(TheNewswire)
Victoria, British Columbia - TheNewswire - February 7 , 2024 - KermodeResources Ltd. (TSXV:KLM) ("Kermode" or the"Company") reports a review of exploration results from 2023and plans for 2024. The results reported here cover four differentprojects called Lucky Strike, Black Panther, Santa Anna, and MountSicker, which are part of ongoing business development activities byKermode.
Further details on all results are published onlinehere,
https://drive.google.com/drive/folders/1GZUNS7HaTejFxvjuNp3ahw5OaHIDj2IG
Kermode CEO Peter Bell comments, "I believe our exploration work in2023 was productive and plan to continue to execute our strategy in2024."
Exploration partner Justin Deveault comments, "We are grateful for theopportunity to work on this program and get paid in shares ofKermode."
Independent qualified person Jacques Houle comments, "I recommend furtherwork on these projects."
“LUCKY STRIKE”
The following assays were previously reported byKermode on May 12, 2023.
Sample # | Easting | Northing | Elev. | Location Name | Rock Type | Copper (% Cu) | (% Zn) |
C-154 | 376329.483 | 5416003.226 | 107.73 | Camp | Sulphide Breccia | 0.47 | 29.40 |
C-175 | 376329.921 | 5416005.202 | 107.77 | Camp | Sulphide Breccia | 0.34 | >30 |
D727908 | 376329.483 | 5416003.226 | 107.68 | Camp | Sulphide Breccia | 0.27 | 14.50 |
D727918 | 376330.371 | 5416006.639 | 107.82 | Camp | Sulphide Breccia | 8.39 | 0.08 |
D727947 | 376330.312 | 5416007.302 | 107.81 | Camp | Massive Sulphide | 0.54 | >30 |
CAMP-150 | 376249.919 | 5415521.804 | 99.91 | Copper | Sulphide Breccia | 0.15 | 9.93 |
D727943 | 376251.967 | 5415517.688 | 99.71 | Copper | Sulphide Breccia | 18.90 | 0.28 |
D727945 | 376254.779 | 5415510.319 | 99.51 | Copper | Sulphide Breccia | 19.00 | 0.09 |
D727946 | 376250.091 | 5415515.18 | 99.38 | Copper | Sulphide Breccia | 9.51 | 0.13 |
D727938 | 375954.449 | 5417249.918 | 141.09 | Lucky 7 | Sulphide Breccia | 0.15 | 13.95 |
NC-162 | 376491.224 | 5416768.123 | 236.01 | New Camp | Sulphide Breccia | 0.09 | 13.70 |
NC-163 | 376496.284 | 5416752.422 | 236.54 | New Camp | Sulphide Breccia | 0.11 | 21.10 |
D727910 | 380413.441 | 5420215.524 | 464.5 | New Copper | Massive Sulphide | 16.20 | 0.06 |
D727911 | 380413.355 | 5420206.951 | 460.04 | New Copper | Massive Sulphide | 24.60 | 0.06 |
D727940 | 380405.16 | 5420200.61 | 458.14 | New Copper | Massive Sulphide | 18.70 | 0.04 |
D727941 | 380421.861 | 5420214.045 | 461.35 | New Copper | 22.10 | 0.03 |
Rock Sample Details for Lucky StrikeProperty | ||||
Sample # | Location | Location Name | Type | Details |
C-154 | Mainline Carmanah | Camp | 1m chip | Gossanous chip of weathered sphalerite vein attached tobedrock. Massive sulphide area is 25cm wide, another 1m wide withdisseminated pyrite, sphalerite in grey siliceous rock surrounding.Area was backfilled by road grader when ditches were redug 2 monthsafter sampling. Chip sample from gossanous vein only. |
C-175 | Mainline Carmanah | Camp | Grab | Chip off a 100kg chunk of vein pulled out of the banknear power pole 197. Boulder was angular and has a 50cm wide massivesulphide vein containing sph, gal, py. Attached to the side was abrittle 14cm massive black sphalerite vein. |
D727908 | Mainline Carmanah | Camp | Grab | Bedrock grab beside power pole 197 at the Camp Showing.Small massive sulphide lense broken off of bedrock or grey siliceousrock unit. Sample contains sphalerite, pyrite, galena and minorchalcopyrite. |
D727918 | Mainline Carmanah | Camp | Grab | Sample from Copper showing. Roadside in the ditch.Sample taken from beside a 20cm wide, deteriorated, vuggy, brownishstained quartz vein. 3cm x 2cm chalcopyrite patch attached toKarmutsen volcanics. |
D727947 | Mainline Carmanah | Camp | 1.1m chip | Massive sphalerite, galena, and minor pyrite in abrittle,hydrothermally altered grey rock (siliceous unit). Chip fromexposed bedrock with patches and stringers of sulphides. Includinggalena, sphalerite, coarse pyrite. Sample has 50%mineralization. |
CAMP-150 | Mainline Carmanah | Copper | 4.3m composite chip | Composite chip sample over a 4.3m wide area of exposedbedrock. 16x 30g+ samples taken every 30cm in bedrock exposed. Atleast 5 contained 30-50% mineralization. All samples had sphalerite,pyrite and minor galena found as disseminations, stringers, patches orsmall lenses. |
D727943 | Mainline Carmanah | Copper | Grab | Karmutsen formation, sheared basaltic rock, brownishcoloured. With attached sulphide lens. Sample taken from the side of alens running through the ditch. Contains roughly 30% chalcopyrite and5% pyrite, minor sphalerite. |
D727945 | Mainline Carmanah | Copper | Grab | Massive chalcopyrite from bedrock in the ditch at theCopper showing. Sample in basaltic rock with 30% chalcopyrite and 10%weathered pyrite. Sample has heavy oxidation and weathering aroundpyritic areas. |
D727946 | Mainline Carmanah | Copper | Grab | Sample taken from 1.5m into roadway. Hole dug down tomassive sulphide area containing, pyrite, chalcopyrite, sphalerite andpossible arsenopyrite. Bedrock grab of massive chalcopyrite inquartz. |
D727938 | Flora Main | Lucky 7 | Grab | Grey siliceous rock unit that is pyritized with up to5% pyrite with patches of sphalerite and pyrite attached. Pyrite isweathered with orange/reddish staining. |
NC-162 | Carmanah 400 | New Camp | 4.4m chip | New Camp showing. Basaltic rock, sheared green, purpleand brown volcanics with irregular quartz eyes, patches. Samples isstained brown in area of sulphides. Contains 20-30% sphalerite,galena, pyrite. |
NC-163 | Carmanah 400 | New Camp | Grab | New Camp Showing. Basaltic rock, sheared green, purpleand brown volcanics with irregular quartz eyes, patches. Sample isstained brown in area of sulphides. Contains 50% sphalerite, galena,pyrite. |
D727910 | Summit Main | New Copper | 3m chip | New Copper Showing - 3m chip sample in a massivechalcopyrite, pyrite showing. Area stained with minor malachite.Samples on average contain over 50% sulphides. |
D727911 | Summit Main | New Copper | Grab | New copper showing. Showing of massive chalcopyrite incenter of a 500m wide area of shear zones and magnetic outcrops,sporadic magnetite. Skarn hosted. Sample contains 30-35% chalcopyrite,pyrite, pyrrhotite |
D727940 | Summit Main | New Copper | Grab | New copper showing. Showing of massive chalcopyrite incenter of a 500m wide area of shear zones and magnetic outcrops,sporadic magnetite. Skarn hosted. Sample contains 50%+ massivechalcopyrite, pyrite, pyrrhotite. |
D727941 | Summit Main | New Copper | Grab | New copper showing. Showing of massive chalcopyrite incenter of a 500m wide area of shear zones and magnetic outcrops,sporadic magnetite. Skarn hosted. Sample contains 25% on averagechalcopyrite, pyrite, pyrrhotite. Composite chip sample over 3m areaof mineralization. |
Links to videos showing all field work associated withthese samples are below.
Location Name | Field Work video link |
Camp | |
Camp | |
Camp | |
Camp | |
Copper | |
Lucky 7 | |
New Camp | |
New Copper | |
New Copper |
“SANTA ANNA”
The following assays were previously reported byKermode on December 5, 2023. The samples were taken from approximatelythirteen areas of interest as part of an ongoing sampling program thatcommenced in August, 2023. Kermode previously published pictures ofthese samples and videos showing the exploration field work done tocollect these samples and others.
Sample No. | Copper | Silver | Gold |
K487256 | 0.89 | 12.4 | <0.01 |
K487257 | 5.22 | 109 | 0.32 |
K487258 | 3.00 | 94.7 | 0.03 |
K487259 | 7.27 | 462 | 0.59 |
K487260 | 3.04 | 57.8 | 0.05 |
K487261 | 5.03 | 145 | 0.2 |
K487262 | 5.51 | 163 | 0.18 |
K487263 | 4.92 | 105 | 0.41 |
K487264 | 6.64 | 183 | 0.51 |
K487265 | 6.97 | 246 | 0.78 |
K487266 | 12.55 | 320 | 0.77 |
K487267 | 5.11 | 122 | 0.45 |
K487268 | 4.49 | 113 | 4.66 |
K487272 | 14.15 | 330 | 0.94 |
Links to videos showing the prospecting for thesesamples are provided below.
Video Title | Field Work video link |
“Prospecting The Santana MineArea!” | |
“Sampling Copper Skarns Exposed InTrenches & Opencuts Over 340 Meter Strike!” | |
“Stockpiled Massive ChalcopyriteFrom Old Mine Workings!” |
Further information about all rock samples is providedbelow.
Rock Sample Details for SANTA ANNAProperty | |||||
Sample # | Location | EASTING | NORTHING | Type | Details |
K487256 | SHOWING #3 | 345733 | 5562257 | Grab | Host rock adjacent to showing. Host rock is a gneissicrock and has what appears to be very minor black colored sulphides(nonmagnetic) and with magnetite disseminated in rock adjacent tomineralized opencut. Consistent with a lot of the unmineralized gneissin the area. Took sample adjacent to showing #3 which is mineralizedskarns. |
K487257 | SHOWING #4 | 345720 | 5562226 | Grab | Trench grab sample. Bedrock grab from a small,mineralized area with 10% chalcopyrite and 3% pyrite, 2% sphalerite ingneiss/skarn. Limestone, gneiss, quartz diorite found in a 3m x 2m x15m trench. Bedrock exposed has varying 1-15% sulphides to left side.Float rocks in trench mineralized. |
K487258 | SHOWING #6 | 345734 | 5562195 | Grab | Open cut/trench/stripping area. Gneiss with 10%sulphides, 3% pyrite and 7% chalcopyrite. Showing of limestone andgneiss found in a 2m x 2m x 2m pit. Up to 10% sulphides seen.Stripping and blasting seen continued down hill in a 18m long by 5mwide area. Trenched and blasted areas sloughed in areas, but limestonecontact seen. |
K487259 | SHOWING #7 | 345745 | 5562174 | Grab | Sample from lower trench with 2m quartz vein anddisseminated chalcopyrite. Large white quartz vein exposed in 2trenches and a pit. And two 1m x 1m x 10m trenches. Sample ofweathered gneiss attached to quartz with small patches ofchalcopyrite. Approximately 15% chalcopyrite. |
K487260 | SHOWING #7 | 345745 | 5562174 | Grab | Sample from middle trench at showing, trench exposessmall bedrock area at back of trench with 10% chalcopyrite. Trenchmostly sloughed in. Large white quartz vein exposed in trench and apit on either side of this. Trench is 1m x 2m x 10m. |
K487261 | SHOWING #12 | 345758 | 5562117 | Grab | 15m tall vertical outcrop with two open cuts strikinginto the side 3m x 3m deep into skarn and gneiss with disseminated upto massive sulphides. The showing is exposed over 5m wide and is 18mlong but open at depth, width and strike. Quartz is cutting through ina couple areas and magnetic quartz diorite and gneiss seen 20m abovethe showing. The showing and sample contain skarn with disseminatedchalcopyrite, minor pyrite and magnetite. Sample contains 15%chalcopyrite, 25% magnetite and 5% pyrite which is an average sampleseen. Sample taken from an area of average mineralization in the firstopen cut. |
K487262 | SHOWING #13 | 345758 | 5562102 | Grab | 20m tall vertical outcrop with several blasted smallcuts and stripping over 30m strike along base of outcrop. Many areasof skarn/gneiss with disseminated up to massive sulphides seen. Theshowing is exposed over the base at a strike of almost 30m long.Quartz veining seen cutting through in several areas contains smallpatches of mineralization. The sample contains skarn with disseminatedto semi massive chalcopyrite and minor pyrite and magnetite. Samplecontains 15% chalcopyrite, 5% pyrite and 5% magnetite. Sample takenfrom an area of average mineralization seen. |
K487263 | SHOWING #5 | 345733 | 5562206 | Grab | Sample contains 10% chalcopyrite, 5% pyrite and alittle sphalerite from a portion of trenched on outcrop in the lowerpart of the trench. Gneiss exposed in the upper outcrop above. Gneissand limestone exposed in lower outcrop. A 20m wide by 20m long areahas been trenched and blasted on. Several areas found with up to 15%sulphides but needs further exposing due to overburden, trees beingsloughed in. Moss cover is thick. |
K487264 | SHOWING #15 | 345756 | 5562064 | Grab | 50m tall vertical outcrop with 3m wide by 15m trenchbelow base of trench cuts through skarn-ifed rock and gneiss. Showingis at least 5m wide, likely more, but is covered by debris. The samplecontains skarn with disseminated chalcopyrite and minorpyrite/pyrrhotite with some isolated malachite. Sample contains 15%chalcopyrite, 5% sphalerite and 5% pyrite on average. Sample takenfrom an area of average mineralization in thelowest part of trench. |
K487265 | SHOWING #14 | 345761 | 5562091 | Grab | 20m tall vertical outcrop with a 3m x 4m open cutstriking into the side 3m deep into skarn-ifed rock with disseminatedup to massive sulphides. The showing is exposed over 10m wide and iscontinuous from previous showings along strike. A couple areas andgneiss seen 20m above the showing and interwoven with quartz andsulphides. The showing contain skarn/gneiss with disseminated to semimassive chalcopyrite and minor pyrite and sphalerite. This samplecontains 25% chalcopyrite, 5% pyrrhotite, 5% sphalerite and 10%pyrite. Sample taken from an area of average mineralization. |
K487266 | SHOWING #14 | 345761 | 5562077 | Grab | 20m tall vertical outcrop with a 3m x 4m open cutstriking into the side. 3m deep into skarn with disseminated up tomassive sulphides. The showing is exposed over 10m wide and iscontinuous on strike of sample K487265. The second sample from theshowing contains skarn with semi massive chalcopyrite and pyrite, withsome minor sphalerite. Sample contains 30% chalcopyrite, 5% magnetite.5% sphalerite, 10% pyrite. Sample taken from an area of averagemineralization compared to other samples removed. |
K487267 | SHOWING #20 (Adit #1) | 345746 | 5561975 | Grab | Semi-massive chalcopyrite attached to gneiss from dumpwith minor pyrite. Sample was 50% mineralized with 20% chalcopyrite,5% sphalerite and 25% pyrite |
K487268 | SHOWING #18 (Adit #1) | 345746 | 5561992 | Grab | Inside mine adit #1. Grab from 20cm patch ofchalcopyrite in quartz inside the mine in the center of a large 3mwide white quartz vein. Sample is 2m from the limestone contact insideby the base of the raise. Sample contained 30% chalcopyrite. |
K487272 | SHOWING #19 (Adit #1 Opencut) | 345739 | 5561990 | Grab | Massive chalcopyrite in the hanging wall above theopencut at adit #1. Sample attached to gneiss and skarn. Sample hadmalachite, azurite patches/staining on chalcopyrite and contained 50%chalcopyrite, 5-7% sphalerite and minor pyrrhotite, pyrite. |
CEO Peter Bell comments, "I believe the Santa Anna project hassignificant potential.”
“MOUNT SICKER”
The following assays were previously reported byKermode on December 18, 2023. The samples were taken fromapproximately thirteen areas of interest as part of an ongoingsampling program that commenced in October, 2023. Kermode previouslypublished pictures of these samples and videos showing the explorationfield work done to collect these samples and others.
Assays for Chip Samples from MOUNTSICKER | ||
Sample No. | Copper (% Cu) | Width (metres) |
K487452 | 5.92 | 1.75 |
K487453 | 4.43 | 4 |
K487454 | 2.01 | 0.35 |
K487455 | 3.26 | 0.75 |
K487457 | 0.26 | 1 |
K487458 | 5.85 | 1 |
K487460 | 1.47 | 2 |
Links to videos showing the prospecting for thesesamples are provided below.
Video Title | Field Work video link |
“New Road Cut Exposes Large Copper Showing At TheMount Sicker Property!” | |
“Abandoned Mines With Mineralized Quartz VeinsEverywhere!” | |
“Historic Dozer Trench Exposed 100m of MineralShowings!” |
Further information about all rock samples is providedbelow.
Details for Chip Samples from MOUNTSICKER | |||
ID | EASTING (ZONE 10N) | NORTHING (ZONE 10) | Details |
K487452 | 444576 | 5413415 | Chip over a quartz, pyrite, chalcopyrite vein at lower911 SHOWING. |
K487453 | 444599 | 5413415 | Vein of silicified schists with grey-white quartzveining sulphides in the foliations of schists and semi-massivesulphides in the quartz-rich areas. 40-70% sulphides. By drilling,vein is 4.4m wide. |
K487454 | 444750 | 5413373 | Tom's shaft wall which used to be partially flooded,road building drained shaft which is 4-5m deep Patch of semi-massivepyrite with minor stringer chalcopyrite woven through coarse pyrite.Host is silicified schist with quartz. |
K487455 | 444424 | 5413474 | The Tuna Adit, undocumented adit, 16m long adit cuttingthrough, schist, chert, silicified rock and quartz veins. Sample had20% pyrite and 10% chalcopyrite. Sample from center of partiallyflooded adit. Below 911 SHOWING near the old road. |
K487457 | 444771 | 5413352 | Sample of coarse, grey, semi-massive pyrite insilicified schists with quartz, no visible chalcopyrite along old mainroad. Second showing exposed across the road 20m away. |
K487458 | 444612 | 5413413 | Silicified and cherty schists with quartz andgold-blue-black chalcopyrite exposed across a 1m area. Located 20mbefore the 4m chip sample. Sulphides are chalcopyrite at 25% andpyrite at 15% on average. |
K487460 | 444600 | 5413383 | Dozer trench sample over 2m of mineralized quartz,silicified schists, chert. The entire 100m long trench is mineralizedwith varying amounts of pyrite and chalcopyrite Sample taken. 35m upin dozer trench. Sample contains 7-10% pyrite and 5-7%chalcopyrite. |
CEO Peter Bell comments, "There is approximately 300m alongthe logging road where Kermode has focused exploration work at the 911SHOWING, including a composite chip sample over approximately 80metres and 9 drill holes totalling approximately 55 metres using abackpack drill. We continue to cut samples using a rock saw.”
A photograph of the outcrop at the 911 SHOWING isprovided below.
Pictures of saw-cut samples from the911 Showing at Mount Sicker.
Picture of road build material atthe 911 Showing
“BLACK PANTHER”
The following assays were previously reported byKermode on January 8, 2024. The samples were taken from approximatelythirteen areas of interest as part of an ongoing sampling program thatcommenced in August, 2023. Kermode previously published pictures ofthese samples and videos showing the exploration field work done tocollect these samples and others.
Sample Number | Gold (ppm Au) | Sample Type |
K487273 | 14.8 | 2.0 m |
K487274 | 17.1 | 1.1 m |
K487630 | 6.2 | Float |
K487634 | 6.2 | Chip |
K487275 | 73.9 | Float |
Videos showing the prospecting for some of thesesamples are provided below:
Video Title | Field Work video link |
“Magnificent Chalcopyrite In WasteRock Pile!” | |
“Massive Sulphide Chunks CementedIn The Road Bank!” |
Further information about all rock samples is providedbelow.
Rock Sample Details for BLACK PANTHERProperty | |||||
Sample Number | Location | EASTING | NORTHING | Type | Details |
K487273 | Near Panther Minfile Area | 381383 | 5438534 | 2.0 m | 7m area with veins up to 10cm and pods of pyrite up to50cm. Mineralization is semi-massive to massive. Sample from a 40cmwide pod containing 80% pyrite and 10% brown/red sulphides, minorchalcopyrite. The host is Basalt with chlorite-epidote-carbonatealteration. |
K487274 | 200m From Panther Minfile Area | 381354 | 5438487 | 1.1 m | 3m wide area of oxidation which has disseminated -massive pyrite. Near vertical vein of massive pyrite with minorchalcopyrite. Basaltic host with carbonate/epidote alteration. Sampleacross all mineralized portions. |
K487630 | 270m From Father & Son Creek | 380101 | 5440963 | Float | 30m wide area on newly cut road 500m from Thistle and270m from Father & Son Creek. Cemented Overburden contained 11float rocks up to 15 kg. A sample broken from a 15kg boulder contained30% chalcopyrite, 30% pyrite and 20% magnetite. |
K487634 | Thistle Mine Lower GloryHole | 380460 | 5440555 | Chip | Chip sample taken from an area of mineralization atleast 2m wide in the left part of Lower Glory Hole. Grey siliceousvolcanic with 30% chalcopyrite and 10% pyrite.Abundant malachite and azurite staining. |
K487275 | Tan Minfile/B&K Minfile | 384465 | 5439501 | Float | Float sample from a 20 kg quartz sulphide chunk with15% pyrite, 15% chalcopyrite, 5% galena, and possible disseminatedvisible gold. The sample is heavily disseminated in white quartz in acreek 300m above Tan Minfile but likely travelled from further up nearB&K as the boulder was moderately rounded. |
Property Option Deal Terms
LUCKY STRIKE:
-
-- To earn 100% ownership of theproject, Kermode must make these payments.
-
-- 900,000 common shares ofKermode on or before July 19, 2024. In addition to the payment of900,000 common shares made on July 19, 2022 and 900,000 common sharesmade on July 19, 2023.
-
-- The Net Smelter Return royaltyis set at 2% two percent with a buy-down of $1M one million dollars toreduce the royalty to 1% one percent.
-
-- There are no SalesParticipation Rights, nor work commitments.
SANTA ANNA:
-
-- To earn 100% ownership of theproject, Kermode must make these payments.
-
-- 2,800,000 common shares ofKermode on or before Septemer 21, 2025 and 3.500,000 common shares ofKermode on or before September 21, 2028. In addition to the payment of2,100,000 common shares made on September 21, 2023.
-
-- The Net Smelter Return royaltyis set at 2% two percent with a buy-down of $3.5M three and a halfmillion dollars to eliminate the royalty.
-
-- The Sales Participation Right(SPR) is set at 7% seven percent of gross proceeds of any transactionin the next ten years.
-
-- There are no work commitments.
MOUNT SICKER:
-
-- To earn 100% ownership of theproject, Kermode must make these payments.
-
-- Cash payments totalling$210,000 by September 21, 2029.
-
-- Common shares paymentstotalling 20,000,000 in a series of payments before September 21,2029. Kermode has not paid any shares yet.
-
-- The Net Smelter Return royaltyis set at 2% two percent where half can be eliminated for one milliondollars $1,000,000.
-
-- The Sales Participation Right(SPR) is set at 5% five percent of gross proceeds of any transactionin the next ten years.
-
-- There are no work commitments.
BLACK PANTHER:
-
-- To earn 100% ownership of theproject, Kermode must make these payments.
-
-- Common shares paymentstotalling 3,600,000 in a series of payments before August 26, 2026. Inaddition to the payment of 1,200,000 common shares made on August 11,2023.
-
-- The Sales Participation Right(SPR) is set at 30% thirty percent of gross proceeds of anytransaction in the next ten years.
-
-- The Net Smelter Return royaltyis set at 3% three percent with a buy-down of $6M six million dollarsto eliminate the royalty.
Qualified Person
The technical information in this news release has beenreviewed and approved by Mr. Jacques Houle, P. Eng, a Qualified Personresponsible for the scientific and technical information containedherein under National Instrument 43-101 standards. Mr. Houle isindependent to Kermode.
QA/QC Statement
The most recent work conducted on the subject propertyby the Company utilized commercial laboratories for all geochemicalanalyses and was conducted using industry-standard chain of custodyprocedures with all samples. Due to the preliminary nature of thefield geochemistry programs, no blind analytical blanks and standardswere utilized by the Company; and only the internal proceduresemployed by the commercial laboratories were utilized for QA/QCprotocols. The Qualified Person is satisfied that these proceduresand protocols are sufficient for the current status of the subjectproperty. The assays were completed by ALS Canada Ltd. in Vancouver,BC.
About Kermode
Kermode is a junior mining company hunting forexploration opportunities around the world.
On Behalf of the Board of Directors,
KERMODE RESOURCES LTD
"Peter Bell"
President/CEO
For further information please contact:
Tel: 1-250-588-6939
Email: peterbellmining@gmail.com
Website: https://linktr.ee/kermoderesources
Neither the TSX Venture Exchange norits Regulation Services Provider accepts responsibility for theadequacy or accuracy of this release.
Forward-Looking Statements
This news release contains statements that constitute"forward-looking statements" within the meaning ofapplicable Canadian and United States securities legislation(collectively herein referred to as "forward-lookinginformation"). Such forward looking statements involve known and unknown risks, uncertainties andother factors that may cause Kermode actual results, performance orachievements, or developments in the industry to differ materiallyfrom the anticipated results, performance or achievements expressed orimplied by such forward-looking statements.
Forward-looking statements in this document include butnot limited to results, analyses and interpretations of explorationprograms; our grassroots exploration program, geological andmineralization interpretations and the plans, results, costs, andtiming thereof. Although Kermode believes the forward-lookinginformation contained in this news release is reasonable based oninformation available on the date hereof, by their natureforward-looking statements involve assumptions, risks, uncertaintiesand other factors which may cause our actual results, performance orachievements, or other future events, to be materially different fromany future results, performance or achievements expressed or impliedby such forward-looking statements.
This list is not exhaustive of the factors that mayaffect any of our forward-looking information. Although we haveattempted to identify important factors that could cause actualresults, actions, events, conditions, performance, or achievements todiffer materially from those contained in forward-looking information,there may be other factors that cause results, actions, events,conditions, performance, or achievements to differ from thoseanticipated, estimated or intended.
The forward-looking information contained in this newsrelease represents the expectations of the Company as of the date ofthis news release and, accordingly, is subject to change after suchdate. Readers should not place undue importance on forward-lookinginformation and should not rely upon this information as of any otherdate. While the Company may elect to, it does not undertake to updatethis information at any particular time except as required inaccordance with applicable laws.
Copyright (c) 2024 TheNewswire - All rights reserved.