Twitter

Link your Twitter Account to Market Wire News


When you linking your Twitter Account Market Wire News Trending Stocks news and your Portfolio Stocks News will automatically tweet from your Twitter account.


Be alerted of any news about your stocks and see what other stocks are trending.



home / news releases / MUX:CC - McEwen Copper: Update on Assay Results at Los Azules


MUX:CC - McEwen Copper: Update on Assay Results at Los Azules

Remaining assays from the 2022-2023 season, highlights include:

446 m of 0.63% Cu , including 76 m of 0.92% Cu (AZ23228MET)

TORONTO, Feb. 26, 2024 (GLOBE NEWSWIRE) -- McEwen Copper Inc ., 47.7% owned by McEwen Mining Inc. (NYSE: MUX) (TSX: MUX) is pleased to announce assay results from the final unreleased drill holes of the last season (2022-2023). The results from this period not only validate previous drilling results but also confirm the continuity of mineralization and extend the mineralization.

Selected Highlights:

  • Hole AZ23 205 MET returned 257 m of 0.76% Cu within the Enriched zone.

  • Hole AZ23 228 MET returned 446 m of 0.63% Cu in the Enriched zone, including 76 m of 0.92% Cu .

  • Hole AZ23 230 MET returned 250 m of 0.68% Cu in the Enriched zone, including 192 m of 0.83% Cu.

The objective of the 2022-2023 drilling campaign was to collect information needed as the project advances towards the completion of a Feasibility Study in Q1 2025. Work continues during this field season (2023-2024) and includes resource drilling that will convert the initial 5-year pit resources to Measured and Indicated categories and will further upgrade resources from Inferred to Indicated. In addition to resource drilling, geotechnical, metallurgical, hydrogeological, exploration, and condemnation drilling are also being performed.

With the closing in October 2023 of a US$10.0 million investment by Nuton, a Rio Tinto venture, and the ARS $42 billion investment by Stellantis, the Los Azules Project is fully funded for the 2023-2024 drilling campaign. McEwen Copper is currently seeking funding to support feasibility-level engineering and pre-construction work. Another record-setting drill season is underway at Los Azules with over 62,000 meters of drilling, of which 43,000 meters have been completed to date.

“Argentina’s new president is taking important initiatives to unlock the country’s potential to become a significant supplier of critical minerals to the world, to combat climate change and at the same time strengthening the economy,” said Rob McEwen, Chairman and Chief Owner.

“McEwen Copper’s Los Azules project is progressing at light speed towards completing a feasibility study by Q1 2025 and it has already delivered significant economic benefits to the neighbouring communities. It is a very large copper resource, where recent exploration drilling suggests it definitely has room to grow,” said Michael Meding, Vice President and General Manager of McEwen Copper.

Table 1 - Remaining 2022-2023 Los Azules metallurgical drilling results. All intercepts are approximate true thickness.

Hole-ID
Section
Predominant
Mineral Zone
From
(m)
To
(m)
Length
(m)
Cu
%
Au
(g/t)
Ag
(g/t)
Comment
AZ23199MET
31
Total
100.0
271.0
171.0
0.80
0.06
1.56
Enriched
100.0
271.0
171.0
0.80
0.06
1.56
Incl. 156.0m of 0.85% Cu
Primary
AZ23200MET
34-33
Total
94.0
394.5
300.5
0.43
0.04
2.89
Enriched
94.0
394.5
300.5
0.43
0.04
2.89
Incl. 172.0m of 0.59% Cu
Primary
AZ23204MET
39
Total
116.0
312.0
196.0
0.50
0.12
1.83
Enriched
116.0
275.5
159.5
0.54
0.13
1.87
Incl. 38.0m of 1.01% Cu
Primary
275.5
312.0
36.5
0.34
0.07
1.67
AZ23205MET
31
Total
105.0
374.7
269.7
0.73
0.08
1.77
Enriched
105.0
362.0
257.0
0.76
0.09
1.94
Primary
362.0
374.7
12.7
0.28
0.05
1.30
AZ23226AMET
33
Total
90.0
275.3
185.3
0.47
0.03
0.91
Enriched
90.0
275.3
185.3
0.47
0.03
0.91
Incl. 38.0m of 0.66% Cu
Primary
AZ23228MET
47
Total
170.0
616.0
446.0
0.63
0.07
3.58
Enriched
170.0
430.0
260.0
0.72
0.07
4.18
Incl. 76.0m of 0.92% Cu
Primary
430.0
616.0
186.0
0.49
0.07
2.74
Incl. 52.0m of 0.80% Cu
AZ23229MET
50-51
Total
92.0
262.4
170.4
0.46
0.04
1.80
Enriched
92.0
262.4
170.4
0.46
0.04
1.80
Incl. 76.4m of 0.52% Cu
Primary
AZ23230MET
30
Total
104.0
438.2
334.2
0.59
0.06
3.66
Enriched
104.0
354.0
250.0
0.68
0.06
3.67
Incl. 192.0m of 0.83% Cu
Primary
354.0
438.2
84.2
0.31
0.07
3.61
AZ23232MET
48-49
Total
94.0
464.0
370.0
0.40
0.04
0.95
Enriched
94.0
414.0
320.0
0.44
0.05
1.02
Incl. 76.0m of 0.58% Cu
Primary
414.0
464.0
50.0
0.12
0.03
0.45
GTK2315MET
52-53
Total
69.0
521.2
452.2
0.29
0.05
1.09
Enriched
69.0
260.0
191.0
0.45
0.04
0.86
Incl. 76.0m of 0.70% Cu
Primary
260.0
521.2
261.2
0.18
0.05
1.26
GTK2316MET
30
Total
94.0
319.1
225.1
0.38
0.02
0.88
Enriched
94.0
319.1
225.1
0.38
0.02
0.88
Incl. 48.0m of 0.64% Cu
Primary
GTK2317MET
28-27
Total
156.0
326.0
170.0
0.42
0.02
2.15
Enriched
156.0
326.0
170.0
0.42
0.02
2.15
Incl. 58.0m of 0.49% Cu
Primary
AZ23210MET
30
Total
110.0
415.0
305.0
0.64
0.07
1.62
Enriched
110.0
352.0
242.0
0.73
0.07
1.59
Primary
352.0
415.0
63.0
0.28
0.06
1.73
AZ23223MET
32
Total
142.0
376.0
234.0
0.40
0.03
0.52
Enriched
142.0
376.0
234.0
0.40
0.03
0.52
Incl. 76.0m of 0.57% Cu
Primary
AZ23227MET
34
Total
69.0
334.0
265.0
0.68
0.07
1.27
Enriched
69.0
284.0
215.0
0.73
0.06
1.30
Incl. 137.0m of 0.80% Cu
Primary
284.0
334.0
50.0
0.44
0.09
1.13
Incl. 22.0m of 0.65% Cu

Results are summarized in three schematic cross sections ( Figures 2, 3, and 4 ), which include simplified interpretations of the Overburden, Leached, Enriched and Primary zones. The Enriched mineral zone refers to a copper deposit enriched by precipitation-derived water circulation that carries copper minerals downward through the rocks to accumulate in a thick, often horizontal “blanket”. Immediately above the Enriched zone is the Leached zone, from which copper was removed and transported. Weathering and oxidation often contribute to this process. Below the Enriched zone, the Primary (or Hypogene) zone is formed by ascending copper-rich thermal fluids, originating from a much deeper magmatic source. The green line indicates the pit floor of the 30-year pit shell from the 2023 NI 43-101 Preliminary Economic Assessment (PEA).

Figure 1 presents a plan view of the location of three sections and the holes reported. Adjacent cross sections are located 50 m apart from each other, starting with the lowest numbered section at the south end of the deposit and progressing to the north.

Figure 1 – Plan View Location of Cross-sections and Drill Holes in the Deposit


Figure 2 displays an intercept of 446 m grading 0.63% Cu (AZ23228MET) and includes 76 m grading 0.92% Cu within the Enriched zone. This hole extends higher-grade mineralization further to the west within the Enriched zone.

Figure 2 - Section 47 - Drilling, Mineralized Zones and 30-year PEA Pit (Looking North)


Figure 3 highlights a 257 m interval grading 0.76% Cu (AZ23205MET). Both this hole and hole AZ23199MET ( 171 m grading 0.80% Cu) directly to the west confirm the continuity and grade of the Enriched zone on this section.

Figure 3 - Section 31 - Drilling, Mineralized Zones and 30-year PEA Pit (Looking North)


Figure 4 presents an intercept of 250.0 m of 0.68% Cu in hole AZ23230MET. This hole validates mineralization in the center of this section. Hole AZ23210MET displays an intercept of 242.0 m of 0.73% Cu and extends higher grade mineralization in the Enriched zone to the east. Hole GTK2316 contains an intercept of 225.1 m of 0.38% Cu . These three new holes validate the continuity and strength of mineralization on this section.

Figure 4 - Section 30 - Drilling, Mineralized Zones and 30-year PEA Pit (Looking North)


Technical information

The technical content of this press release has been reviewed and approved by Darren King, Director of Exploration of McEwen Copper, who serves as the qualified person (QP) under the definitions of National Instrument 43-101.

All samples were collected in accordance with generally accepted industry standards. Drill core samples, usually taken at 2 m intervals, were split and submitted to the Alex Stewart International laboratory located in the Province of Mendoza, Argentina, for the following assays: gold determination using fire fusion assay and an atomic absorption spectroscopy finish (Au4-30); a 39 multi-element suite using ICP-OES analysis (ICP-AR 39); copper content determination using a sequential copper analysis (Cu-Sequential LMC-140). An additional 19-element analysis (ICP-ORE) was performed for samples with high sulphide content and that exceeded the limits of the ICP-OES analysis.

The company conducts a Quality Assurance/Quality Control program in accordance with NI 43-101 and industry best practices, using a combination of standards and blanks on approximately one out of every 25 samples. Results are monitored as final certificates are received, and any re-assay requests are sent back immediately. Pulp and preparation sample analyses are also performed as part of the QAQC process. Approximately 5% of the sample pulps are sent to a secondary laboratory for control purposes. In addition, the laboratory performs its own internal QAQC checks, with results made available on certificates for Company review.

Table 2 – Hole Locations and Lengths for Los Azules Drilling Results

HOLE-ID
Azimuth
Dip
Length
Loc X
Loc Y
Loc Z
AZ23199MET
250
-67
271.0
2383430
6558947
3659
AZ23226AMET
250
-77
275.3
2383311
6559016
3656
AZ23228MET
70
-60
616.0
2382837
6559585
3625
AZ23229MET
70
-70
262.4
2382846
6559746
3616
AZ23230MET
70
-73
438.2
2383344
6558864
3664
AZ23232MET
45
-70
464.0
2383226
6559780
3632
GTK2315MET
38
-70
521.2
2383192
6559976
3639
GTK2316MET
250
-78
319.1
2383348
6558863
3664
GTK2317MET
90
-70
326.0
2383561
6558835
3665
AZ23200MET
90
-70
394.5
2383467
6559120
3657
AZ23204MET
250
-76
312
2383292
6559323
3643
AZ23205MET
250
-74
374.7
2383504
6558973
3660
AZ23210MET
250
-76
415
2383533
6558930
3664
AZ23223MET
66
-73
376
2383253
6558932
3670
AZ23227MET
70
-79
334
2383305
6559059
3654
Coordinates listed in Table 2 based on Gauss Kruger - POSGAR 94 Zone 2

ABOUT MCEWEN COPPER

McEwen Copper is a well-funded, private company which owns 100% of the large, advanced-stage Los Azules copper project, located in the San Juan province, Argentina. McEwen Copper is a 47.7% owned private subsidiary of McEwen Mining, which is listed on NYSE and TSX under the ticker MUX.

Los Azules is being designed to be distinctly different from conventional copper mines, consuming significantly less water, emitting much lower carbon levels and progressing to be carbon neutral by 2038, being powered by 100% renewable energy once in operation. The project’s recently updated Preliminary Economic Assessment (PEA) projects a long life of mine, a short payback period, low production costs per pound, high annual copper production, and an after-tax IRR of 21.1%.

ABOUT MCEWEN MINING

McEwen Mining is a gold and silver producer with operations in Nevada, Canada, Mexico and Argentina. McEwen Mining also holds a 47.7% interest in McEwen Copper, which is developing the large, advanced-stage Los Azules copper project in Argentina. The company’s goal is to improve the productivity and life of its assets with the objective of increasing the share price and providing a yield. Rob McEwen, Chairman and Chief Owner, has a personal investment in the company of US$220 million. His annual salary is US$1.

CAUTION CONCERNING FORWARD-LOOKING STATEMENTS

This news release contains certain forward-looking statements and information, including "forward-looking statements" within the meaning of the Private Securities Litigation Reform Act of 1995. The forward-looking statements and information expressed, as at the date of this news release, McEwen Mining Inc.'s (the "Company") estimates, forecasts, projections, expectations or beliefs as to future events and results. Forward-looking statements and information are necessarily based upon a number of estimates and assumptions that, while considered reasonable by management, are inherently subject to significant business, economic and competitive uncertainties, risks and contingencies, and there can be no assurance that such statements and information will prove to be accurate. Therefore, actual results and future events could differ materially from those anticipated in such statements and information. Risks and uncertainties that could cause results or future events to differ materially from current expectations expressed or implied by the forward-looking statements and information include, but are not limited to, effects of the COVID-19 pandemic, fluctuations in the market price of precious metals, mining industry risks, political, economic, social and security risks associated with foreign operations, the ability of the corporation to receive or receive in a timely manner permits or other approvals required in connection with operations, risks associated with the construction of mining operations and commencement of production and the projected costs thereof, risks related to litigation, the state of the capital markets, environmental risks and hazards, uncertainty as to calculation of mineral resources and reserves, and other risks. Readers should not place undue reliance on forward-looking statements or information included herein, which speak only as of the date hereof. The Company undertakes no obligation to reissue or update forward-looking statements or information as a result of new information or events after the date hereof except as may be required by law. See McEwen Mining's Annual Report on Form 10-K for the fiscal year ended December 31, 2022, and other filings with the Securities and Exchange Commission, under the caption "Risk Factors", for additional information on risks, uncertainties and other factors relating to the forward-looking statements and information regarding the Company. All forward-looking statements and information made in this news release are qualified by this cautionary statement.

The NYSE and TSX have not reviewed and do not accept responsibility for the adequacy or accuracy of the contents of this news release, which has been prepared by the management of McEwen Mining Inc.

Want News Fast?
Subscribe to our email list by clicking here:
https://www.mcewenmining.com/contact-us/#section=followUs
and receive news as it happens!!

WEB SITE
SOCIAL MEDIA
www.mcewenmining.com
McEwen Mining
Facebook:
facebook.com/mcewenmining
LinkedIn:
linkedin.com/company/mcewen-mining-inc-
CONTACT INFORMATION
Twitter:
twitter.com/mcewenmining
150 King Street West
Instagram:
instagram.com/mcewenmining
Suite 2800, PO Box 24
Toronto, ON, Canada
McEwen Copper
Facebook:
facebook.com/ mcewencopper
M5H 1J9
LinkedIn:
linkedin.com/company/mcewencopper
Twitter:
twitter.com/mcewencopper
Relationship with Investors:
Instagram:
instagram.com/mcewencopper
(866)-441-0690 - Toll free line
(647)-258-0395
Rob McEwen
Facebook:
facebook.com/mcewenrob
Mihaela Iancu ext. 320
LinkedIn:
linkedin.com/in/robert-mcewen-646ab24
info@mcewenmining.com
Twitter:
twitter.com/robmcewenmux

Photos accompanying this announcement are available at:

https://www.globenewswire.com/NewsRoom/AttachmentNg/ab63eef5-5ec9-436d-81b5-0ead4d4041e1

https://www.globenewswire.com/NewsRoom/AttachmentNg/07f30ddd-1a49-4770-b141-7bdb440e4e65

https://www.globenewswire.com/NewsRoom/AttachmentNg/e3714f0b-53f7-41b8-a533-0cc526b932d9

https://www.globenewswire.com/NewsRoom/AttachmentNg/39a906eb-2ff7-4388-baa5-a4474d67c3cc


Stock Information

Company Name: Mcewen Mining Inc.
Stock Symbol: MUX:CC
Market: TSXC
Website: mcewenmining.com

Menu

MUX:CC MUX:CC Quote MUX:CC Short MUX:CC News MUX:CC Articles MUX:CC Message Board
Get MUX:CC Alerts

News, Short Squeeze, Breakout and More Instantly...