Twitter

Link your Twitter Account to Market Wire News


When you linking your Twitter Account Market Wire News Trending Stocks news and your Portfolio Stocks News will automatically tweet from your Twitter account.


Be alerted of any news about your stocks and see what other stocks are trending.



home / news releases / OM:CC - Osisko Metals Announces Additional Drill Results From Pine Point With Up to 13.00 Metres Grading 11.11% Zinc and 1.44% Lead


OM:CC - Osisko Metals Announces Additional Drill Results From Pine Point With Up to 13.00 Metres Grading 11.11% Zinc and 1.44% Lead

MONTREAL, Oct. 12, 2023 (GLOBE NEWSWIRE) -- Osisko Metals Incorporated (the " Company " or " Osisko Metals ") ( TSX-V: OM ; OTCQX: OMZNF ; FRANKFURT: 0B51 ) is pleased to announce additional assay results from its 2023 drilling program at the Pine Point Project, located in the Northwest Territories, Canada. The reported results are from the M67, L65, and M62 deposits. The M67 deposit consists of local prismatic development within a tabular apron of mineralization, while L65 and M62 are both tabular-style deposits in the Central Zone (C1). Drilling between M67 and L65 connected the tabular-style mineralization between these deposits over a strike length of 200 metres in an area that was not included in the 2022 PEA Mineral Resource Estimation (MRE).

Drilling was conducted as part of the Pine Point Mining Limited (“PPML”) Joint Venture’s larger 2023 definition drilling program designed to achieve an average drill spacing of approximately 30 metres within the currently modelled mineral resources reported in the 2022 PEA. This spacing is intended to upgrade the resources presently classified as Inferred to the Indicated category.

Drill Hole Assay Composite Highlights:

  • L65-23-PP-051: 11.00 metres, grading 3.64% Zn and 2.44% Pb (6.07% Zn+Pb)
  • M62-23-PP-015: 8.00 metres, grading 7.44% Zn and 0.01% Pb (7.46% Zn+Pb)
  • M67-23-PP-002: 10.00 metres, grading 8.78% Zn and 1.18% Pb (9.96% Zn+Pb)
  • M67-23-PP-004: 7.00 metres, grading 14.25% Zn and 3.37% Pb (17.62% Zn+Pb)
  • M67-23-PP-013 : 13.00 metres, grading 11.11% Zn and 1.44% Pb (12.55% Zn+Pb)
  • M67-23-PP-015: 12.00 metres, grading 11.92% Zn and 4.91% Pb (16.83% Zn+Pb)
  • M67-23-PP-027: 8.00 metres, grading 9.16% Zn and 3.92% Pb (13.08% Zn+Pb)

All mineralization occurs near surface between 51.00 and 87.00 metres vertical depth from surface and occurs as tabular-style semi-massive to massive colloform sphalerite and galena associated with intensely altered hydrothermal dolomite and limestone.

Robert Wares, CEO and Chairman of the Board, commented: “These drill results have met expectations when compared to previous drilling and the continuity between the M67 and L65 deposits has been confirmed and is welcomed news. This new data will be incorporated into the mineral resource update planned for later this year. We also look forward to launching the feasibility study in the new year.”

Table 1: Drill Hole Assay Composites.

Hole Name

Zone

Deposit

From
To
Drill
Width
True
Width
Zn
Pb
Zn+Pb
(m)
(m)
(m)
(m)
%
%
%
L65-23-PP-001
C1
L65
65.00
68.00
3.00
3.00
5.63
3.52
9.14
L65-23-PP-002
C1
L65
66.00
68.00
2.00
2.00
1.81
1.62
3.43
L65-23-PP-003A
C1
L65
60.00
72.00
12.00
11.97
5.31
1.23
6.54
L65-23-PP-004
C1
L65
66.00
68.00
2.00
2.00
5.49
0.33
5.82
L65-23-PP-005
C1
L65
63.00
64.00
1.00
1.00
6.61
5.15
11.76
L65-23-PP-006
C1
L65
66.00
66.70
0.70
0.70
8.06
0.06
8.12
L65-23-PP-008
C1
L65
57.00
58.00
1.00
1.00
2.47
0.86
3.33
L65-23-PP-009
C1
L65
59.00
65.00
6.00
5.99
2.23
0.24
2.46
L65-23-PP-010
C1
L65
67.00
68.00
1.00
1.00
1.86
0.47
2.32
L65-23-PP-011
C1
L65
65.00
67.00
2.00
1.99
3.73
2.34
6.08
L65-23-PP-012
C1
L65
55.00
57.00
2.00
2.00
2.74
0.56
3.29
L65-23-PP-013
C1
L65
58.00
59.00
1.00
1.00
1.59
1.08
2.67
and
C1
L65
63.00
65.00
2.00
2.00
17.39
3.19
20.58
L65-23-PP-014
C1
L65
55.00
56.00
1.00
1.00
2.58
2.31
4.89
L65-23-PP-015
C1
L65
51.00
52.00
1.00
1.00
8.06
0.01
8.07
L65-23-PP-016
C1
L65
62.00
65.00
3.00
2.99
5.65
1.87
7.52
and
C1
L65
67.00
68.00
1.00
1.00
0.25
2.39
2.64
L65-23-PP-017
C1
L65
66.00
69.00
3.00
3.00
6.94
0.74
7.68
L65-23-PP-019
C1
L65
62.00
63.00
1.00
1.00
0.63
1.44
2.06
and
C1
L65
65.00
67.00
2.00
2.00
2.25
3.23
5.48
L65-23-PP-020
C1
L65
64.00
68.00
4.00
3.99
3.38
2.07
5.45
L65-23-PP-021
C1
L65
64.00
67.00
3.00
3.00
2.50
2.16
4.65
and
C1
L65
69.00
73.00
4.00
3.99
3.60
0.98
4.58
L65-23-PP-022
C1
L65
68.00
74.00
6.00
5.99
8.73
1.57
10.30
L65-23-PP-023
C1
L65
64.00
65.00
1.00
1.00
2.30
1.17
3.47
and
C1
L65
68.00
69.00
1.00
1.00
3.02
2.41
5.43
L65-23-PP-024
C1
L65
59.00
65.00
6.00
5.99
4.36
1.24
5.61
L65-23-PP-025
C1
L65
59.00
62.00
3.00
2.99
6.00
15.25
21.25
L65-23-PP-027
C1
L65
58.00
63.00
5.00
4.99
1.77
0.78
2.56
L65-23-PP-029
C1
L65
58.80
59.50
0.70
0.70
3.56
7.74
11.30
L65-23-PP-030
C1
L65
63.00
64.00
1.00
1.00
6.58
0.16
6.74
L65-23-PP-032
C1
L65
52.00
54.00
2.00
2.00
3.94
0.05
3.99
and
C1
L65
59.00
62.00
3.00
2.99
3.02
1.64
4.66
L65-23-PP-033
C1
L65
62.00
66.00
4.00
3.99
5.78
1.70
7.48
L65-23-PP-034
C1
L65
67.00
70.00
3.00
3.00
3.30
1.47
4.77
and
C1
L65
72.00
73.00
1.00
1.00
8.26
3.77
12.03
L65-23-PP-035
C1
L65
63.00
67.00
4.00
3.99
1.87
2.10
3.97
L65-23-PP-036
C1
L65
59.00
60.00
1.00
1.00
4.77
0.08
4.85
and
C1
L65
62.00
66.00
4.00
3.99
7.70
2.07
9.77
and
C1
L65
70.00
72.00
2.00
2.00
5.85
1.52
7.37
L65-23-PP-037
C1
L65
61.00
63.00
2.00
1.99
11.31
2.51
13.82
and
C1
L65
65.00
66.00
1.00
1.00
7.99
0.08
8.07
L65-23-PP-038
C1
L65
57.00
59.00
2.00
2.00
11.54
2.75
14.29
L65-23-PP-041
C1
L65
62.00
67.00
5.00
4.99
5.83
2.82
8.64
and
C1
L65
72.00
73.00
1.00
1.00
2.26
0.07
2.33
L65-23-PP-042
C1
L65
76.00
80.00
4.00
3.99
5.90
1.04
6.94
and
C1
L65
82.00
84.00
2.00
1.99
0.83
1.79
2.62
L65-23-PP-049
C1
L65
81.00
82.00
1.00
1.00
3.12
0.46
3.58
L65-23-PP-050
C1
L65
74.00
77.00
3.00
3.00
6.49
2.38
8.87
and
C1
L65
81.00
87.00
6.00
5.99
9.52
1.46
10.99
L65-23-PP-051
C1
L65
67.00
78.00
11.00
10.96
3.64
2.44
6.07
and
C1
L65
82.00
83.00
1.00
1.00
0.18
3.16
3.34
L65-23-PP-052
C1
L65
66.00
67.50
1.50
1.50
28.06
4.24
32.30
and
C1
L65
70.00
71.00
1.00
1.00
3.77
0.09
3.86
L65-23-PP-053
C1
L65
68.00
71.00
3.00
3.00
4.26
0.86
5.11
L65-23-PP-056
C1
L65
68.00
69.00
1.00
1.00
3.53
0.76
4.29
L65-23-PP-057
C1
L65
64.50
68.00
3.50
3.50
3.75
3.45
7.20
and
C1
L65
71.00
75.00
4.00
4.00
6.32
0.69
7.01
L65-23-PP-058
C1
L65
65.00
67.00
2.00
2.00
1.75
0.58
2.33
L65-23-PP-059
C1
L65
55.00
56.00
1.00
1.00
2.38
1.50
3.88
L65-23-PP-060
C1
L65
56.00
57.00
1.00
1.00
1.40
0.63
2.02
L65-23-PP-062
C1
L65
52.00
56.00
4.00
4.00
10.10
7.00
17.10
L65-23-PP-063
C1
L65
67.00
68.00
1.00
1.00
6.36
1.79
8.15
and
C1
L65
70.00
72.00
2.00
2.00
2.85
2.91
5.76
M62-23-PP-001
C1
M62
63.00
65.00
2.00
2.00
9.66
4.68
14.34
M62-23-PP-003
C1
M62
53.60
54.60
1.00
1.00
21.70
12.90
34.60
and
C1
M62
57.00
58.00
1.00
1.00
3.61
0.13
3.74
M62-23-PP-004
C1
M62
53.00
54.00
1.00
1.00
10.65
26.13
36.78
M62-23-PP-006B
C1
M62
56.00
58.00
2.00
2.00
2.55
0.71
3.26
and
C1
M62
61.00
62.00
1.00
1.00
4.57
0.42
4.99
M62-23-PP-007B
C1
M62
57.00
58.00
1.00
1.00
5.22
0.61
5.83
M62-23-PP-008B
C1
M62
57.00
58.00
1.00
1.00
12.85
0.94
13.79
M62-23-PP-009
C1
M62
59.00
61.00
2.00
2.00
6.68
1.97
8.65
M62-23-PP-010
C1
M62
59.00
60.00
1.00
1.00
5.28
0.01
5.29
M62-23-PP-011
C1
M62
58.00
62.00
4.00
3.99
7.00
1.82
8.81
and
C1
M62
65.00
67.00
2.00
2.00
4.35
0.30
4.65
M62-23-PP-012
C1
M62
59.50
65.00
5.50
5.50
9.52
2.89
12.40
M62-23-PP-013
C1
M62
65.00
72.00
7.00
6.99
4.23
0.06
4.29
M62-23-PP-014B
C1
M62
75.00
77.00
2.00
2.00
6.29
0.75
7.04
M62-23-PP-015
C1
M62
60.00
67.00
7.00
6.99
5.76
0.62
6.38
and
C1
M62
69.00
77.00
8.00
7.99
7.44
0.01
7.46
M62-23-PP-016
C1
M62
65.00
68.00
3.00
3.00
9.79
0.02
9.81
M62-23-PP-017
C1
M62
63.00
67.00
4.00
3.99
18.72
0.19
18.91
M62-23-PP-018
C1
M62
63.00
67.00
4.00
3.99
24.06
5.40
29.46
and
C1
M62
81.00
84.00
3.00
3.00
8.99
1.17
10.17
M62-23-PP-020
C1
M62
60.00
63.00
3.00
3.00
5.95
0.45
6.40
M67-23-PP-001
C1
M67
53.00
57.50
4.50
4.50
3.42
0.01
3.42
and
C1
M67
62.00
63.00
1.00
1.00
3.78
1.16
4.93
M67-23-PP-002
C1
M67
52.75
55.00
2.25
2.25
3.46
0.00
3.47
and
C1
M67
61.00
71.00
10.00
9.98
8.78
1.18
9.96
M67-23-PP-003
C1
M67
64.00
67.00
3.00
2.99
3.11
1.68
4.79
and
C1
M67
70.00
71.40
1.40
1.40
0.91
1.16
2.07
and
C1
M67
73.00
74.00
1.00
1.00
4.03
0.15
4.18
M67-23-PP-004
C1
M67
61.00
68.00
7.00
6.98
14.25
3.37
17.62
M67-23-PP-005
C1
M67
63.00
64.00
1.00
1.00
7.19
1.83
9.02
and
C1
M67
75.00
76.00
1.00
1.00
3.66
0.58
4.24
M67-23-PP-007
C1
M67
63.00
67.00
4.00
3.99
2.90
1.27
4.16
and
C1
M67
70.80
72.00
1.20
1.20
15.25
2.52
17.77
M67-23-PP-008
C1
M67
74.00
75.00
1.00
1.00
1.91
0.22
2.13
M67-23-PP-011
C1
M67
69.00
71.00
2.00
2.00
6.18
0.33
6.51
M67-23-PP-013
C1
M67
60.00
73.00
13.00
12.96
11.11
1.44
12.55
M67-23-PP-014
C1
M67
69.00
72.00
3.00
3.00
6.76
4.00
10.76
M67-23-PP-015
C1
M67
63.00
75.00
12.00
11.97
11.92
4.91
16.83
M67-23-PP-017
C1
M67
70.00
73.00
3.00
3.00
4.18
5.66
9.84
M67-23-PP-018
C1
M67
72.00
74.00
2.00
2.00
8.21
0.30
8.51
M67-23-PP-019
C1
M67
72.00
76.00
4.00
4.00
1.40
1.22
2.62
M67-23-PP-020
C1
M67
71.00
74.00
3.00
2.99
4.18
1.00
5.18
M67-23-PP-021
C1
M67
69.00
73.00
4.00
4.00
7.53
3.53
11.06
and
C1
M67
78.00
82.00
4.00
4.00
8.07
15.55
23.62
M67-23-PP-022
C1
M67
69.00
74.35
5.35
5.33
4.83
0.89
5.72
and
C1
M67
76.00
77.00
1.00
1.00
13.95
10.70
24.65
M67-23-PP-023
C1
M67
67.00
73.00
6.00
5.98
8.31
0.56
8.87
M67-23-PP-024
C1
M67
65.30
70.00
4.70
4.70
20.53
1.25
21.78
M67-23-PP-025
C1
M67
71.00
72.00
1.00
1.00
0.15
1.96
2.10
M67-23-PP-026
C1
M67
75.00
76.00
1.00
1.00
1.95
0.58
2.53
M67-23-PP-027
C1
M67
55.00
58.00
3.00
2.99
2.81
0.03
2.84
and
C1
M67
61.00
69.00
8.00
7.96
9.16
3.92
13.08
M67-23-PP-028
C1
M67
59.00
60.00
1.00
1.00
1.25
0.77
2.02
and
C1
M67
63.00
66.00
3.00
3.00
4.28
0.21
4.49
M67-23-PP-029
C1
M67
63.00
66.00
3.00
2.99
2.10
1.32
3.41
M67-23-PP-030
C1
M67
61.00
66.00
5.00
4.99
5.20
4.48
9.68

Drill holes not reported in this table with a collar location tabulated in Table 2 contained no significant assay results.

Qualified Person

Mr. Robin Adair is the Qualified Person and the Senior Technical Advisor for Pine Point Mining Limited. He is responsible for the technical data reported in this news release and is a Professional Geologist registered in the Northwest Territories.

Quality Assurance / Quality Control

Osisko Metals adheres to a strict QA/QC program for core handling, sampling, sample transportation, and analyses. Drill core samples from the Pine Point project area are securely transported to its core facility on-site, where they are logged and sampled. Samples selected for assay are shipped to ALS Canada Ltd.'s preparation facility in Yellowknife. Pulps are analyzed at the ALS Canada Ltd. facility in North Vancouver, BC. All samples are analyzed by four acid digestion followed by both ICP-AES and ICP-MS for a multi-element suite with a 1% upper detection limit for base metals. Samples reporting over 1% for Zn and 1% for Pb are analyzed by assay grade, four acid digestion, and ICP-AES analysis with an upper detection limit of 30% and 20%, respectively. Samples with Zn >30% and or Pb >20% are analyzed by traditional titration.

Table 2: Drill Hole Collar Locations (NAD83 (CSRS) Zone 11).

Hole Name
Zone
Deposit
Easting
Northing
Elev. (m)
Azm.
Dip
Length (m)
L65-23-PP-001
C1
L65
628205.5
6743688.9
214.7
0
-90
78
L65-23-PP-002
C1
L65
628247.0
6743666.4
214.9
0
-90
90
L65-23-PP-003
C1
L65
628235.7
6743691.6
214.8
0
-90
18
L65-23-PP-003A
C1
L65
628235.7
6743691.6
214.8
0
-90
75
L65-23-PP-004
C1
L65
628226.7
6743709.4
214.7
0
-90
69
L65-23-PP-005
C1
L65
628197.6
6743719.3
214.4
0
-90
75
L65-23-PP-006
C1
L65
628157.9
6743717.7
214.2
0
-90
90
L65-23-PP-007
C1
L65
628146.3
6743742.1
214.1
0
-90
90
L65-23-PP-008
C1
L65
628165.1
6743772.4
213.9
0
-90
90
L65-23-PP-009
C1
L65
628175.3
6743750.2
214.1
0
-90
90
L65-23-PP-010
C1
L65
628184.3
6743730.9
214.3
0
-90
90
L65-23-PP-011
C1
L65
628214.6
6743738.0
214.4
0
-90
90
L65-23-PP-012
C1
L65
628203.5
6743762.0
214.2
0
-90
78
L65-23-PP-013
C1
L65
628193.0
6743785.6
214.1
0
-90
90
L65-23-PP-014
C1
L65
628224.5
6743784.5
214.3
0
-90
90
L65-23-PP-015
C1
L65
628238.0
6743759.5
214.5
0
-90
66
L65-23-PP-016
C1
L65
628248.4
6743737.6
214.8
0
-90
90
L65-23-PP-017
C1
L65
628256.9
6743718.6
214.9
0
-90
72
L65-23-PP-018
C1
L65
628276.0
6743677.3
215.0
0
-90
90
L65-23-PP-019
C1
L65
628304.6
6743683.5
215.1
0
-90
92
L65-23-PP-020
C1
L65
628332.0
6743697.8
215.2
0
-90
92
L65-23-PP-021
C1
L65
628294.8
6743707.6
215.0
0
-90
92
L65-23-PP-022
C1
L65
628324.0
6743718.7
215.3
0
-90
92
L65-23-PP-023
C1
L65
628284.9
6743730.5
215.0
0
-90
92
L65-23-PP-024
C1
L65
628274.1
6743752.0
214.8
0
-90
92
L65-23-PP-025
C1
L65
628264.7
6743772.6
214.6
0
-90
95
L65-23-PP-026
C1
L65
628255.6
6743793.2
214.5
0
-90
92
L65-23-PP-027
C1
L65
628279.3
6743811.6
214.9
0
-90
90
L65-23-PP-028
C1
L65
628307.4
6743822.1
215.1
0
-90
92
L65-23-PP-029
C1
L65
628290.7
6743785.8
214.8
0
-90
92
L65-23-PP-030
C1
L65
628302.6
6743764.2
214.6
0
-90
71
L65-23-PP-031
C1
L65
628319.9
6743795.5
215.2
0
-90
90
L65-23-PP-032
C1
L65
628329.7
6743774.9
215.0
0
-90
92
L65-23-PP-033
C1
L65
628313.4
6743738.4
215.1
0
-90
92
L65-23-PP-034
C1
L65
628350.1
6743731.1
215.3
0
-90
91
L65-23-PP-035
C1
L65
628339.6
6743752.3
215.0
0
-90
76
L65-23-PP-036
C1
L65
628358.5
6743784.1
215.3
0
-90
75
L65-23-PP-037
C1
L65
628385.0
6743781.7
215.6
0
-90
73
L65-23-PP-038
C1
L65
628352.1
6743813.4
215.4
0
-90
69
L65-23-PP-039
C1
L65
628335.3
6743833.5
215.3
0
-90
41
L65-23-PP-039B
C1
L65
628335.3
6743833.5
215.3
0
-90
71
L65-23-PP-040
C1
L65
628356.6
6743847.2
215.2
0
-90
74
L65-23-PP-041
C1
L65
628398.8
6743841.4
215.8
0
-90
76
L65-23-PP-042
C1
L65
628390.8
6743861.0
215.5
0
-90
87
L65-23-PP-043
C1
L65
628368.8
6743867.5
215.1
0
-90
82
L65-23-PP-044
C1
L65
628390.8
6743877.7
215.5
0
-90
91
L65-23-PP-045
C1
L65
628338.0
6743898.5
214.4
0
-90
82
L65-23-PP-046
C1
L65
628363.5
6743911.5
214.4
0
-90
85
L65-23-PP-047
C1
L65
628374.5
6743935.3
214.4
0
-90
82
L65-23-PP-048
C1
L65
628390.8
6743917.8
214.8
0
-90
88
L65-23-PP-049
C1
L65
628412.7
6743935.2
214.8
0
-90
85
L65-23-PP-050
C1
L65
628406.3
6743895.4
215.5
0
-90
97
L65-23-PP-051
C1
L65
628445.5
6743869.9
216.3
0
-90
91
L65-23-PP-052
C1
L65
628527.1
6743955.2
216.2
0
-90
79
L65-23-PP-053
C1
L65
628519.5
6743982.6
215.3
0
-90
79
L65-23-PP-054
C1
L65
628546.5
6744003.0
215.2
0
-90
79
L65-23-PP-055
C1
L65
628567.3
6743990.6
215.8
0
-90
64
L65-23-PP-056
C1
L65
628594.6
6743973.7
217.1
0
-90
79
L65-23-PP-057
C1
L65
628820.4
6743999.3
217.4
0
-90
83
L65-23-PP-058
C1
L65
628846.3
6744003.4
217.1
0
-90
77
L65-23-PP-059
C1
L65
628681.7
6744175.6
213.6
0
-90
65
L65-23-PP-060
C1
L65
628710.2
6744206.1
213.5
0
-90
74
L65-23-PP-061
C1
L65
628695.1
6744229.2
213.4
0
-90
71.1
L65-23-PP-062
C1
L65
628665.0
6744219.1
213.4
0
-90
68
L65-23-PP-063
C1
L65
628229.3
6743658.0
214.6
0
-90
78
M62-23-PP-001
C1
M62
630064.7
6744825.8
216.2
0
-90
88
M62-23-PP-002
C1
M62
630066.4
6744800.9
216.6
0
-90
58
M62-23-PP-003
C1
M62
630002.5
6744774.6
216.1
0
-90
67
M62-23-PP-004
C1
M62
629975.6
6744791.7
216.1
0
-90
61
M62-23-PP-005*
C1
M62
629867.6
6744775.4
215.5
0
-90
57
M62-23-PP-006
C1
M62
629844.0
6744758.1
215.7
0
-90
23
M62-23-PP-006B
C1
M62
629844.0
6744758.1
215.7
0
-90
63
M62-23-PP-007
C1
M62
629815.6
6744759.7
215.7
0
-90
54
M62-23-PP-007B
C1
M62
629815.6
6744759.7
215.7
0
-90
65
M62-23-PP-008
C1
M62
630126.2
6744498.4
219.7
0
-90
23
M62-23-PP-008B
C1
M62
630126.2
6744498.4
219.7
0
-90
62
M62-23-PP-009
C1
M62
630093.1
6744466.3
219.6
0
-90
67
M62-23-PP-010
C1
M62
630082.9
6744493.1
219.7
0
-90
73
M62-23-PP-011
C1
M62
630063.6
6744478.9
219.7
0
-90
69
M62-23-PP-012
C1
M62
630051.4
6744439.2
219.4
0
-90
71
M62-23-PP-013
C1
M62
629811.4
6744581.8
219.1
0
-90
84
M62-23-PP-014
C1
M62
629761.1
6744584.9
218.4
0
-90
36
M62-23-PP-014B
C1
M62
629761.1
6744584.9
218.4
0
-90
87
M62-23-PP-015
C1
M62
629791.9
6744546.9
220.0
0
-90
87
M62-23-PP-016
C1
M62
629778.3
6744519.1
221.8
0
-90
90
M62-23-PP-017
C1
M62
629785.4
6744486.7
224.0
0
-90
90
M62-23-PP-018
C1
M62
629748.2
6744482.9
223.3
0
-90
90
M62-23-PP-019
C1
M62
629718.6
6744482.4
222.2
0
-90
90
M62-23-PP-020
C1
M62
629749.6
6744452.2
223.2
0
-90
90
M67-23-PP-001*
C1
M67
627896.3
6743459.1
214.2
0
-90
72
M67-23-PP-002
C1
M67
627888.2
6743480.0
214.1
0
-90
75
M67-23-PP-003
C1
M67
627961.0
6743512.7
214.0
0
-90
75
M67-23-PP-004
C1
M67
627987.7
6743495.5
214.2
0
-90
75
M67-23-PP-005
C1
M67
628004.1
6743513.8
214.2
0
-90
78
M67-23-PP-006
C1
M67
628012.4
6743480.1
214.5
0
-90
72
M67-23-PP-007
C1
M67
628025.1
6743503.2
214.3
0
-90
75
M67-23-PP-008
C1
M67
628042.1
6743477.5
214.4
0
-90
75
M67-23-PP-009
C1
M67
628057.3
6743511.8
214.2
0
-90
81
M67-23-PP-010
C1
M67
628067.7
6743490.2
214.3
0
-90
72
M67-23-PP-011
C1
M67
628080.4
6743517.9
214.3
0
-90
78
M67-23-PP-012
C1
M67
628108.4
6743517.0
214.5
0
-90
75
M67-23-PP-013
C1
M67
628124.7
6743539.0
214.4
0
-90
81
M67-23-PP-014
C1
M67
628130.9
6743564.4
214.3
0
-90
81
M67-23-PP-015
C1
M67
628038.9
6743570.0
214.2
0
-90
81
M67-23-PP-016
C1
M67
628029.5
6743587.9
214.2
0
-90
81
M67-23-PP-017
C1
M67
628039.1
6743621.9
214.1
0
-90
81
M67-23-PP-018
C1
M67
628064.8
6743667.5
214.1
0
-90
81
M67-23-PP-019
C1
M67
628103.3
6743662.0
214.0
0
-90
81
M67-23-PP-020
C1
M67
628100.7
6743635.3
214.1
0
-90
84
M67-23-PP-021
C1
M67
628140.0
6743621.7
214.3
0
-90
84
M67-23-PP-022
C1
M67
628137.8
6743643.1
214.3
0
-90
84
M67-23-PP-023
C1
M67
628125.1
6743683.0
214.1
0
-90
75
M67-23-PP-024
C1
M67
628156.6
6743686.5
214.3
0
-90
78
M67-23-PP-025
C1
M67
628174.8
6743675.2
214.5
0
-90
78
M67-23-PP-026
C1
M67
628195.2
6743674.4
214.6
0
-90
78
M67-23-PP-027
C1
M67
627958.2
6743481.2
214.1
0
-90
69
M67-23-PP-028
C1
M67
627930.8
6743513.2
214.0
0
-90
69
M67-23-PP-029
C1
M67
627908.7
6743497.5
214.0
0
-90
66
M67-23-PP-030
C1
M67
627923.7
6743471.2
214.2
0
-90
69

*Hydrogeological drill holes

About Osisko Metals

Osisko Metals Incorporated is a Canadian exploration and development company creating value in the critical metals space, more specifically copper and zinc. The Company is a joint venture partner with Appian Capital Advisory LLP for the advancement of one of Canada's premier past-producing zinc mining camps, the Pine Point Project, located in the Northwest Territories, for which the 2022 PEA (as defined herein) has indicated an after-tax NPV of C$602 million and an IRR of 25%, based on long-term zinc price of US$1.37/lb and the current mineral resource estimates that are amenable to open pit and shallow underground mining. The current mineral resource estimate in the 2022 PEA consists of 15.7Mt grading 5.55% ZnEq of Indicated Mineral Resources and 47.2Mt grading 5.94% ZnEq of Inferred Mineral Resources . Please refer to the technical report entitled "Preliminary Economic Assessment, Pine Point Project, Hay River, Northwest Territories, Canada" dated August 26, 2022 (with an effective date of July 30, 2022), which was prepared for Osisko Metals and PPML by representatives of BBA Engineering Inc., HydroRessources Inc., PLR Resources Inc. and WSP Canada Inc. (the " 2022 PEA "). Please refer to the full text of the 2022 PEA, a copy of which is available on SEDAR ( www.sedar.com ) under the Osisko Metals' issuer profile, for the assumptions, methodologies, qualifications and limitations described therein. The Pine Point Project is located on the south shore of Great Slave Lake in the Northwest Territories, near infrastructure, with paved highway access, an electrical substation, as well as 100 kilometres of viable haulage roads.

In addition, the Company also acquired in July 2023, from Glencore Canada Corporation, a 100% interest in the past-producing Gaspé Copper Mine, located near Murdochville in the Gaspé peninsula of Québec. The Company is currently focused on resource evaluation of the Mount Copper Expansion Project that hosts an Inferred Mineral Resource (in accordance with National Instrument 43-101 – Standards of Disclosure for Mineral Projects ) of 456Mt grading 0.31% Cu (see April 28, 2022 news release of Osisko Metals entitled "Osisko Metals Announces Maiden Resource at Gaspé Copper – Inferred Resource of 456Mt Grading 0.31% Copper" ). Gaspé Copper hosts the largest undeveloped copper resource in Eastern North America, strategically located near existing infrastructure in the mining-friendly province of Québec.

About Appian

Appian Capital Advisory LLP is a London-headquartered investment advisor to long-term value-focused private capital funds that invest solely in mining and mining-related companies.

Appian is a leading investment advisor in the metals and mining industry, with global experience across South America, North America, Europe, Australia and Africa and a successful track record of supporting companies to achieve their development targets, with a global operating portfolio overseeing nearly 6,300 employees. Appian has a global team of 65 experienced professionals with presences in London, Toronto, Vancouver, Montreal, New York, Lima, Belo Horizonte, Perth, Mexico City and Dubai. The Appian team, through its private capital funds, has a long history of successfully bringing mines through development and into production, having completed 9 mine builds in the last 6 years.

For more information, please visit www.appiancapitaladvisory.com , or find us on LinkedIn, Instagram and Twitter.

For further information on this news release, visit www.osiskometals.com or contact:

Robert Wares, Chairman & CEO of Osisko Metals Incorporated

Email: info@osiskometals.com
www.osiskometals.com

Cautionary Statement on Forward-Looking Information

This news release contains "forward-looking information" within the meaning of applicable Canadian securities legislation based on expectations, estimates and projections as at the date of this news release. Any statement that involves predictions, expectations, interpretations, beliefs, plans, projections, objectives, assumptions, future events or performance are not statements of historical fact and constitute forward-looking information. This news release may contain forward-looking information pertaining to the closing of the Gaspe Copper Project Definitive Agreement or the Pine Point Project. For Pine Point, statements including, among other things, the results of the 2022 PEA and the IRR, NPV and estimated costs, production, production rate and mine life; the expectation that the Project will be a robust operation and profitable at a variety of prices and assumptions; the ability to identify additional resources and reserves (if any) and exploit such resources and reserves on an economic basis; the expected high quality of the Pine Point concentrates; the potential impact of the Pine Point Project in the Northwest Territories, including but not limited to the potential generation of tax revenue and contribution of jobs; the Pine Point Project having the potential for mineral resource expansion and new discoveries; the timing and ability for the Pine Point Project to reach construction decision (if at all); the estimated costs to take the Pine Point Project to construction decision (if at all); the ability of the Company to realize the anticipated benefits of the Transaction; and the impact to the Company of the disposition of ownership interest and control in the Pine Point Project, which is a material property of the Company. There can be no certainty on the timing, costs and ability for the joint venture parties to take the Pine Point Project to reach a construction decision or pursue planned exploration and development as presently contemplated.

Forward-looking information is not a guarantee of future performance and is based upon a number of estimates and assumptions of management, in light of management's experience and perception of trends, current conditions and expected developments, as well as other factors that management believes to be relevant and reasonable in the circumstances, including, without limitation, assumptions about: favourable equity and debt capital markets; the ability and timing for the parties to fund cash calls to advance the development of the Pine Point Project and pursue planned exploration and development; future prices of zinc and lead; the timing and results of exploration and drilling programs; the accuracy of mineral resource estimates; production costs; operating conditions being favourable; political and regulatory stability; the receipt of governmental and third party approvals; licenses and permits being received on favourable terms; sustained labour stability; stability in financial and capital markets; availability of equipment; the economic viability of the Pine Point Project; and positive relations with local groups. Forward-looking information involves risks, uncertainties and other factors that could cause actual events, results, performance, prospects and opportunities to differ materially from those expressed or implied by such forward-looking information. Factors that could cause actual results to differ materially from such forward-looking information are set out in the Company's public disclosure record on SEDAR (www.sedar.com) under Osisko Metals' issuer profile. Although the Company believes that the assumptions and factors used in preparing the forward-looking information in this news release are reasonable, undue reliance should not be placed on such information, which only applies as of the date of this news release, and no assurance can be given that such events will occur in the disclosed time frames or at all. The Company disclaims any intention or obligation to update or revise any forward-looking information, whether as a result of new information, future events or otherwise, other than as required by law.

Neither the Exchange nor its Regulation Services Provider (as that term is defined in the policies of the Exchange) accepts responsibility for the adequacy or accuracy of this news release. No stock exchange, securities commission or other regulatory authority has approved or disapproved the information contained herein.


Stock Information

Company Name: Osisko Metals Incorporated
Stock Symbol: OM:CC
Market: TSXVC
Website: osiskometals.com

Menu

OM:CC OM:CC Quote OM:CC Short OM:CC News OM:CC Articles OM:CC Message Board
Get OM:CC Alerts

News, Short Squeeze, Breakout and More Instantly...