174
1244
-621
374.4
375.0
0.60
0.54
1.4
0.3
MU20-002
 
2175
1244
-621
376.0
377.0
1.00
0.92
2.5
0.8
MU20-002
 
2178
1244
-622
379.0
379.5
0.45
0.40
3.0
0.4
MU20-002
 
2180
1243
-623
381.5
381.8
0.35
0.31
3.0
0.3
MU20-002
 
2198
1240
-628
400.7
401.0
0.35
0.31
1.3
0.1
MU20-002
 
2204
1239
-630
406.5
407.1
0.60
0.56
1.9
0.3
MU20-002
 
2215
1236
-633
418.8
419.2
0.40
0.21
1.4
0.1
MU20-003
1/06/2020
1825
1169
-502
15.5
15.8
0.35
0.25
1.4
0.1
MU20-003
 
1837
1167
-509
29.1
29.7
0.60
0.34
2.5
0.3
MU20-003
 
1840
1167
-511
32.5
33.2
0.75
0.75*
1.8
0.5
MU20-003
 
2194
1144
-690
431.0
431.3
0.30
0.19
4.9
0.3
MU20-003
 
2216
1145
-699
454.6
455.4
0.80
0.52
1.9
0.3
MU20-003
 
2261
1147
-715
502.4
502.7
0.30
0.19
8.7
0.6

Notes

 * True width not attainable as intercept was not associated with a measurable vein.

Figure 1

Longitudinal section of Youle illustrating the location of recent Youle extension and optimization intercepts in close proximity to current workings.
Figure 2

Longitudinal Section and Plan Section of Youle illustrating the location of recent exploration intercepts with detail against the Youle Extension intercepts.
Figure 3

Map of the regional testing programs
Figure 4

Plan Section illustrating drill hole trace for BWN001 & BWN002 in relation to historic Felix Brown mine and mapped surface reefs in the Brown’s Program.
Figure 5

Cross Section illustrating interpretation from the first 2 holes drilled so far in the Brown’s Program.
Figure 6

Plan Section illustrating drill hole trace for RB001, RB002 and RB003 in relation to historic Robinson’s shaft and Robinsons and Cochranes’s surface reefs.
Figure 7

Cross Section illustrating interpretation from the first 2 holes drilled so far in the Robinson’s Program.
Figure 8

Plan Section illustrating drill hole trace for TB002 & TB003 in relation to historic Merlot and Malbec faults.
Figure 9

Cross Section illustrating interpretation so far in the True Blue Program.
Figure 12

Cross Section illustrating interpretation so far in the True Blue Program.
Figure 13

Cross section of Björkdal Mine Area Showing the Location of the West pit Skarn Extension intercepts.
Figure 14

Björkdal Mine Scale Overview Map Showing the Location of the Aurora Zone and the Northern target test drilling in relation to mine development. Below Cross section are denoted with A-A’ (Aurora Longitudinal Section) and B-B’ (Northern Extension Cross Section).
Figure 15

Longitudinal Section of the Aurora Zone, Looking North, Illustrating Location of Recent Intercepts.
Figure 16

Cross section of Björkdal Mine Area Showing the Location of the Northern Extension Intercepts.
Stock Information

Company Name: Mandalay Resources Corp.
Stock Symbol: MNDJF
Market: OTC
Website: mandalayresources.com

Menu

MNDJF MNDJF Quote MNDJF Short MNDJF News MNDJF Articles MNDJF Message Board
Get MNDJF Alerts

News, Short Squeeze, Breakout and More Instantly...