(NewsDirect)
Delta Resources CEO Andre Tessier joinedSteve Darling from Proactive to share significant news regarding thecompany's second phase of drilling at the Delta-1 Gold projectnear Thunder Bay, Ontario.
Initialassay results from 23 drill holes have been received out of a total of44 holes drilled so far. The results indicate the definition ofhigh-grade gold shoots from surface within the Alpha and Betamineralized zones.
One notabledrill hole, D1-23-60, showed gold grades of 1.79 g/t over 128.5 metersfrom a depth of 25.5 meters. This included a higher-grade section of2.16 g/t gold over 97.5 meters, also from 25.5 meters to 123 meters.
Furthermore, the widely spaceddrill holes successfully intersected the gold-bearing alterationcorridor hosting the Eureka Gold Mineralization at shallow depths. Thecorridor has been extended an additional 500 meters to the east, withlower-grade intercepts over 16.4 meters.
Future drilling campaigns are planned to further test anddelineate the high-grade gold shoots within this structure, as definedwithin the Eureka Zone.
These assayresults are highly encouraging and indicate the potential forsignificant gold mineralization at the Delta-1 Gold project.
Delta Resources is dedicated to continuing its explorationefforts and unlocking the project's full potential.
Contact Details
Proactive Investors
+1604-688-8158
na-editorial@proactiveinvestors.com
Copyright (c) 2023 TheNewswire - All rights reserved.