Twitter

Link your Twitter Account to Market Wire News


When you linking your Twitter Account Market Wire News Trending Stocks news and your Portfolio Stocks News will automatically tweet from your Twitter account.


Be alerted of any news about your stocks and see what other stocks are trending.



home / news releases / MARI:CC - Marimaca Announces Infill Drilling Results Further Confirming Consistency of Mineralization at the MOD


MARI:CC - Marimaca Announces Infill Drilling Results Further Confirming Consistency of Mineralization at the MOD

VANCOUVER, British Columbia, Sept. 07, 2022 (GLOBE NEWSWIRE) -- Marimaca Copper Corp. (“Marimaca Copper” or the “Company”) (TSX: MARI) is pleased to announce further results from the 2022 infill and extensional drilling campaign at the Marimaca Oxide Deposit (the “MOD”). Results reflect a total of 6,130m across 31 drill holes.

The drilling intersected mineralization in-line with the current geological interpretation of the MOD. Drilling in the south-east zone of the MOD, on trend with the Sierra and Sorpresa satellite targets, continues to demonstrate extensions to green-oxide rich mineralization beyond the previously interpreted limits of the 2019 Mineral Resource Estimate (“MRE”). Copper oxide mineralization also remains open to the east of the MOD. Hole MAR-158 was drilled on a ~150m step-out from the eastern pit limits and intersected continuations of shallow green oxide mineralization. Drilling on the western boundary of the MOD confirmed limits of copper oxide mineralization with lower-grade intersections of thinning mineralization. In the central MOD, hole MAR-65Ext intersected extensions of higher-grade mineralization into the MAMIX zone.

Highlights

  • Infill drilling intersected extensions to known green-oxide mineralization in the south-east zone of the MOD, consistent with previous 2022 results (see release dated March 28, 2022)
  • MAMIX drilling intersected extensions to higher grade oxide and mixed mineralization at depth, improving confidence in the higher-grade core of the MOD and MAMIX
  • Oxide intersections from step-out drilling on the north-eastern boundary of the MOD (MAR-158) demonstrates a material broadening of the MOD’s oxide halo to the east which is consistent with previous step-out drilling (MAR-126, see release dated May 5, 2021)
  • Notable intersections include
    • MAR-65Ext intersected 332m at 0.44% CuT from 36m, including a higher-grade extension of 78m at 0.90% CuT from 218m
    • LAR-96 intersected 98m at 0.41% CuT from surface including 22m at 1.14% CuT from surface
    • MAR-172 intersected 200m at 0.25% CuT from 12m including 66m at 0.51% CuT from 38m
    • MAR-171 intersected 164m at 0.37% CuT from 2m including 96m at 0.53% CuT from 70m
    • MAR-158 intersected 72m at 0.36% CuT from 120m
    • LAR-03 intersected 346m at 0.32% CuT from 2m including 40m at 0.34% CuT from 272m
    • LAR-25 intersected 340m at 0.33% CuT from 12m
  • The 2022 drilling program is now finalized with 38,570m of RC and 3,000m of diamond drilling complete
    • 21,992m of remaining drilling to be released pending final assay results

Sergio Rivera, VP Exploration of Marimaca Copper, commented:

“We have now completed the 2022 Marimaca drilling campaign with our work now focused on the upcoming mineral resource update planned for late September or early October.

“Overall, the 2022 program was a success. All our objectives going into the program were met and results continue to be in-line with our geological interpretation at the MOD, with the consistency of the Marimaca mineralization demonstrated again in this latest batch of results.”

Overview of Drilling Campaign Objectives

Marimaca’s 2022 RC drilling campaign consists of over 38,570m of drilling between the MOD infill and the MAMIX zone, the depth extension of the MOD.

Geological interpretation and resource modelling is currently underway ahead of the planned 2022 Mineral Resource Update (“MRE”) expected in late Q3. The 2022 MRE will capture drilling data completed up to June 30th, 2022, with the balance of the infill drilling (targeting conversion to Measured and Indicated Resource categories) to be captured in a subsequent MRE planned for early 2023.

Figure 1: Plan View of Infill Drilling Results, Pending Holes and MOD PEA Pit Shell:
https://www.globenewswire.com/NewsRoom/AttachmentNg/5a93e53e-c466-4d72-aabd-fcf039cca3cb

Table 1. Summary of Infill Drill Results

Hole
TD (m)
From (m)
To (m)
m
%CuT
MAR-158
200
8
192
184
0.23
including
8
68
60
0.22
including
8
28
20
0.23
and
46
64
18
0.41
120
192
72
0.36
including
120
146
26
0.44
and
174
192
18
0.71
MAR-159
200
72
84
12
0.21
150
172
22
0.25
MAR-160
160
24
38
14
0.14
92
104
12
0.52
MAR-161
210
112
164
52
0.27
MAR-162
180
2
12
10
0.29
122
134
12
0.25
MAR-163
180
2
8
6
0.22
88
150
62
0.14
MAR-164
200
2
8
6
0.32
126
192
66
0.24
including
152
192
40
0.31
MAR-165
200
118
148
30
0.23
including
124
138
14
0.34
MAR-166
300
12
300
288
0.19
including
12
30
18
0.23
and
56
88
32
0.32
98
138
40
0.21
164
172
8
0.36
230
300
70
0.29
including
230
258
28
0.49
and
282
300
18
0.27
MAR-167
300
98
154
56
0.15
including
98
122
24
0.20
188
292
104
0.20
including
188
252
64
0.20
270
292
22
0.33
MAR-168
200
14
150
136
0.20
including
14
104
90
0.16
and
124
150
26
0.46
MAR-169
250
96
200
104
0.27
including
12
52
40
0.20
and
96
140
44
0.23
150
200
50
0.35
including
150
176
26
0.21
and
186
200
14
0.81
222
242
20
0.17
MAR-170
250
14
102
88
0.28
including
14
42
28
0.50
and
80
102
22
0.42
206
214
8
0.48
MAR-171
200
2
166
164
0.37
including
2
20
18
0.21
and
38
54
16
0.32
70
166
96
0.53
including
70
118
48
0.71
and
140
166
26
0.62
MAR-172
220
12
212
200
0.25
including
12
28
16
0.16
38
104
66
0.51
including
38
60
22
0.51
and
72
104
32
0.67
134
170
36
0.22
LAR-88
200
62
74
12
0.12
146
156
10
0.29
LAR-89
170
12
24
12
0.41
144
168
24
0.18
LAR-90
200
18
34
16
0.18
114
130
16
0.16
LAR-91
150
4
36
32
0.21
116
134
18
0.15
LAR-93
260
58
82
24
0.21
LAR-94
150
34
148
114
0.17
including
34
76
42
0.16
110
148
38
0.28
including
126
148
22
0.41
LAR-95
300
28
190
162
0.20
including
40
80
40
0.41
and
160
182
22
0.27
228
252
24
0.18
LAR-96
270
0
98
98
0.41
including
0
22
22
1.14
and
70
98
28
0.38
156
164
8
0.53
236
266
30
0.17
including
236
248
12
0.27
LAR-97
170
4
18
14
0.26
ATR-113
160
24
152
128
0.22
including
24
38
14
0.31
and
50
92
42
0.33
136
152
16
0.33


Table 2. Summary of MAMIX Drill Results

Hole
TD (m)
From (m)
To (m)
m
%CuT
LAR-03ext
350
Historic + New
2
348
346
0.32
262
348
86
0.25
272
312
40
0.34
LAR-15ext
450
Historic + New
12
428
416
0.15
302
320
18
0.30
416
428
12
0.13
LAR-25ext
400
Historic + New
12
352
340
0.33
256
352
96
0.24
MAR-65ext
400
Historic + New
36
368
332
0.44
218
368
150
0.61
including
218
296
78
0.90
ATR-89ext
400
Historic + New
10
374
364
0.21
318
374
56
0.24
including
340
374
34
0.34


Table 3. Infill collars and survey

Hole
Easting
Northing
Elevation
Azimuth
Inclination
Depth
MAR-158
375363.6
7435943.5
1127.3
220
-60
200
MAR-159
375219.2
7435932.4
1119.5
220
-60
200
MAR-160
375256.0
7435905.7
1109.6
310
-60
160
MAR-161
375176.6
7435902.6
1114.7
310
-60
210
MAR-162
375235.7
7435861.8
1093.6
310
-60
180
MAR-163
375148.1
7435868.5
1110.4
310
-60
180
MAR-164
375234.3
7435853.9
1093.3
220
-60
200
MAR-165
375146.0
7435861.8
1110.4
220
-60
150
MAR-166
375163.7
7435000.1
1050.8
310
-60
300
MAR-167
375110.5
7435834.2
1104.6
310
-60
300
MAR-168
375224.9
7434945.9
1036.6
310
-60
200
MAR-169
375268.1
7435159.1
1061.5
220
-60
250
MAR-170
374974.0
7435243.1
1051.4
220
-60
250
MAR-171
374991.9
7435297.5
1060.7
220
-60
200
MAR-172
375158.0
7435199.7
1080.0
220
-60
220
LAR-88
374572.7
7435553.3
1026.6
220
-60
200
LAR-89
374665.8
7436069.2
961.9
310
-60
170
LAR-90
374557.6
7435609.9
1023.8
220
-60
200
LAR-91
374494.5
7435937.8
964.0
220
-60
150
LAR-92
374443.3
7435844.1
972.0
220
-60
150
LAR-93
374556.1
7435697.0
1014.9
220
-60
260
LAR-94
374608.2
7435588.3
1050.8
220
-60
150
LAR-95
374639.3
7435579.1
1064.0
220
-60
300
LAR-96 (*)
374762.0
7435919.0
1015.0
220
-60
270
LAR-97
374522.7
7435811.0
984.6
220
-60
170
ATR-113
374771.6
7436325.5
1047.4
310
-60
160
(*) unsurveyed collar location


Table 4. MAMIX collars and survey

Hole
Easting
Northing
Elevation
Azimuth
Inclination
Extension
Final Depth
LAR03-EXT
374684.6
7435736.1
1084.7
310
-60
100
350
LAR15-EXT
374839.0
7435824.8
1068.2
220
-60
200
450
LAR25-EXT
374765.1
7435781.1
1076.1
220
-60
150
400
MAR65-EXT
374902.1
7435647.2
1112.9
220
-60
200
400
ATR89-EXT
375062.3
7435866.5
1093.2
310
-60
100
400


Sampling and Assay Protocol

True widths cannot be determined with the information available at this time. RC holes were sampled on a 2m continuous basis, with dry samples riffle split on site and one quarter sent to the Andes Analytical Assay preparation laboratory in Calama and the pulps then sent to the same company laboratory in Santiago for assaying. A second quarter was stored on site for reference. Samples were prepared using the following standard protocol: drying; crushing to better than 85% passing -10#; homogenizing; splitting; pulverizing a 500-700g subsample to 95% passing -150#; and a 125g split of this sent for assaying. All samples were assayed for %CuT (total copper) and %CuS (acid soluble copper) by AAS. A full QA/QC program, involving insertion of appropriate blanks, standards and duplicates was employed with acceptable results. Pulps and sample rejects are stored by Marimaca Copper for future reference.

Qualified Person

The technical information in this news release, including the information that relates to geology, drilling and mineralization was prepared under the supervision of, or has been reviewed by Paola Kovacic, Exploration Manager, Marimaca Copper Corp, a geologist with more than 20 years of experience and a member of the Colegio de Geólogos de Chile and of the Society of Economic Geologist USA, , and who is the Qualified Person for the purposes of NI 43-101 responsible for the design and execution of the drilling program.

The QP confirms she has visited the project area, has reviewed relevant project information, is responsible for the information contained in this news release, and consents to its publication.

Contact Information
For further information please visit www.marimaca.com or contact:

Tavistock
+44 (0) 207 920 3150
Jos Simson / Emily Moss / Nick Elwes
marimaca@tavistock.co.uk

Forward Looking Statements

This news release includes certain “forward-looking statements” under applicable Canadian securities legislation. There can be no assurance that such statements will prove to be accurate, and actual results and future events could differ materially from those anticipated in such statements. Forward-looking statements reflect the beliefs, opinions and projections on the date the statements are made and are based upon a number of assumptions and estimates that, while considered reasonable by Marimaca Copper, are inherently subject to significant business, economic, competitive, political and social uncertainties and contingencies. Many factors, both known and unknown, could cause actual results, performance or achievements to be materially different from the results, performance or achievements that are or may be expressed or implied by such forward-looking statements and the parties have made assumptions and estimates based on or related to many of these factors. Such factors include, without limitation: risks related to share price and market conditions, the inherent risks involved in the mining, exploration and development of mineral properties, the uncertainties involved in interpreting drilling results and other geological data, fluctuating metal prices, the possibility of project delays or cost overruns or unanticipated excessive operating costs and expenses, uncertainties related to the necessity of financing, the availability of and costs of financing needed in the future as well as those factors disclosed in the annual information form of the Company dated March 28, 2022, the final short form base prospectus and other filings made by the Company with the Canadian securities regulatory authorities (which may be viewed at www.sedar.com ). Accordingly, readers should not place undue reliance on forward-looking statements. Marimaca Copper undertakes no obligation to update publicly or otherwise revise any forward-looking statements contained herein whether as a result of new information or future events or otherwise, except as may be required by law.

Neither the Toronto Stock Exchange nor the Investment Industry Regulatory Organization of Canada accepts responsibility for the adequacy or accuracy of this release.


Stock Information

Company Name: Marimaca Copper Corp.
Stock Symbol: MARI:CC
Market: TSXC
Website: marimaca.com

Menu

MARI:CC MARI:CC Quote MARI:CC Short MARI:CC News MARI:CC Articles MARI:CC Message Board
Get MARI:CC Alerts

News, Short Squeeze, Breakout and More Instantly...