Twitter

Link your Twitter Account to Market Wire News


When you linking your Twitter Account Market Wire News Trending Stocks news and your Portfolio Stocks News will automatically tweet from your Twitter account.


Be alerted of any news about your stocks and see what other stocks are trending.



home / news releases / PDM:CC - Palladium One Intersects Wide Zones of Mineralization at West Pickle on the Tyko Nickel Project Canada


PDM:CC - Palladium One Intersects Wide Zones of Mineralization at West Pickle on the Tyko Nickel Project Canada

Highlights

  • Wide zones of nickel-copper mineralization intersected at West Pickle Include:
    • 0.6% Ni, 0.4% Cu, 0.01% Co, 0.08 g/t Total Precious Metals ("TPM") (Pt+Pd+Au) over 28.2 meters in hole TK22-114
      • Including 2.0% Ni, 0.6% Cu, 0.04% Co, 0.12 g/t TPM over 3.2 meters
    • 0.43% Ni, 0.26% Cu, 0.01% Co, 0.06 g/t TPM over 27.0 meters in hole TK22-118
      • Including 2.0% Ni, 0.7% Cu, 0.04% Co, 0.14 g/t TPM over 1.0 meters
    • 1.5% Ni, 0.7% Cu, 0.02% Co, 0.30 g/t TPM over 8.0 meters in hole TK22-116
      • Including 10.0% Ni, 4.47% Cu, 0.14% Co, 2.13 g/t TPM over 1.0 meters
  • The most easterly hole to date on West Pickle returns high grade:
    • 1.9% Ni, 1.04% Cu, 0.03% Co, 0.58 g/t Total Precious Metals ("TPM") (Pt+Pd+Au) over 2.6 meters in hole TK22-117
      • Including 5.7% Ni, 1.9% Cu, 0.07% Co, 1.57 g/t TPM over 0.8 meters
      • West Pickle remains open for expansion to the east toward the RJ Zone
  • West Pickle shown to contain wide zones of mineralization similar to the nearby RJ Zone, and narrower zones of high-grades similar to the Smoke Lake Zone, located 20 kilometers to the east.
    • RJ Zone, 2.7 kilometres east of West Pickle, previously retuned 85.4 meters of ultramafic hosted mineralization with Feeder Dyke / Chonolith breccia textures:
      • 0.5% Ni and 0.2% Cu over 85.4 meters in hole TK-16-002
      • Including 1.0% Ni and 0.2% Cu over 16.2 meters (see press release June 8, 2016)

Toronto, Ontario--(Newsfile Corp. - April 19, 2023) - Palladium One Mining Inc. (TSXV: PDM) (OTCQB: NKORF) (FSE: 7N11) (the "Company" or "Palladium One") is pleased to report the final results of the 2022 drill program on the Tyko Project Nickel - Copper Project, in Ontario, Canada. These results represent the widest intercepts to date from the West Pickle Zone massive sulphide discovery.

President and CEO, Derrick Weyrauch commented, "These drill results reinforce both the high-grade nature of the West Pickle Zone and the potential for tonnage as seen in hole TK22-114, having 28 meters of 0.6% nickel and 0.4% copper. These widths and grades are very reminiscent of the wide zones of mineralization found at the RJ Zone which retuned 85.4 meters of 0.5% Ni and 0.2% Cu (Hole TK16-002), and speaks to the potential of these Chonolith / Feeder Dykes to host significant mineralization (Figure 1, 2)."

The most easterly hole drilled to date on the West Pickle Zone (Hole TK22-117), intersected high-grade massive nickel-copper sulphides and has extended the zone to over 600 meters in length, and it remains open for further expansion on the east toward the RJ Zone.

To date a total of 32 holes, totalling 6,766 meters have been drilled in the vicinity of the West Pickle Discovery. At present, West Pickle mineralization has been defined over more than 600 meters of strike length (Figure 2,3).

The 2022 drill program consisted of 70 holes totaling 13,038 meters.

The 2023 exploration program is focused on ground truthing and drill testing interpreted Chonoliths / Feeder Dykes on the Tyko Project. In Q1 2023, the Company completed a high-resolution magnetic survey while the field season is expected to resume once snow conditions allow. The Q1 2023 magnetic survey was designed to refine the geometry of the interpreted feeder dykes / chonoliths across the Tyko project's 30-kilometer strike length prior to additional drill testing.



Figure 1. Tyko Property map showing various mineralized zones and multi-line VTEM anomalies, background is Calculated Vertical Gradient Magnetics ("CVG").

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/6502/162958_25a6ad221402ba93_001full.jpg

Figure 2. Plan and long section looking north perpendicular to the interpreted chonolith structure linking the West Pickle and RJ zones and showing potential for massive sulphide mineralization beyond the depth detectable by the 2021 VTEM airborne survey.

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/6502/162958_25a6ad221402ba93_002full.jpg



Figure 3. Long section of the West Pickle Zone showing drill hole intercepts.

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/6502/162958_25a6ad221402ba93_003full.jpg



Figure 4. Blebby and stringer nickel-copper sulphide in altered clinopyroxenite in hole TK22-114 ~130m down hole.

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/6502/162958_palladiumonefig4.jpg

Table 1: Assay Results: Select Tyko 2022 Drill Results from the West Pickle Zone

Hole
From
(m)
To
(m)
Width
(m)
Ni
 %
Cu
%
Co
%
TPM g/t
(Pd+Pt+Au)
Pd
g/t
Pt
g/t
Au
g/t
TK22-059
184.0
187.7
3.7
2.33
1.85
0.06
0.45
0.21
0.21
0.03
185.3
187.7
2.4
3.49
2.73
0.09
0.64
0.30
0.30
0.04
185.3
187.0
1.8
4.79
3.67
0.12
0.87
0.41
0.41
0.05
185.3
185.9
0.6
8.21
1.60
0.24
1.62
0.80
0.79
0.03
TK22-060
183.7
196.3
12.6
0.72
0.34
0.02
0.14
0.06
0.06
0.02
184.3
189.0
4.7
1.77
0.63
0.03
0.27
0.12
0.12
0.03
186.6
189.0
2.4
3.18
0.99
0.06
0.39
0.18
0.19
0.02
188.0
188.5
0.5
7.60
1.25
0.12
0.41
0.18
0.20
0.03
TK22-070
164.6
174.7
10.1
2.47
0.99
0.04
0.27
0.14
0.10
0.02
164.6
168.4
3.8
6.42
2.40
0.09
0.64
0.35
0.25
0.04
165.4
167.6
2.3
10.41
3.40
0.14
0.92
0.53
0.34
0.04
165.4
167.1
1.7
12.58
2.49
0.17
0.94
0.60
0.30
0.04
165.4
166.3
0.9
12.90
2.70
0.16
1.05
0.67
0.34
0.04
TK22-072
149.0
153.1
4.1
2.05
0.89
0.04
0.36
0.11
0.22
0.03
150.4
153.1
2.7
3.08
1.18
0.07
0.45
0.14
0.29
0.02
151.7
153.1
1.5
5.33
1.48
0.12
0.67
0.17
0.48
0.02
151.7
152.3
0.7
7.39
2.22
0.16
0.95
0.24
0.69
0.03
TK22-073
137.5
140.1
2.6
7.19
2.01
0.10
0.56
0.32
0.20
0.05
137.5
139.3
1.8
10.32
2.88
0.15
0.80
0.46
0.27
0.07
138.5
139.3
0.8
11.90
0.98
0.16
0.64
0.33
0.26
0.05
TK22-074
148.9
150.8
2.0
3.94
2.50
0.05
0.55
0.36
0.17
0.02
149.9
150.8
0.9
8.14
2.84
0.11
1.05
0.71
0.31
0.03
TK22-109
130.0
140.0
10.0
0.32
0.14
0.01
0.03
0.01
0.01
0.00
130.0
131.0
1.0
1.52
0.26
0.03
0.11
0.08
0.03
0.01
163.0
167.2
4.2
0.14
0.06
0.01
0.02
0.01
0.01
0.00
TK22-110
131.6
135.3
3.7
0.78
0.12
0.02
0.13
0.04
0.09
0.00
132.6
133.6
1.0
1.63
0.10
0.05
0.28
0.06
0.22
0.00
TK22-112
146.0
148.0
2.0
0.16
0.07
0.01
0.02
0.01
0.01
0.00
170.0
174.0
4.0
0.11
0.05
0.01
0.01
0.01
0.00
0.00
TK22-113
Abandoned due to deviation
TK22-114
116.6
144.8
28.2
0.65
0.38
0.01
0.08
0.03
0.04
0.01
117.6
138.8
21.2
0.84
0.49
0.02
0.10
0.04
0.05
0.01
117.6
120.8
3.2
2.05
0.61
0.04
0.12
0.06
0.05
0.01
TK22-115
115.8
118.6
2.8
0.16
0.11
0.01
0.05
0.02
0.03
0.00
116.8
117.6
0.8
0.34
0.05
0.02
0.11
0.04
0.07
0.00
TK22-116
137.0
145.0
8.0
1.49
0.71
0.02
0.30
0.11
0.04
0.14
137.0
140.0
3.0
3.87
1.71
0.06
0.76
0.29
0.10
0.37
137.0
138.0
1.0
10.01
4.47
0.14
2.13
0.82
0.22
1.09
TK22-117
106.5
109.0
2.6
1.91
1.05
0.03
0.58
0.33
0.24
0.02
107.2
108.0
0.8
5.66
1.94
0.07
1.57
0.97
0.55
0.05
TK22-118
101.0
128.0
27.0
0.43
0.26
0.01
0.06
0.03
0.03
0.01
107.0
123.0
16.0
0.58
0.36
0.02
0.09
0.04
0.04
0.01
115.0
116.0
1.0
2.03
0.73
0.04
0.09
0.04
0.05
0.01
TK22-119
104.0
105.0
1.0
0.28
0.23
0.01
0.07
0.02
0.03
0.02
TK22-120
173.1
175.8
2.7
0.76
0.37
0.03
0.16
0.09
0.06
0.01
174.1
175.0
0.8
1.71
0.79
0.09
0.39
0.21
0.16
0.02
TK22-121
No significant values
TK22-122
No significant values

 

(1) Reported widths are "drilled widths" not true widths.
(2) Italicised grey shaded values are previously reported (see news release October 4, 2022, November 21, 2022 November 29, 2022, and January 12, 2023, February 6, 2023)

Table 2: Drill Hole Locations for assay results from this News Release

Hole
Azimuth
Dip
Length
NAD83 z16 East
NAD83 z16 North
Elevation
TK22-109
141
-52
189
601724
5421967
349.93
TK22-110
184
-52
177
601723.7
5421966
349.65
TK22-112
140
-57
225
601724.8
5421967
349.12
TK22-113
140
-46
42
601724.8
5421967
349.12
TK22-114
141
-46
162
601724.5
5421968
349.73
TK22-115
130
-61
201
602004.1
5421973
347.63
TK22-116
155
-54
174
601606.9
5421923
349.53
TK22-117
130
-53
177
602004.6
5421972
347.02
TK22-118
195
-54
180
601816.1
5421969
350.62
TK22-119
165
-52
227
602003.8
5421971
345.73
TK22-120
171
-56
222
601562
5421919
351.45
TK22-121
193
-59
195
602002.4
5421974
345.62
TK22-122
157
-57
201
601897.3
5421970
348.53

 

QA/QC
The drilling program was carried out under the supervision of Neil Pettigrew, M.Sc., P. Geo., Vice President of Exploration, and a Director of the Company

Drill core samples were split using a rock saw by Company staff, with half retained in the core box and stored onsite at the Tyko exploration camp core yard facility.

Samples were transported in secure bags directly from the logging facility at the onsite exploration camp, to the Activation Laboratories Ltd. ("Actlabs") in Thunder Bay, Ontario. Actlabs, which is ISO 17025 accredited with CAN-P-1579 (Mineral Lab). In addition to ISO 17025 accreditation, Actlabs is accredited/certified to ISO 9001:2015. All samples are crushed to 2 millimeters with a 250-gram split pulverized to 105 microns. Analysis for PGEs is performed using a 30 grams fire assay with an ICP-OES finish and for Ni, Cu, and Co using 0.25 grams by 4 acid digestion with ICP-OES finish. Ni, Cu and Co samples over 1.0 wt% were re-analysed by ore grade methods using 4 acid digestion with ICP-OES finish.

Certified standards, blanks and crushed duplicates are placed in the sample stream at a rate of one QA/QC sample per 10 core samples. Results are analyzed for acceptance within the defined limits of the standard used before being released to the public.

About Tyko Nickel - Copper - Cobalt Project
The Tyko Nickel - Copper - Cobalt Project, is located approximately 65 kilometers northeast of Marathon Ontario, Canada. Tyko is an early stage, high sulphide tenor, nickel - copper (2:1 ratio) project and currently has five known mineralized zones spanning over a 20 kilometer strike length. The West Pickle Zone occurs on the Pezim II claim block of the larger Tyko Project.

Qualified Person
The technical information in this release has been reviewed and verified by Neil Pettigrew, M.Sc., P. Geo., Vice President of Exploration and a director of the Company and the Qualified Person as defined by National Instrument 43-101.

About Palladium One
Palladium One Mining Inc. (TSXV: PDM) is focused on discovering environmentally and socially conscious Metals for Green Transportation. A Canadian mineral exploration and development company, Palladium One is targeting district scale, platinum-group-element (PGE)-copper-nickel deposits in Canada and Finland. The Läntinen Koillismaa (LK) Project in north-central Finland, is a PGE-copper-nickel project that has existing NI43-101 Mineral Resources, while both the Tyko and Canalask high-grade nickel-copper projects are located in Ontario and the Yukon, Canada, respectively. Follow Palladium One on LinkedIn, Twitter, and at www.palladiumoneinc.com.

ON BEHALF OF THE BOARD
"Derrick Weyrauch"
President & CEO, Director

For further information contact:
Derrick Weyrauch, President & CEO
Email: info@palladiumoneinc.com

Neither the TSX Venture Exchange nor its Market Regulator (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

This press release is not an offer or a solicitation of an offer of securities for sale in the United States of America. The common shares of Palladium One Mining Inc. have not been and will not be registered under the U.S. Securities Act of 1933, as amended, and may not be offered or sold in the United States absent registration or an applicable exemption from registration.

Information set forth in this press release may contain forward-looking statements. Forward-looking statements are statements that relate to future, not past events. In this context, forward-looking statements often address a company's expected future business and financial performance, and often contain words such as "anticipate", "believe", "plan", "estimate", "expect", and "intend", statements that an action or event "may", "might", "could", "should", or "will" be taken or occur, or other similar expressions. By their nature, forward-looking statements involve known and unknown risks, uncertainties and other factors which may cause our actual results, performance or achievements, or other future events, to be materially different from any future results, performance or achievements expressed or implied by such forward-looking statements. Such factors include, among others, risks associated with project development; the need for additional financing; operational risks associated with mining and mineral processing; fluctuations in palladium and other commodity prices; title matters; environmental liability claims and insurance; reliance on key personnel; the absence of dividends; competition; dilution; the volatility of our common share price and volume; and tax consequences to Canadian and U.S. Shareholders. Forward-looking statements are made based on management's beliefs, estimates and opinions on the date that statements are made and the Company undertakes no obligation to update forward-looking statements if these beliefs, estimates and opinions or other circumstances should change. Investors are cautioned against attributing undue certainty to forward-looking statements.

To view the source version of this press release, please visit https://www.newsfilecorp.com/release/162958

Stock Information

Company Name: Palladium One Mining Inc.
Stock Symbol: PDM:CC
Market: TSXVC

Menu

PDM:CC PDM:CC Quote PDM:CC Short PDM:CC News PDM:CC Articles PDM:CC Message Board
Get PDM:CC Alerts

News, Short Squeeze, Breakout and More Instantly...