Twitter

Link your Twitter Account to Market Wire News


When you linking your Twitter Account Market Wire News Trending Stocks news and your Portfolio Stocks News will automatically tweet from your Twitter account.


Be alerted of any news about your stocks and see what other stocks are trending.



home / news releases / OMZNF - Osisko Metals Announces Additional Definition Drilling Results for Pine Point


OMZNF - Osisko Metals Announces Additional Definition Drilling Results for Pine Point

MONTREAL, Nov. 09, 2022 (GLOBE NEWSWIRE) -- Osisko Metals Incorporated (the " Company " or " Osisko Metals ") ( TSX-V: OM ; OTCQX: OMZNF ; FRANKFURT: 0B51 ) is pleased to announce results from the 2022 definition drilling program at its Pine Point Project, located in the Northwest Territories, Canada. This continuous drill program is designed to achieve an average drill spacing of approximately 30 metres within current mineral resources to upgrade resources presently classified as Inferred to the Indicated category so they can be included in the upcoming feasibility study.

In August of this year, the Company filed the 2022 Preliminary Economic Assessment (“PEA”) that included higher commodity prices and reduced dewatering costs. All intercepts reported below were within, or immediately adjacent to, the currently modelled and proposed open pit shells included in the PEA. Further assay results are pending.

The results reported in Tables 1 & 2 below are within expectations for the infill program needed to convert the North Zone deposits (Y68, Y65, and X71) to the Indicated Mineral Resource category. Shallow zinc and lead sulphides were intersected between 18 and 95 metres vertical depth and occurred as continuous, flat-lying, and relatively thin, Tabular-style mineralization. Prismatic-style mineralization, with more vertical continuity, was locally encountered within the Tabular-style mineralization.

Highlights Include:

  • Drill hole X71-22-PP-036 intersected 13.00 metres, grading 6.80% Zn and 2.58% Pb (9.38% Zn+Pb)
  • Drill hole X71-22-PP-040 intersected 12.00 metres, grading 25.80% Zn and 6.84% Pb (32.65% Zn+Pb)
  • Drill hole Y65-22-PP-009 intersected 6.00 metres, grading 12.87% Zn and 1.32% Pb (14.19% Zn+Pb)
  • Drill hole Y68-22-PP-019 intersected 6.00 metres, grading 9.94% Zn and 13.66% Pb (23.61% Zn+Pb)

Jeff Hussey, President & COO, commented: “We are pleased to report more positive definition drilling results as we prepare for the winter drilling campaign, expected to start in January 2023. Following the 2020 and 2022 PEA studies and further drilling, we will initiate the feasibility phase of the project in H2 2023. In parallel, we are continuing to advance the Environmental Assessment process which will continue into 2023.”

Table 1: Drill Hole Composites.

Hole Name

Zone

Deposit

From
To
Drill Width
True Width
Zn
Pb
ZN+PB
(m)
(m)
(m)
(m)
%
%
%
HG-22-PP-001**
Hgeol
X68 Area
65.00
66.00
1.00
0.97
6.25
0.73
6.98
HG-22-PP-003**
Hgeol
Y65 area
21.00
22.00
1.00
1.00
0.21
0.06
0.27
X71-22-PP-001
N1
X71
39.00
40.00
1.00
1.00
0.00
0.00
0.00
X71-22-PP-001A
N1
X71
94.20
95.30
1.10
1.04
0.46
0.04
0.50
X71-22-PP-002
N1
X71
52.00
53.00
1.00
1.00
0.33
0.01
0.35
X71-22-PP-003
N1
X71
52.00
53.00
1.00
1.00
6.53
1.80
8.33
X71-22-PP-004
N1
X71
52.00
53.00
1.00
1.00
4.85
1.57
6.42
X71-22-PP-005
N1
X71
65.15
66.50
1.35
1.35
11.90
1.71
13.60
X71-22-PP-005
N1
X71
47.00
53.00
6.00
6.00
4.90
5.40
10.30
X71-22-PP-006*
N1
X71
53.00
54.50
1.50
1.50
10.08
17.64
27.72
X71-22-PP-007
N1
X71
56.00
56.20
0.20
0.20
6.83
4.77
11.60
X71-22-PP-008
N1
X71
56.00
56.50
0.50
0.50
7.50
25.54
33.04
X71-22-PP-009
N1
X71
57.00
57.75
0.75
0.75
2.05
0.98
3.03
X71-22-PP-010
N1
X71
49.00
51.00
2.00
2.00
7.28
6.13
13.41
X71-22-PP-011
N1
X71
63.00
64.00
1.00
1.00
2.50
1.51
4.01
X71-22-PP-012
N1
X71
59.00
60.00
1.00
1.00
5.32
15.40
20.72
X71-22-PP-013
N1
X71
21.20
24.20
3.00
3.00
0.65
15.43
16.08
X71-22-PP-013
N1
X71
50.65
55.65
5.00
5.00
11.20
6.24
17.44
X71-22-PP-014
N1
X71
56.00
58.00
2.00
2.00
5.37
2.41
7.78
X71-22-PP-014
N1
X71
68.00
70.00
2.00
2.00
0.81
7.50
8.31
X71-22-PP-015
N1
X71
55.00
56.00
1.00
1.00
4.31
1.04
5.35
X71-22-PP-016
N1
X71
51.00
58.00
7.00
7.00
13.68
6.00
19.68
X71-22-PP-017
N1
X71
57.00
58.00
1.00
1.00
2.92
17.80
20.72
X71-22-PP-017
N1
X71
38.00
49.00
11.00
11.00
4.39
3.44
7.84
X71-22-PP-018
N1
X71
78.00
81.00
3.00
3.00
4.51
1.59
6.10
X71-22-PP-019
N1
X71
55.00
56.00
1.00
1.00
4.74
1.02
5.76
X71-22-PP-020
N1
X71
43.00
44.00
1.00
1.00
0.73
0.15
0.88
X71-22-PP-021
N1
X71
56.65
57.65
1.00
1.00
1.10
4.30
5.40
X71-22-PP-022
N1
X71
74.00
75.00
1.00
1.00
0.25
3.84
4.09
X71-22-PP-023
N1
X71
50.00
55.00
5.00
5.00
6.25
2.41
8.66
X71-22-PP-024
N1
X71
53.00
53.40
0.40
0.40
3.44
0.77
4.21
X71-22-PP-025
N1
X71
18.00
26.00
8.00
8.00
3.62
10.34
13.95
X71-22-PP-025
N1
X71
53.50
63.50
10.00
10.00
5.38
4.53
9.91
X71-22-PP-026
N1
X71
19.00
24.00
5.00
5.00
3.75
6.17
9.92
X71-22-PP-026
N1
X71
51.90
57.00
5.10
5.10
4.06
2.76
6.82
X71-22-PP-027
N1
X71
36.33
37.33
1.00
1.00
0.50
11.85
12.35
X71-22-PP-027
N1
X71
48.44
49.44
1.00
1.00
7.02
15.30
22.32
X71-22-PP-027
N1
X71
19.50
20.50
1.00
1.00
1.08
23.23
24.31
X71-22-PP-028
N1
X71
49.00
50.00
1.00
1.00
1.37
0.26
1.63
X71-22-PP-029
N1
X71
47.50
51.55
4.05
4.05
11.85
16.26
28.10
X71-22-PP-030
N1
X71
67.00
68.00
1.00
1.00
3.79
15.90
19.69
X71-22-PP-030
N1
X71
20.60
23.60
3.00
3.00
0.60
6.11
6.71
X71-22-PP-031
N1
X71
50.65
51.65
1.00
1.00
3.99
0.21
4.20
X71-22-PP-032
N1
X71
50.00
51.00
1.00
1.00
1.45
0.08
1.52
X71-22-PP-033
N1
X71
54.00
57.00
3.00
3.00
21.90
11.15
33.05
X71-22-PP-034
N1
X71
51.00
57.00
6.00
6.00
4.19
1.64
5.83
X71-22-PP-035
N1
X71
46.50
47.50
1.00
1.00
18.15
27.01
45.16
X71-22-PP-035
N1
X71
53.50
58.35
4.85
4.85
7.17
1.18
8.36
X71-22-PP-036
N1
X71
76.00
89.00
13.00
13.00
6.80
2.58
9.38
X71-22-PP-037
N1
X71
41.40
42.00
0.60
0.60
26.30
9.18
35.48
X71-22-PP-038
N1
X71
58.00
59.00
1.00
1.00
3.53
0.21
3.74
X71-22-PP-039
N1
X71
52.69
53.69
1.00
1.00
0.71
0.19
0.90
X71-22-PP-040
N1
X71
59.00
71.00
12.00
12.00
25.80
6.84
32.65
X71-22-PP-041
N1
X71
63.00
64.00
1.00
1.00
7.21
0.22
7.43
X71-22-PP-041
N1
X71
51.00
61.00
10.00
10.00
4.05
1.42
5.47
X71-22-PP-042
N1
X71
55.00
58.00
3.00
3.00
6.90
1.71
8.61
X71-22-PP-043
N1
X71
66.00
67.00
1.00
1.00
1.77
0.28
2.05
X71-22-PP-045
N1
X71
59.50
62.50
3.00
3.00
12.94
4.06
17.00
X71-22-PP-045
N1
X71
68.50
73.50
5.00
5.00
7.42
5.94
13.36
X71-22-PP-046
N1
X71
84.00
85.00
1.00
1.00
6.19
1.26
7.45
X71-22-PP-046
N1
X71
57.00
58.00
1.00
1.00
4.87
3.24
8.11
X71-22-PP-046
N1
X71
81.00
82.00
1.00
1.00
5.32
2.98
8.30
X71-22-PP-046
N1
X71
76.00
78.00
2.00
2.00
4.37
3.54
7.91
X71-22-PP-047
N1
X71
57.20
58.10
0.90
0.90
1.97
0.03
2.00
X71-22-PP-048
N1
X71
61.00
67.00
6.00
6.00
8.02
1.12
9.14
X71-22-PP-049
N1
X71
71.00
72.00
1.00
1.00
0.67
0.48
1.14
X71-22-PP-050
N1
X71
54.00
58.00
4.00
4.00
10.27
6.31
16.58
X71-22-PP-051*
N1
X71
55.00
58.00
3.00
3.00
8.98
0.35
9.33
X71-22-PP-052
N1
X71
53.00
54.00
1.00
1.00
4.23
4.71
8.94
X71-22-PP-053
N1
X71
49.00
50.00
1.00
1.00
0.44
0.06
0.50
X71-22-PP-054
N1
X71
68.00
69.00
1.00
1.00
1.05
0.54
1.59
X71-22-PP-055
N1
X71
51.00
53.00
2.00
2.00
8.93
4.56
13.49
X71-22-PP-056
N1
X71
52.00
53.00
1.00
1.00
1.73
0.12
1.85
Y65-22-PP-001
N1
Y65
18.00
19.00
1.00
1.00
13.10
1.87
14.97
Y65-22-PP-002
N1
Y65
22.00
23.00
1.00
1.00
0.52
0.99
1.51
Y65-22-PP-003
N1
Y65
23.00
24.00
1.00
1.00
11.30
0.08
11.38
Y65-22-PP-003
N1
Y65
29.00
31.00
2.00
2.00
6.30
3.49
9.79
Y65-22-PP-003
N1
Y65
40.00
43.00
3.00
3.00
21.50
4.75
26.25
Y65-22-PP-004
N1
Y65
24.00
25.00
1.00
1.00
0.79
0.59
1.37
Y65-22-PP-005
N1
Y65
27.00
31.00
4.00
4.00
16.63
8.00
24.62
Y65-22-PP-006
N1
Y65
22.00
23.00
1.00
1.00
13.85
1.01
14.86
Y65-22-PP-007
N1
Y65
27.00
29.00
2.00
2.00
15.72
15.09
30.81
Y65-22-PP-007
N1
Y65
31.00
34.00
3.00
3.00
4.63
0.68
5.32
Y65-22-PP-008
N1
Y65
35.00
36.00
1.00
1.00
5.18
1.05
6.23
Y65-22-PP-009*
N1
Y65
51.00
57.00
6.00
6.00
12.87
1.32
14.19
Y65-22-PP-010
N1
Y65
35.00
36.00
1.00
1.00
0.74
0.15
0.89
Y65-22-PP-011
N1
Y65
40.00
41.00
1.00
1.00
2.91
2.36
5.27
Y65-22-PP-012
N1
Y65
33.00
37.00
4.00
4.00
7.30
0.32
7.63
Y65-22-PP-013
N1
Y65
30.00
38.00
8.00
8.00
6.39
1.02
7.41
Y65-22-PP-014
N1
Y65
31.00
34.00
3.00
3.00
5.29
1.14
6.44
Y65-22-PP-015
N1
Y65
31.00
32.00
1.00
1.00
0.79
0.09
0.88
Y68-22-PP-003
N1
Y68
31.20
32.00
0.80
0.80
2.76
0.42
3.18
Y68-22-PP-004
N1
Y68
35.00
35.50
0.50
0.50
4.02
0.00
4.02
Y68-22-PP-006
N1
Y68
30.00
31.00
1.00
1.00
0.01
0.00
0.01
Y68-22-PP-007
N1
Y68
28.00
35.00
7.00
7.00
7.87
0.62
8.48
Y68-22-PP-008
N1
Y68
23.00
24.00
1.00
1.00
3.28
0.90
4.18
Y68-22-PP-009
N1
Y68
24.00
31.00
7.00
7.00
3.87
0.70
4.56
Y68-22-PP-010
N1
Y68
32.00
33.00
1.00
1.00
6.04
0.04
6.08
Y68-22-PP-012
N1
Y68
26.00
27.00
1.00
1.00
3.61
1.06
4.67
Y68-22-PP-013
N1
Y68
28.00
29.00
1.00
1.00
2.77
4.25
7.02
Y68-22-PP-013
N1
Y68
21.00
25.00
4.00
4.00
4.31
0.05
4.36
Y68-22-PP-014
N1
Y68
22.45
26.00
3.55
3.55
7.07
0.83
7.90
Y68-22-PP-019
N1
Y68
25.00
31.00
6.00
6.00
9.94
13.66
23.61
Y68-22-PP-021
N1
Y68
42.00
43.25
1.25
1.25
0.96
0.14
1.10
Y68-22-PP-022
N1
Y68
23.00
24.00
1.00
1.00
4.54
0.76
5.30
Y68-22-PP-023
N1
Y68
23.00
24.00
1.00
1.00
4.07
6.87
10.94
Y68-22-PP-024
N1
Y68
25.00
26.00
1.00
1.00
1.86
0.24
2.09
Y68-22-PP-025
N1
Y68
27.00
28.00
1.00
1.00
0.56
0.12
0.69
Y68-22-PP-027
N1
Y68
23.70
24.70
1.00
1.00
1.41
0.14
1.55
Y68-22-PP-028
N1
Y68
26.00
27.00
1.00
1.00
0.49
0.01
0.50
Y68-22-PP-030
N1
Y68
39.00
40.00
1.00
1.00
2.23
0.01
2.24
Y68-22-PP-031
N1
Y68
22.00
23.00
1.00
1.00
0.43
0.07
0.49
Y68-22-PP-032
N1
Y68
23.20
24.00
0.80
0.80
4.36
2.30
6.66
Y68-22-PP-032
N1
Y68
29.00
30.00
1.00
1.00
4.06
2.79
6.85
Y68-22-PP-034
N1
Y68
37.00
39.00
2.00
2.00
5.55
1.11
6.66
Y68-22-PP-035
N1
Y68
27.00
28.00
1.00
1.00
3.93
0.58
4.51
Y68-22-PP-037
N1
Y68
47.00
48.00
1.00
1.00
5.32
2.92
8.24
Y68-22-PP-037
N1
Y68
35.00
38.00
3.00
3.00
15.21
4.11
19.32
Y68-22-PP-045
N1
Y68
32.00
33.00
1.00
1.00
2.20
0.06
2.26

* Within deposit hydrogeological drill hole
** Off-deposit hydrogeological drill hole

Hydrogeological Program Update

Upcoming hydrogeological testing of some recent exploration drill holes will consist of 1) Profile Tracer Tests that measure water flow and conductivity of the bedrock stratigraphy within these drill holes and 2) injection tests to better understand the aquifer characteristics. These new datasets will be added to the hydrogeological modelling process as we prepare for the feasibility study phase of the Pine Point Project.

Qualified Person

Mr. Robin Adair is the Qualified Person and the Vice President of Exploration for Osisko Metals Incorporated. He is responsible for the technical data reported in this news release, and he is a Professional Geologist registered in the Northwest Territories.

Quality Assurance / Quality Control

Osisko Metals adheres to a strict QA/QC program for core handling, sampling, sample transportation, and analyses. Drill core samples from the Pine Point project area are securely transported to its core facility on site, where they were logged and sampled. Samples selected for assay are shipped to ALS Canada Ltd.'s preparation facility in Yellowknife. Pulps are analyzed at the ALS Canada Ltd. facility in North Vancouver, BC. All samples are analyzed by four acid digestion followed by both ICP-AES and ICP-MS for a multi-element suite with a 1% upper detection limit for base metals. Samples reporting over 1% for Zn and 1% for Pb are analyzed by assay grade, four acid digestion and ICPAES analysis with an upper detection limit of 30% and 20% respectively. Samples reporting Zn >30% and or Pb >20% are analyzed by traditional titration.

Table 2: Drill Hole Collar Locations (NAD83 (CSRS) Zone 11)

Hole Name
Zone
Deposit
Easting
Northing
Elev. (m)
Azm.
Dip
Length (m)
HG-22-PP-001**
N-1
X71-X68
626833.5
6749138.3
179.4
155
-75
81.0
HG-22-PP-003**
N-1
Y65-Z64
628935.3
6750030.9
181.4
0
-90
50.0
X71-22-PP-001
N-1
X71
625428.4
6748928.1
178.1
0
-90
60.0
X71-22-PP-001A
N-1
X71
625452.7
6748941.2
178.3
248
-70
124.0
X71-22-PP-002
N-1
X71
625460.7
6748925.1
178.5
0
-90
63.0
X71-22-PP-003
N-1
X71
625443.7
6748959.0
178.5
0
-90
65.0
X71-22-PP-004
N-1
X71
625421.2
6748973.4
178.6
0
-90
65.0
X71-22-PP-005
N-1
X71
625555.0
6748939.9
178.1
0
-90
72.0
X71-22-PP-006*
N-1
X71
625509.8
6748919.6
178.3
0
-90
81.0
X71-22-PP-007
N-1
X71
625494.2
6748954.3
178.1
0
-90
75.0
X71-22-PP-008
N-1
X71
625475.4
6748989.1
177.5
0
-90
69.0
X71-22-PP-009
N-1
X71
625501.4
6749038.1
178.1
0
-90
69.0
X71-22-PP-010
N-1
X71
625522.9
6748999.7
178.0
0
-90
75.0
X71-22-PP-011
N-1
X71
625550.1
6749047.9
177.8
0
-90
72.0
X71-22-PP-012
N-1
X71
625607.0
6748944.3
177.9
0
-90
75.0
X71-22-PP-013
N-1
X71
625588.8
6748979.3
177.9
0
-90
75.0
X71-22-PP-014
N-1
X71
625562.3
6749017.6
177.9
0
-90
75.0
X71-22-PP-015
N-1
X71
625592.9
6749054.4
177.8
0
-90
72.0
X71-22-PP-016
N-1
X71
625645.2
6748954.0
178.2
0
-90
66.0
X71-22-PP-017
N-1
X71
625624.2
6748987.7
178.0
0
-90
81.0
X71-22-PP-018
N-1
X71
625612.0
6749021.6
177.9
0
-90
84.0
X71-22-PP-019
N-1
X71
625630.2
6749070.8
177.8
0
-90
66.0
X71-22-PP-020
N-1
X71
625680.1
6748960.7
178.1
0
-90
66.0
X71-22-PP-021
N-1
X71
625665.5
6749002.2
178.0
0
-90
75.0
X71-22-PP-022
N-1
X71
625649.3
6749032.2
178.0
0
-90
81.0
X71-22-PP-023
N-1
X71
625674.3
6749079.2
177.8
0
-90
69.0
X71-22-PP-024
N-1
X71
625717.3
6748978.6
178.1
0
-90
72.0
X71-22-PP-025
N-1
X71
625705.1
6749013.5
178.2
0
-90
72.0
X71-22-PP-026
N-1
X71
625685.7
6749047.4
177.9
0
-90
81.0
X71-22-PP-027
N-1
X71
625712.0
6749082.8
177.9
0
-90
65.0
X71-22-PP-028
N-1
X71
625760.9
6748981.2
178.4
0
-90
72.0
X71-22-PP-029
N-1
X71
625746.9
6749014.8
178.2
0
-90
75.0
X71-22-PP-030
N-1
X71
625729.8
6749048.7
178.0
0
-90
75.0
X71-22-PP-031
N-1
X71
625736.4
6749121.5
177.9
0
-90
60.0
X71-22-PP-032
N-1
X71
625778.8
6749044.5
178.1
0
-90
69.0
X71-22-PP-033
N-1
X71
625760.3
6749081.4
178.1
0
-90
69.0
X71-22-PP-034
N-1
X71
625812.0
6749058.3
178.0
0
-90
72.0
X71-22-PP-035
N-1
X71
625788.3
6749096.1
177.6
0
-90
72.0
X71-22-PP-036
N-1
X71
625769.3
6749152.0
177.7
0
-90
96.0
X71-22-PP-037
N-1
X71
625780.7
6749179.5
177.6
0
-90
72.0
X71-22-PP-038
N-1
X71
625807.3
6749147.0
177.8
0
-90
69.0
X71-22-PP-039
N-1
X71
625885.8
6749002.9
178.1
0
-90
75.0
X71-22-PP-040
N-1
X71
625866.6
6749039.9
177.8
0
-90
78.0
X71-22-PP-041
N-1
X71
625848.1
6749075.7
177.9
0
-90
75.0
X71-22-PP-042
N-1
X71
625828.1
6749105.3
177.8
0
-90
72.0
X71-22-PP-043
N-1
X71
625839.1
6749168.1
177.5
0
-90
81.0
X71-22-PP-045
N-1
X71
625878.6
6749091.4
177.6
0
-90
81.0
X71-22-PP-046
N-1
X71
625857.8
6749129.8
177.3
0
-90
96.0
X71-22-PP-047
N-1
X71
625863.9
6749195.0
177.5
0
-90
60.0
X71-22-PP-048
N-1
X71
625941.8
6749050.7
177.8
0
-90
72.0
X71-22-PP-049
N-1
X71
625928.5
6749082.7
177.8
0
-90
75.0
X71-22-PP-050
N-1
X71
625912.7
6749118.9
177.3
0
-90
72.0
X71-22-PP-051*
N-1
X71
625892.1
6749155.8
178.3
0
-90
79.5
X71-22-PP-052
N-1
X71
625912.7
6749204.5
177.7
0
-90
72.0
X71-22-PP-053
N-1
X71
625982.9
6749064.5
178.1
0
-90
72.0
X71-22-PP-054
N-1
X71
625963.5
6749089.5
177.8
0
-90
75.0
X71-22-PP-055
N-1
X71
625946.3
6749128.4
177.8
0
-90
72.0
X71-22-PP-056
N-1
X71
625922.8
6749171.1
177.1
0
-90
66.0
Y65-22-PP-001
N-1
Y65
628783.2
6750150.0
178.9
0
-90
51.0
Y65-22-PP-002
N-1
Y65
628710.8
6750201.0
178.6
0
-90
42.0
Y65-22-PP-003
N-1
Y65
628691.1
6750160.2
178.9
0
-90
45.0
Y65-22-PP-004
N-1
Y65
628674.1
6750109.7
179.1
0
-90
30.0
Y65-22-PP-005
N-1
Y65
628660.9
6750137.4
178.9
0
-90
36.0
Y65-22-PP-006
N-1
Y65
628640.0
6750088.4
179.0
0
-90
33.0
Y65-22-PP-007
N-1
Y65
628619.6
6750122.3
178.9
0
-90
39.0
Y65-22-PP-008
N-1
Y65
628587.0
6750100.0
178.7
0
-90
39.0
Y65-22-PP-009*
N-1
Y65
628536.2
6750112.5
178.8
0
-90
61.0
Y65-22-PP-010
N-1
Y65
628549.3
6750087.7
179.0
0
-90
45.0
Y65-22-PP-011
N-1
Y65
628523.8
6750050.6
179.5
0
-90
43.0
Y65-22-PP-012
N-1
Y65
628486.7
6750042.4
179.4
0
-90
39.0
Y65-22-PP-013
N-1
Y65
628440.6
6750046.4
179.3
0
-90
54.0
Y65-22-PP-014
N-1
Y65
628446.4
6750105.8
178.9
0
-90
44.0
Y65-22-PP-015
N-1
Y65
628412.5
6750020.4
179.2
0
-90
39.0
Y68-22-PP-003
N-1
Y68
627410.9
6749681.8
178.9
0
-90
39.0
Y68-22-PP-004
N-1
Y68
627382.7
6749660.6
178.9
0
-90
39.0
Y68-22-PP-006
N-1
Y68
627386.1
6749628.6
178.9
0
-90
36.0
Y68-22-PP-007
N-1
Y68
627434.1
6749645.8
179.3
0
-90
39.0
Y68-22-PP-008
N-1
Y68
627445.8
6749605.0
179.1
0
-90
32.0
Y68-22-PP-009
N-1
Y68
627467.8
6749649.3
179.1
0
-90
48.0
Y68-22-PP-010
N-1
Y68
627452.6
6749681.4
178.9
0
-90
42.0
Y68-22-PP-012
N-1
Y68
627550.8
6749675.2
179.1
0
-90
35.0
Y68-22-PP-013
N-1
Y68
627527.9
6749704.5
179.2
0
-90
33.0
Y68-22-PP-014
N-1
Y68
627579.7
6749700.5
179.1
0
-90
30.0
Y68-22-PP-019
N-1
Y68
627646.3
6749760.8
179.1
0
-90
51.0
Y68-22-PP-021
N-1
Y68
627664.5
6749711.4
179.3
0
-90
48.0
Y68-22-PP-022
N-1
Y68
627699.5
6749736.4
179.3
0
-90
39.0
Y68-22-PP-023
N-1
Y68
627678.8
6749771.3
179.2
0
-90
45.0
Y68-22-PP-024
N-1
Y68
627714.3
6749779.0
179.2
0
-90
45.0
Y68-22-PP-025
N-1
Y68
627640.2
6749836.4
178.9
0
-90
45.0
Y68-22-PP-027
N-1
Y68
627659.3
6749809.8
179.2
0
-90
39.0
Y68-22-PP-028
N-1
Y68
627695.0
6749849.0
179.2
0
-90
42.0
Y68-22-PP-030
N-1
Y68
627739.2
6749813.8
179.2
0
-90
45.0
Y68-22-PP-031
N-1
Y68
627754.7
6749708.1
179.3
0
-90
30.0
Y68-22-PP-032
N-1
Y68
627766.4
6749733.5
179.4
0
-90
30.0
Y68-22-PP-034
N-1
Y68
627754.5
6749779.7
179.3
0
-90
45.0
Y68-22-PP-035
N-1
Y68
627813.3
6749747.4
179.3
0
-90
33.0
Y68-22-PP-037
N-1
Y68
627827.4
6749870.0
178.9
0
-90
54.0
Y68-22-PP-045
N-1
Y68
628156.1
6749905.5
179.4
0
-90
40.0

* Within deposit hydrogeological drill hole
** Off-deposit hydrogeological drill hole

About Osisko Metals

Osisko Metals Incorporated is a Canadian exploration and development company creating value in the critical metals space. The Company controls one of Canada’s premier past-producing zinc mining camps, the Pine Point Project, located in the Northwest Territories for which the 2022 PEA has indicated an after-tax NPV of $603M and an IRR of 25% is based on the current Mineral Resource Estimates that are amenable to open pit and shallow underground mining and consist of 15.7Mt grading 5.55% ZnEq of Indicated Mineral Resources and 47.2Mt grading 5.94% ZnEq of Inferred Mineral Resources. Please refer to the technical report entitled “Preliminary Economic Assessment, Pine Point Project, Hay River, Northwest Territories, Canada” dated July 30, which has been filed on SEDAR. The Pine Point Project is located on the south shore of Great Slave Lake in the Northwest Territories, near infrastructure, and paved highway access, and also has an electrical substation as well as 100 kilometres of viable haulage roads already in place.

The Company is also in the process of acquiring, from Glencore Canada, a 100% interest in the past-producing Gaspé Copper Mine, located near Murdochville in the Gaspé peninsula of Quebec. The Company is currently focused on resource evaluation of the Mount Copper Expansion Project that hosts a NI43-101 Inferred Resource of 456Mt grading 0.31% Cu (see April 28, 2022 press release). Gaspé Copper hosts the largest undeveloped copper resource in Eastern North America, strategically located near existing infrastructure in the mining-friendly province of Quebec.

For further information on this press release, visit www.osiskometals.com or contact:

Robert Wares, CEO Osisko Metals Incorporated

Email: info@osiskometals.com
www.osiskometals.com

Cautionary Statement on Forward-Looking Information

This news release contains "forward-looking information" within the meaning of applicable Canadian securities legislation based on expectations, estimates and projections as at the date of this news release. Any statement that involves predictions, expectations, interpretations, beliefs, plans, projections, objectives, assumptions, future events or performance are not statements of historical fact and constitute forward-looking information. This news release may contain forward-looking information pertaining to the Pine Point Project, including, among other things, the results of the PEA and the IRR, NPV and estimated costs, production, production rate and mine life; the expectation that the Pine Point Project will be an robust operation and profitable at a variety of prices and assumptions; the expected high quality of the Pine Point concentrates; the potential impact of the Pine Point Project in the Northwest Territories, including but not limited to the potential generation of tax revenue and contribution of jobs; and the Pine Point Project having the potential for mineral resource expansion and new discoveries. Forward-looking information is not a guarantee of future performance and is based upon a number of estimates and assumptions of management, in light of management’s experience and perception of trends, current conditions and expected developments, as well as other factors that management believes to be relevant and reasonable in the circumstances, including, without limitation, assumptions about: favourable equity and debt capital markets; the ability to raise additional capital on reasonable terms to advance the development of its projects and pursue planned exploration; future prices of zinc and lead; the timing and results of exploration and drilling programs; the accuracy of mineral resource estimates; production costs; operating conditions being favourable; political and regulatory stability; the receipt of governmental and third party approvals; licenses and permits being received on favourable terms; sustained labour stability; stability in financial and capital markets; availability of equipment; and positive relations with local groups. Forward-looking information involves risks, uncertainties and other factors that could cause actual events, results, performance, prospects and opportunities to differ materially from those expressed or implied by such forward-looking information. Factors that could cause actual results to differ materially from such forward-looking information are set out in the Company’s public documents filed at www.sedar.com . Although the Company believes that the assumptions and factors used in preparing the forward-looking information in this news release are reasonable, undue reliance should not be placed on such information, which only applies as of the date of this news release, and no assurance can be given that such events will occur in the disclosed time frames or at all. The Company disclaims any intention or obligation to update or revise any forward-looking information, whether as a result of new information, future events or otherwise, other than as required by law.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSXV) accept responsibility for the adequacy or accuracy of this news release.

A photo accompanying this announcement is available at https://www.globenewswire.com/NewsRoom/AttachmentNg/9b0fcf64-357f-4e48-9c6b-c9a77d770ea2


Stock Information

Company Name: Osisko Metals
Stock Symbol: OMZNF
Market: OTC
Website: osiskometals.com

Menu

OMZNF OMZNF Quote OMZNF Short OMZNF News OMZNF Articles OMZNF Message Board
Get OMZNF Alerts

News, Short Squeeze, Breakout and More Instantly...