MARKET WIRE NEWS

EMP METALS COMMENCES RE-ENTRY OPERATIONS ON BRACKISH WATER WELL

MWN-AI** Summary

EMP Metals Corp. has announced the commencement of re-entry operations at its brackish water well 5-23-7-9W2, located near the Project Aurora Demonstration Plant in Southern Saskatchewan. The service rig required for these operations has arrived on-site, and they are expected to take approximately ten days to complete. Key steps in this work program include isolating the upper section of the wellbore, perforating the targeted brackish water interval, and swabbing the well to obtain water samples and establish a sustained fluid level.

This re-entry is part of EMP Metals’ strategic efforts to harness additional low salinity brackish water sources, which are critical for advancing its lithium extraction and refining initiatives. The brackish water will be integrated into the Project Aurora Demonstration Plant, which is designed to optimize a continuous flow, modular lithium extraction and refining model. This project, a collaboration with Saltworks Technologies Inc., aims to drive down costs and simulate full-scale operations for a planned 3,000+ tonne per year modular commercial refinery.

EMP Metals currently holds over 205,000 net acres of resource-rich land and is focused on utilizing direct lithium extraction technologies to develop its projects efficiently. While the company is optimistic about its efforts, management notes that forward-looking statements regarding the project’s success are inherently uncertain and subject to various risks and factors, including regulatory compliance and securing financing.

Overall, the successful execution of the re-entry operations and subsequent incorporation of brackish water into Project Aurora represent significant steps in EMP Metals’ mission to advance lithium extraction processes and scale up production capabilities.

MWN-AI** Analysis

EMP Metals Corp. (CSE: EMPS) is poised for a significant operational milestone as it embarks on re-entry operations at its existing brackish water well (5-23-7-9W2). This step, part of a broader strategy to integrate the brackish water source into the Project Aurora Demonstration Plant, highlights the company's commitment to advancing its lithium extraction capabilities through innovative technologies.

Investors should take note of the strategic importance of this operation. The brackish water well's proximity to Project Aurora not only promises potential cost savings but also facilitates testing that could lead to the identification of additional low salinity water sources. The planned use of advanced direct lithium extraction (DLE) methods indicates EMP Metals' forward-thinking approach to Lithium extraction, which aims to streamline processes and enhance profit margins.

The collaboration with Saltworks Technologies is particularly noteworthy, as it underscores the company's intent to innovate and refine its approach to lithium production. With Saltworks advancing plant design for a commercial refinery capable of processing over 3,000 tonnes per year, this partnership may yield scalability that supports robust commercial growth.

However, potential investors should remain cognizant of certain risks. EMP Metals operates in an evolving sector affected by market volatility, regulatory hurdles, and operational uncertainties—issues heavily emphasized in their forward-looking statements. The successful execution of re-entry operations and subsequent testing will be critical in affirming the viability of EMP’s planned scale-up and experimental models.

In summary, while EMP Metals is navigating a promising trajectory with its innovative approaches to lithium extraction, prudent investors should carefully evaluate associated risks and remain abreast of operational updates. Long-term potential appears strong, contingent upon successful operational execution and favorable market conditions.

**MWN-AI Summary and Analysis is based on asking OpenAI to summarize and analyze this news release.

Source: Canada Newswire

Canada NewsWire

VANCOUVER, BC, Feb. 5, 2026 /CNW/ - EMP Metals Corp. (CSE: EMPS) (OTCQB: EMPPF) (FSE: 9ST) ("EMP Metals" or the "Company") is pleased to report that the service rig to be used for the re-entry of the existing brackish water well 5-23-7-9W2 (the "Well") has arrived on location (see Figure 1) and commenced re-entry operations (see press releases dated January 27 and January 30, 2026).

The work program includes isolating an upper section of the existing wellbore, perforating the targeting brackish water interval, and swabbing the well at maximum swabbing rates to obtain water samples and establish a sustained fluid level. 

Re-entry operations and testing are expected to take approximately 10 days to complete.

Once the service rig re-entry operations are completed, the Company will begin planning the integration of the brackish water source into the Project Aurora Demonstration Plant.

The existing Well is in close proximity to the Project Aurora Demonstration Plant site and testing is an important and cost-effective step in identifying additional, low salinity, brackish water sources for continued advancement towards commercial production scale up. 

The Project Aurora Demonstration Plant will establish, test, and optimize a wellhead connected, continuous flow, modular Hub and Spoke lithium extraction and refining model. The on-site program aims to unlock performance improvements and cost savings while de-risking future investments.  Project Aurora, a joint initiative between EMP Metals and Saltworks Technologies Inc. ("Saltworks"), is aimed at driving down costs, simplification, and leveraging the best available and most economic and innovative technology.  As part of the collaborative's launch, Saltworks will advance full-scale plant design and cost estimates for a 3,000+ tonne per year modular, repeatable, commercial refinery for EMP Metals utilizing data and insights from the demo plant project.

About EMP Metals

EMP is a Canadian-based lithium exploration and development company focused on large-scale resources using direct lithium extraction (DLE). EMP currently holds over 205,000 net acres (83,000 hectares) of Subsurface Dispositions and strategic wellbores in Southern Saskatchewan.

Forward-Looking Statements

Information set forth in this news release contains forward-looking statements that are based on assumptions as of the date of this news release. These statements reflect management's current estimates, beliefs, intentions and expectations. They are not guarantees of future performance. EMP Metals cautions that all forward-looking statements are inherently uncertain, and that actual performance may be affected by a number of material factors, many of which are beyond EMP Metals' control. Such factors include, among other things: risks and uncertainties relating to EMP Metals' limited operating history, ability to obtain sufficient financing to carry out its exploration and development objectives on its mineral properties, obtaining the necessary permits to carry out its activities and the need to comply with environmental and governmental regulations. Accordingly, actual and future events, conditions and results may differ materially from the estimates, beliefs, intentions and expectations expressed or implied in the forward-looking information. Except as required under applicable securities legislation, EMP Metals undertakes no obligation to publicly update or revise forward-looking information.

The Canadian Securities Exchange has neither approved nor disapproved the information contained herein and does not accept responsibility for the adequacy or accuracy of this news release.

SOURCE EMP Metals Corp.

View original content to download multimedia: http://www.newswire.ca/en/releases/archive/February2026/05/c1950.html

FAQ**

How does EMP Metals Corp. EMPS:CC plan to leverage data from the re-entry operations of the brackish water well to enhance the efficiency of the Project Aurora Demonstration Plant?

EMP Metals Corp. plans to analyze data from the brackish water well re-entry operations to optimize resource extraction and processing methodologies at the Project Aurora Demonstration Plant, aiming to improve overall operational efficiency and sustainability.

What are the expected outcomes from isolating and perforating the upper section of the wellbore during the re-entry operations by EMP Metals Corp. EMPS:CC?

Isolating and perforating the upper section of the wellbore during EMP Metals Corp's re-entry operations is expected to enhance resource recovery, improve flow rates, and allow for targeted extraction of valuable minerals or resources from the well.

In what ways does EMP Metals Corp. EMPS:CC anticipate that the integration of the brackish water source will impact the commercial production scale-up of lithium extraction?

EMP Metals Corp. anticipates that integrating the brackish water source will enhance lithium extraction efficiency, reduce operational costs, and enable a more sustainable, scalable approach to commercial production while addressing water resource challenges.

Can EMP Metals Corp. EMPS:CC elaborate on the unique technologies being utilized in this project in collaboration with Saltworks Technologies Inc. for optimizing lithium extraction?

EMP Metals Corp. is utilizing innovative direct lithium extraction technologies in collaboration with Saltworks Technologies Inc. which incorporate advanced evaporation and filtration processes to enhance efficiency and sustainability in lithium extraction from brine sources.

**MWN-AI FAQ is based on asking OpenAI questions about EMP Metals Corp Com (OTC: EMPPF).

EMP Metals Corp Com

NASDAQ: EMPPF

EMPPF Trading

0.0% G/L:

$0.437 Last:

1,666 Volume:

$0.437 Open:

mwn-ts Ad 300

EMPPF Latest News

EMPPF Stock Data

$54,271,023
69,438,682
7.05%
2
N/A
Mining
Materials
CA
Vancouver

Subscribe to Our Newsletter

Link Market Wire News to Your X Account

Download The Market Wire News App