Twitter

Link your Twitter Account to Market Wire News


When you linking your Twitter Account Market Wire News Trending Stocks news and your Portfolio Stocks News will automatically tweet from your Twitter account.


Be alerted of any news about your stocks and see what other stocks are trending.



home / news releases / OSK:CC - Osisko Windfall Drilling Intercept High Grade in Lynx


OSK:CC - Osisko Windfall Drilling Intercept High Grade in Lynx

TORONTO, March 16, 2022 (GLOBE NEWSWIRE) -- Osisko Mining Inc. (OSK:TSX. "Osisko" or the "Corporation") is pleased to provide new analytical results from the ongoing drill program at its 100% owned Windfall gold project located in the Abitibi greenstone belt, Urban Township, Eeyou Istchee James Bay, Québec.

Significant new analytical results presented below include 50 intercepts in 27 drill holes (2 from surface, 25 from underground) and 8 wedges. The infill intercepts are located inside defined January 2022 mineral resource estimate (“MRE”) blocks ( see Osisko news release dated January 10, 2022 ). The expansion intercepts are located outside the January 2022 MRE blocks and either expand resource wireframes or are in a defined zone or corridor but do not yet correlate to a specific wireframe.

Osisko Chief Executive Officer John Burzynski commented: “The Lynx infill and expansion drill programs continue to impress with respect to both high-grade and width. A third of today’s intercepts are greater than an ounce per ton gold and a third are greater than five meters in length. Drilling at Windfall remains focused on Lynx and other strategic areas.”

Selected high-grade intercepts include: 431 g/t Au over 4.7 metres and 32.6 g/t Au over 3.4 metres in WST-21-0929B; 187 g/t Au over 5.4 metres in OSK-W-21-2601-W1; 103 g/t Au over 6.6 metres in WST-21-0907; 65.5 g/t Au over 7.4 metres in OSK-W-21-2605-W1; 45.2 g/t Au over 8.5 metres in WST-21-0934; 22.1 g/t Au over 12.0 metres in OSK-W-21-2613-W1; 116 g/t Au over 2.1 metres in WST-21-0994; 36.0 g/t Au over 6.4 metres in OSK-W-21-1949-W16; 42.1 g/t Au over 5.2 metres in WST-21-0689A and 23.9 g/t Au over 5.6 metres in OSK-W-21-2381-W3. Maps showing hole locations and full analytical results are available at www.osiskomining.com . Maps: Long Section_All zones In EN 20220316 , Long Section_All zones Ex EN 20220316 , PR_EN_20220316_Surface , PR_EN_20220316_UG .

Infill Drilling

Hole No.
From
(m)
To
(m)
Interval
(m)
Au (g/t)
uncut
Au (g/t)
cut to 100 g/t
Zone
Corridor
OSK-W-21-1949-W16
624.7
631.1
6.4
36.0
22.6
LXM_3388



Lynx



including
629.6
630.0
0.4
298
100
and
630.0
630.4
0.4
116
100
OSK-W-21-2287-W12
1200.3
1202.5
2.2
14.3
LX4_3449

Lynx 4

including
1200.3
1201.2
0.9
31.8
OSK-W-21-2564-W1
742.0
744.1
2.1
33.9
25.9
TLX_3171

Triple Lynx

including
742.7
743.2
0.5
134
100
OSK-W-21-2605
1304.0
1306.0
2.0
7.18
LX4_3445
Lynx 4
OSK-W-21-2605-W1
1295.7
1303.1
7.4
65.5
25.0
LX4_3449



Lynx 4



including
1296.4
1296.8
0.4
754
100
and
1296.8
1297.7
0.9
142
100
OSK-W-21-2613-W1
980.0
982.9
2.9
7.04
TLX_3161

Triple Lynx

including
981.8
982.9
1.1
14.6
1116.0
1128.0
12.0
22.1
19.9
TLX_3160



Triple Lynx



including
1118.2
1119.0
0.8
132
100
and
1127.0
1128.0
1.0
68.0
1131.0
1133.0
2.0
5.13
TLX_3160
Triple Lynx
WST-21-0689A
217.8
223.0
5.2
42.1
24.7
TLX_3161

Triple Lynx

including
220.0
220.5
0.5
281
100
WST-21-0713
26.7
33.0
6.3
5.34
LXM_3303

Lynx

including
32.1
33.0
0.9
18.3
WST-21-0877
328.5
331.0
2.5
7.63
LSW_3556

Lynx SW

including
329.2
329.5
0.3
56.5
WST-21-0907
527.7
534.3
6.6
103
32.4
LX4_3401

Lynx 4

including
530.4
531.4
1.0
565
100
WST-21-0929B
550.4
553.8
3.4
32.6
12.7
LX4_3404

Lynx 4

including
553.0
553.3
0.3
326
100
564.8
569.5
4.7
431
62.6
LX4_3430





Lynx 4





including
564.8
565.6
0.8
293
100
and
565.6
566.4
0.8
2010
100
and
567.0
568.0
1.0
147
100
WST-21-0933A
331.0
333.5
2.5
4.76
TLX_3166
Triple Lynx
498.4
500.4
2.0
31.2
25.2
LX4_3450

Lynx 4

including
499.0
499.3
0.3
140
100
WST-21-0934
481.1
489.6
8.5
45.2
22.9
LX4_3430



Lynx 4



including
483.6
484.5
0.9
236
100
and
485.9
486.2
0.3
323
100
WST-21-0948
504.6
506.8
2.2
27.9
23.1
LX4_3409

Lynx 4

including
504.6
504.9
0.3
136
100
WST-21-0956
244.6
246.6
2.0
41.9
TLX_3121
Triple Lynx
251.0
253.3
2.3
40.5
TLX_3121

Triple Lynx

including
252.0
252.5
0.5
96.7
WST-21-0961
199.0
201.1
2.1
17.8
TLX_3161

Triple Lynx

including
199.7
200.4
0.7
52.1
WST-21-0964
484.0
486.0
2.0
3.87
LX4_3401
Lynx 4
WST-21-0967
219.5
221.8
2.3
9.91
TLX_3161

Triple Lynx

including
220.1
220.6
0.5
45.4
WST-21-0970
466.4
468.4
2.0
9.06
LX4_3430

Lynx 4

including
468.1
468.4
0.3
57.5
476.0
478.3
2.3
6.34
LX4_3444

Lynx 4

including
476.7
477.0
0.3
22.2
WST-21-0978A
315.4
317.6
2.2
20.4
TLX_3131

Triple Lynx

including
316.2
316.6
0.4
98.4
WST-21-0981
178.7
181.1
2.4
20.9
TLX_3161

Triple Lynx

including
178.7
179.0
0.3
65.7
WST-21-0991
328.0
330.0
2.0
40.5
35.8
LHW_3212

Lynx HW

including
328.5
329.2
0.7
114
100
WST-21-0994
181.3
183.4
2.1
116
40.7
TLX_3184

Triple Lynx

including
181.9
182.6
0.7
325
100
WST-21-0995
25.7
27.8
2.1
5.57
TLX_3161
Triple Lynx
30.9
33.0
2.1
7.46
TLX_3161
Triple Lynx
WST-21-0996A
194.6
200.3
5.7
6.65
TLX_3164

Triple Lynx

including
198.8
199.1
0.3
47.7
225.0
231.0
6.0
4.10
TLX_3169
Triple Lynx
381.0
383.0
2.0
4.18
TLX_3191

Triple Lynx

including
381.3
381.7
0.4
20.2
WST-21-0997
555.0
557.2
2.2
9.24
LX4_3404
Lynx 4
WST-22-1000
147.3
155.5
8.2
8.26
TLX_3161

Triple Lynx

including
150.3
150.8
0.5
44.8
WST-22-1002
250.0
252.0
2.0
20.7
LHW_3224

Lynx HW

including
251.0
252.0
1.0
41.4
268.0
270.0
2.0
3.63
LHW_3224
Lynx HW
WST-22-1007
199.4
201.7
2.3
9.11
TLX_3161

Triple Lynx

including
199.8
200.2
0.4
29.4

Notes: True widths are estimated at 55 – 80% of the reported core length interval. See "Quality Control and Reporting Protocols" below. LX4 = Lynx 4, LHW = Lynx Hanging Wall, LXM = Lynx Main, LSW = Lynx Southwest and TLX = Triple Lynx.

Expansion Drilling

Hole No.
From
(m)
To
(m)
Interval
(m)
Au (g/t)
uncut
Au (g/t)
cut to
100 g/t
Zone
Corridor
OSK-W-21-2381-W3
919.0
921.0
2.0
4.28
TLX
Triple Lynx
959.8
962.7
2.9
12.9
TLX

Triple Lynx

including
961.5
961.9
0.4
51.0
997.0
1002.6
5.6
23.9
TLX_3158

Triple Lynx

including
997.0
997.4
0.4
50.6
OSK-W-21-2540-W5
1134.0
1136.0
2.0
22.8
TLX

Triple Lynx

including
1134.0
1135.1
1.1
41.3
OSK-W-21-2601-W1
1004.6
1010.0
5.4
187
71.8
TLX_3158



Triple Lynx



including
1005.4
1007.8
2.4
330
100
and
1008.3
1008.6
0.3
325
100
OSK-W-21-2647
1364.0
1366.5
2.5
16.6
TLX_3172

Triple Lynx

including
1365.0
1365.6
0.6
62.4
WST-21-0927
588.0
593.5
5.5
4.60
LX4

Lynx 4

including
588.0
588.7
0.7
25.6
650.3
661.0
10.7
5.79
LX4

Lynx 4

including
651.0
651.7
0.7
21.7
WST-21-0970
448.9
451.4
2.5
17.4
LX4

Lynx 4

including
449.9
450.5
0.6
65.0
WST-21-0992
242.1
244.2
2.1
11.8
LXM

Lynx

including
242.1
243.0
0.9
25.4
WST-21-0996A
359.0
362.1
3.1
4.21
TLX
Triple Lynx

Notes: True widths are estimated at 55 – 80% of the reported core length interval. See "Quality Control and Reporting Protocols" below., LXM = Lynx Main, LX4 = Lynx 4 and TLX = Triple Lynx.

Drill hole location

Hole No.
Azimuth
(°)
Dip (°)
Length
(m)
UTM E
UTM N
Elevation
Section
OSK-W-21-1949-W16
105
-57
1014
453440
5435479
401
3825
OSK-W-21-2287-W12
116
-53
1302
453607
5435714
404
4075
OSK-W-21-2381-W3
134
-53
1392
453620
5435790
402
4125
OSK-W-21-2540-W5
117
-60
1311
453465
5435640
410
3925
OSK-W-21-2564-W1
132
-50
1152
452960
5435539
419
3425
OSK-W-21-2601-W1
125
-61
1235
453425
5435657
413
3900
OSK-W-21-2605
112
-55
1401
453552
5435669
408
4025
OSK-W-21-2605-W1
112
-55
1380
453552
5435669
408
4025
OSK-W-21-2613-W1
114
-53
1152
452981
5435549
420
3450
OSK-W-21-2647
100
-61
1215
453525
5435704
405
4000
WST-21-0689A
161
-64
397
453356
5435272
16
3650
WST-21-0713
165
4
40
453359
5435194
84
3625
WST-21-0877
158
-60
490
453105
5435065
231
3325
WST-21-0907
130
-40
701
453375
5435297
-26
3675
WST-21-0927
146
-48
751
453321
5435235
54
3600
WST-21-0929B
115
-46
771
453506
5435327
-90
3800
WST-21-0933A
131
-52
733
453222
5435121
135
3450
WST-21-0934
119
-39
583
453507
5435332
-47
3800
WST-21-0948
136
-31
583
453374
5435296
-26
3675
WST-21-0956
134
-60
301
453508
5435328
-7
3800
WST-21-0961
163
-56
390
453507
5435327
-7
3800
WST-21-0964
127
-38
684
453374
5435297
-26
3675
WST-21-0967
160
-60
271
453506
5435327
-7
3800
WST-21-0970
117
-34
519
453507
5435333
-47
3800
WST-21-0978A
146
-49
702
453508
5435327
-7
3800
WST-21-0981
174
-51
258
453358
5435296
-149
3675
WST-21-0991
134
-29
391
453461
5435326
32
3775
WST-21-0992
120
-34
499
453507
5435333
-47
3800
WST-21-0994
197
-38
231
453357
5435296
-148
3675
WST-21-0995
149
-39
148
453440
5435223
-159
3700
WST-21-0996A
143
-45
427
453358
5435297
-149
3675
WST-21-0997
119
-45
640
453506
5435326
-90
3800
WST-22-1000
139
-45
447
453359
5435297
-149
3675
WST-22-1002
122
-36
341
453507
5435332
-48
3800
WST-22-1007
142
-36
183
453345
5435313
-67
3650

Lynx Zone
Mineralization occurs as grey to translucent quartz-carbonate-pyrite-tourmaline veins and pyrite replacement zones and stockworks. Vein-type mineralization is associated with haloes of pervasive sericite-pyrite ± silica alteration and contain sulphides (predominantly pyrite with minor amounts of chalcopyrite, sphalerite, galena, arsenopyrite, and pyrrhotite) and local visible gold. Replacement mineralization is associated with strong pervasive silica-sericite-ankerite ± tourmaline alteration and contains disseminated pyrite from trace to 80% with local visible gold. Pyrite stockworks can form envelopes that reach several tens of metres thick. Fuchsite alteration is common and is spatially constrained to near the gabbros. Mineralization occurs at or near geological contacts between felsic porphyritic or fragmental intrusions and the host rhyolites or gabbros and locally can be hosted along the gabbro-rhyolite contact.

Qualified Person
The scientific and technical content of this news release has been reviewed, prepared and approved by Mr. Louis Grenier, M.Sc.A., P.Geo. (OGQ 800), Director of Exploration for Osisko's Windfall gold project, who is a "qualified person" as defined by National Instrument 43-101 – Standards of Disclosure for Mineral Projects ("NI 43-101").

Quality Control and Reporting Protocols
True width determination is estimated at 55-80% of the reported core length interval for the zone. Assays are uncut except where indicated. Intercepts occur within geological confines of major zones but have not been correlated to individual vein domains at this time. Reported intervals include minimum weighted averages of 3.5 g/t Au diluted over core lengths of at least 2.0 metres. NQ core assays were obtained by either 1-kilogram screen fire assay or standard 50-gram fire-assaying-AA finish or gravimetric finish at (i) ALS Laboratories in Val d'Or, Québec, Vancouver, British Colombia, Lima, Peru or Vientiane, Laos (ii) Bureau Veritas in Timmins, Ontario. The 1-kilogram screen assay method is selected by the geologist when samples contain coarse gold or present a higher percentage of pyrite than surrounding intervals. Selected samples are also analyzed for multi-elements, including silver, using a Four Acid Digestion-ICP-MS method at ALS Laboratories. Drill program design, Quality Assurance/Quality Control ("QA/QC") and interpretation of results is performed by qualified persons employing a QA/QC program consistent with NI 43-101 and industry best practices. Standards and blanks are included with every 20 samples for QA/QC purposes by the Corporation as well as the lab. Approximately 5% of sample pulps are sent to secondary laboratories for check assay.

About the Windfall Gold Deposit
The Windfall gold deposit is located between Val-d'Or and Chibougamau in the Abitibi region of Québec, Canada. The Mineral Resource Estimate ( MRE ) defined by Osisko, as disclosed in the news release dated January 10, 2022 is supported by the technical report entitled “Mineral Resource Estimate Update for the Windfall Project” dated February 10, 2022 (with an effective date  of October 21, 2021), and assuming a cut-off grade of 3.50 g/t Au, comprises 565,000 tonnes at 11.6 g/t Au (210,000 ounces) in the measured mineral resource category, 8,907,000 tonnes at 10.5 g/t Au (2,994,000 ounces) in the indicated mineral resource category and 13,035,000 tonnes at 8.6 g/t Au (3,585,000 ounces) in the inferred mineral resource category . The key assumptions, parameters and methods used to estimate the mineral resource estimate disclosed in the January 10, 2022, news release, certain of which are described in the January 10, 2022, news release, are further described in the full technical report for this updated mineral resource estimate in accordance with NI 43-101 and is available on SEDAR (www.sedar.com) under the Corporation's issuer profile. The Windfall gold deposit is currently one of the highest-grade resource-stage gold projects in Canada and has world-class scale. Mineralization occurs in three principal zones: Lynx, Main Zone, and Underdog. Mineralization is generally comprised of sub-vertical zones following intrusive porphyry contacts plunging to the northeast. The r esources are defined from surface to a depth of 1,600 metres as it now includes the Triple 8 (T8) zone. The resources excluding T8 are defined from surface to a depth of 1,200 metres. T he deposit remains open along strike and at depth . Mineralization has been identified at surface in some areas and as deep as 2,625 metres in others with significant potential to extend mineralization down-plunge and at depth.

About Osisko Mining Inc.
Osisko is a mineral exploration company focused on the acquisition, exploration, and development of gold resource properties in Canada. Osisko holds a 100% interest in the high-grade Windfall gold deposit located between Val-d'Or and Chibougamau in Québec and holds a 100% undivided interest in a large area of claims in the surrounding Urban Barry area and nearby Quévillon area (over 2,500 square kilometres).

Cautionary Note Regarding Forward-Looking Information
This news release contains "forward-looking information" within the meaning of the applicable Canadian securities legislation that is based on expectations, estimates, projections and interpretations as at the date of this news release. Any statement that involves predictions, expectations, interpretations, beliefs, plans, projections, objectives, assumptions, future events or performance (often, but not always, using phrases such as "expects", or "does not expect", "is expected", "interpreted", "management's view", "anticipates" or "does not anticipate", "plans", "budget", "scheduled", "forecasts", "estimates", "potential", "feasibility", "believes" or "intends" or variations of such words and phrases or stating that certain actions, events or results "may" or "could", "would", "might" or "will" be taken to occur or be achieved) are not statements of historical fact and may be forward-looking information and are intended to identify forward-looking information. This news release contains the forward-looking information pertaining to, among other things: the Windfall gold deposit being one of the highest-grade resource-stage gold projects in Canada and having world-class scale; the key assumptions, parameters and methods used to estimate the mineral resource estimate disclosed in this news release; the prospects, if any, of the Windfall gold deposit; timing and ability of Osisko to file a technical report for the mineral resource estimate disclosed in this news release; the timing and ability of Osisko, if at all, to publish a feasibility study for the Windfall gold deposit; the amount and type of drilling to be completed and the timing to complete such drilling; the focus of the remaining infill drilling; the trend of grade increase; the Lynx zone remaining open to expansion down plunge; upgrading a inferred mineral resource to a measured mineral resource or indicated mineral resource category; future drilling at the Windfall gold deposit; the significance of historic exploration activities and results. Such factors include, among others, risks relating to the ability of exploration activities (including drill results) to accurately predict mineralization; errors in management's geological modelling; the ability of Osisko to complete further exploration activities, including (infill) drilling; property and royalty interests in the Windfall gold deposit; the ability of the Corporation to obtain required approvals; the results of exploration activities; risks relating to mining activities; the global economic climate; metal prices; dilution; environmental risks; and community and non-governmental actions. Although the forward-looking information contained in this news release is based upon what management believes, or believed at the time, to be reasonable assumptions, Osisko cannot assure shareholders and prospective purchasers of securities of the Corporation that actual results will be consistent with such forward-looking information, as there may be other factors that cause results not to be as anticipated, estimated or intended, and neither Osisko nor any other person assumes responsibility for the accuracy and completeness of any such forward-looking information. Osisko does not undertake, and assumes no obligation, to update or revise any such forward-looking statements or forward-looking information contained herein to reflect new events or circumstances, except as may be required by law.

CONTACT INFORMATION:
John Burzynski
Chief Executive Officer
Telephone (416) 363-8653


Stock Information

Company Name: Osisko Mining Inc.
Stock Symbol: OSK:CC
Market: TSXC
Website: osiskomining.com

Menu

OSK:CC OSK:CC Quote OSK:CC Short OSK:CC News OSK:CC Articles OSK:CC Message Board
Get OSK:CC Alerts

News, Short Squeeze, Breakout and More Instantly...