MARKET WIRE NEWS

Leocor Mining Drills 28.5 g/t Au over 0.4m at Dorset Gold Project, Baie Verte, Newfoundland

Source: TheNewsWire

(TheNewswire)

Vancouver, BritishColumbia – TheNewswire - August 6, 2025 - Leocor Mining Inc. (the “ Company ” or “ Leocor ”) (CSE: LECR, OTCQB: LECRF;Frankfurt: LGO0) (formerly Leocor Gold Inc.), a juniorresource company focussed on the exploration and development ofprecious metals  projects in Eastern Canada, is pleased to report final assayresults from its recently completed drill program at the Dorsetprospect, located within the Company’s 2,002-ha contiguous BaieVerte gold-copper exploration project.  The Baie Verte project (“TheProject”) is situated on the north centralcoast of the island of Newfoundland in the province of Newfoundlandand Labrador, Canada.

The complete geochemical results received from SGSCanada, support the results of previous exploration at the project andconfirm the presence of orogenic gold mineralization at Dorset.

Gold Highlights Include:

Drillhole 25-DR-001

  • 0.5m of 3.25 g/t Au within 1.1m of1.61 g/t Au beginning at 42.5m downhole

  • 0.3m of 1.07 g/t Au beginning 100.3m downhole

Drillhole 25-DR-005

  • 0.6m of 1.13 g/t Au within 1.1m of 0.67g/t beginning 37.0m downhole

  • 0.4m of 28.5 g/t Au beginning 76.9m downhole

Further significant results from the drilling programare presented in Table 1, and images of the 25-DR-005 highlights arepresented below in Figures 1 and 2.


Click Image To View Full Size

Figure 1 .Samples 229763 and 229764 in hole 25-DR-005 which ran 0.12 g/t Au and1.13 g/t Au respectively for a length weighted composite of 0.67g/tover 1.1m from 42.5m downhole


Click Image To View Full Size

Figure 2 . Sample229771 in hole 25-DR-005 which ran 28.5g/t Au over 0.4m drilledlength.

The Dorset drill holes successfully followed up theCopper Creek drill program, the results of which were announced in theCompany’s News Release dated July 8, 2025.   These results

support preliminary interpretations that the claimsrepresent the stockwork feeder zone of a Volcanogenic Massive Sulphide(“VMS”) mineralizing system. In addition to stockwork chalcopyritemineralization the program identified additional hallmarks of VMSsystems including anomalous zinc mineralization and lenses of massiveand semi-massive pyrite.

Results reported July 8 include the following Copperhighlights:

  • 3.6m of 1.49 % Cu Including 0.9m of3.22 % Cu within 6.1m of 0.99 % Cu inhole CC-25-001 beginning at 31.7m downhole

  • 6.6m of 0.44 % Cu Including 0.6m of1.97 % Cu in hole CC-25-002 beginning at 15.2mdownhole

  • 3.6m of 0.66 % Cu Including 1.8m of0.92 % Cu Within 6.0m of 0.45 % Cu inhole 25-CC-006 beginning at 19.0m downhole.

  • 4.1m of 0.56 % Cu Including 1.4m of1.43 % Cu in hole 25-CC-014 beginning at 45.7mdownhole.

Zinc highlights include:

  • 3.0m of 0.34 % Zn Including 1.0m of0.69% Zn in hole 25-CC-006 beginning at 47mdownhole.

“The overall results of the 2025 drill program at ourBaie Verte project proved fruitful,” said Alex Klenman, CEO ofLeocor Mining.  “We were able to confirm the presence of a VMSsystem in a maiden effort at Copper Creek.  The Dorset claimscontinue to generate positive gold values. We are immediately planningfollow up work to prepare for further drilling.  We’re pleased withthe results to date and are eager to continue development of the BaieVerte project,” continued Mr. Klenman.

Modelling work is underway to place these resultswithin the geological context of the project and the Company isplanning follow-up exploration activities to evaluate the potential ofthis mineral system.  Specifics of the next round of work will beannounced shortly.

Significance of These Results

The Baie Verte Peninsula hosts a well-documentedmineral endowment, including several significant gold occurrences andmines associated with the regional Baie Verte Lineament (BVL), Thisgeological setting is conducive to the development of epigenetic goldmineralization, which is supported by a strong correlation withiron-rich rock types. Similar mineralization is documented at nearbyprospects, including the past producing Goldenville and Nugget PondMines as well as currently producing Pine Cove and StogertiteDeposits. Gold associated with proximal VMS deposits in the region isalso interpreted to be epigenetic in origin Figure 3 below outlinesnotable mineral deposits within the Baie Verte Peninsula.


Click Image To View Full Size

Figure 3. Notable Mineral depositson the Baie Verte Peninsula

Dorset Drilling

At the end of March 2025, the company completed acampaign comprising six diamond drillholes totalling 732 meters atDorset. The program was designed to follow up on significant goldanomalism in field sampling, trenching, and historical drillholecampaigns which were originally focused on surficial alteration andoutcropping veins. The 2025 program represents the first diamonddrilling campaign undertaken at Dorset by Leocor. Drillhole Collarinformation is detailed in Table 1.

Table 1 . Drillhole Collarinformation for the 2025 Dorset diamond drilling program

Hole ID

Easting

Northing

Dip

Azimuth

Length

25-DR-001

555060.8

5527022.5

-45

140

173

25-DR-002

555034.3

5527067.0

-45

140

125

25-DR-003

555061.7

5527020.5

-70

140

128

25-DR-004

555107.8

5526982.8

-45

140

131

25-DR-005

555376.6

5527045.0

-45

120

86

25-DR-006

555359.8

5527075.2

-45

140

89

Table 2 . Significant Goldintercepts from the Dorset Prospect, Baie Verte Project, Newfoundlandand Labrador. Core lengths are presented, and true widths are unknowncurrently. Significant intervals defined as composite intervals with alength weighted average grade above 0.1 g/t Au over any drilledlength

Hole ID

From (m)

To (m)

Length (m)

Grade (g/t Au)

25-DR-001

14.8

16.8

2.0

0.09

Including

16.4

16.8

0.4

0.23

25-DR-001

32.9

33.4

0.5

0.10

25-DR-001

37.5

38.0

0.5

0.22

25-DR-001

42.5

43.6

1.1

1.61

Including

42.5

43.0

0.5

3.25

25-DR-001

49.0

49.5

0.5

0.27

25-DR-001

72.4

75.5

3.1

0.38

including

72.7

73.3

0.6

0.70

and

74.7

75.5

0.8

0.57

within

67.5

75.5

8.0

0.20

25-DR-001

100.3

100.6

0.3

1.07

25-DR-001

105.7

106.1

0.4

0.29

25-DR-001

117.8

118.4

0.6

0.14

25-DR-001

140.3

140.8

0.5

0.12

25-DR-001

146.8

147.8

1.0

0.21

25-DR-001

158.2

158.5

0.3

0.36

25-DR-002

14.9

16.2

1.3

0.41

Including

15.6

16.2

0.6

0.62

25-DR-002

20.6

21.9

1.3

0.24

Including

21.5

21.9

0.4

0.34

25-DR-003

7.7

8.1

0.4

0.40

25-DR-004

12.0

13.0

1.0

0.14

25-DR-004

35.8

36.1

0.3

0.77

25-DR-004

62.4

62.7

0.3

0.14

25-DR-004

64.8

65.1

0.3

0.22

25-DR-004

75.4

76.1

0.7

0.11

25-DR-004

79.9

80.9

1.0

0.33

25-DR-005

36.5

37.6

1.1

0.67

Including

37.0

37.6

0.6

1.13

25-DR-005

76.9

77.3

0.4

28.50

25-DR-006

8.1

8.4

0.3

0.22

25-DR-006

42.6

43.6

1.0

0.19


Click Image To View Full Size

Figure 4: Location of the Baie VerteProject, NW Newfoundland

For more information regarding Leocor’s Baie VerteProject, including detailed figures, assessment details, and historicdata, please visit our website .

Qualified Person

David Murray, P.Geo., Principal Consultant atResourceful Geoscience Solutions, A Consultant to Leocor is anIndependent Qualified Person within the meaning of National Instrument43-101 Standards of Disclosure for Minerals Projects, has reviewed andapproved the technical information presented herein.

Laboratory Technical Note

Analytical services were provided by SGS Canada, whichis an independent, CALA-accredited analytical services firm registeredto ISO 17025 standard. A 3 rd party contractor was employed to half drillcore by sawing. This contractor transported core between the logging,sawing and Laboratory locations. Sample Preparation took place atSGS’ facility in Grand Falls-Windsor, Newfoundland and Labrador,analysis was conducted at SGS Burnaby British Columbia. Samples werecrushed to 75% passing 2 mm, riffle split 250 g and pulverized to 85%passing 75 microns. Au assays were conducted on 30g of pulverizedmaterial using the Fire Assay method with a 4-acid digestion.Multi-element analyses, including base metals, were conducted onpulverized material using the ICP method for 40 elements. Laboratoryover-limits analysis methods were applied as required. A systematicQAQC protocol was employed that includes systematic insertion in thesample stream of certified reference materials and blank samples, plusanalysis of duplicate pulp splits and ¼ core duplicates.

Technical Reference

Hibbard, J., 1983, Geology of the Baie Verte Peninsula,Newfoundland: Mineral Development division Department of Mines andEnergy, Government of Newfoundland and Labrador

About Leocor Mining Inc. (Formerly Leocor Gold Inc.)

Leocor Mining Inc. is a British Columbia-based resourcecompany involved in the acquisition and exploration of precious metalprojects, with a current focus in Atlantic Canada.  Leocor, throughoutright ownership and earn-in agreements, currently controls severalgold-copper projects in prime exploration ground located within theprolific Baie Verte Mining District.  Leocor’s Bae Verte portfolioincludes the Dorset, Dorset Extension, Copper Creek and Five MileBrook projects, creating a contiguous ~2,000-hectare explorationcorridor.  For more information, sign up for news alerts ,watch our corporatevideo , or view our presentation at our website .

Contact Information

Leocor Mining Inc.

Alex Klenman, Chief Executive Officer

Email : aklenman@leocorgold.com

Telephone : (604) 970-4330

Neither the CanadianSecurities Exchange nor its Regulation Services Provider (as that termis defined in the policies of the Canadian Securities Exchange)accepts responsibility for the adequacy or accuracy of thisrelease .

Cautionary Statements Regarding Forward-LookingInformation

This press release contains forward-looking informationwithin the meaning of Canadian securities laws. Such informationincludes, without limitation, information regarding the terms andconditions of the Option. Although Leocor believes that suchinformation is reasonable, it can give no assurance that suchexpectations will prove to be correct.

Forward looking information is typically identified bywords such as: “believe”, “expect”, “anticipate”,“intend”, “estimate”, “postulate” and similar expressions,or are those, which, by their nature, refer to future events. Leocorcautions investors that any forward-looking information provided byLeocor is not a guarantee of future results or performance, and thatactual results may differ materially from those in forward lookinginformation as a result of various factors, including, but not limitedto: the agreement of the parties to proceed with the proposedtransaction on the terms set out in the Option Agreements or at all;Leocor's ability to exercise the Options; the state of the financialmarkets for Leocor's securities; the state of the natural resourcessector in the event the Option, or any of them, are completed; recentmarket volatility; circumstances related to COVID-19; Leocor's abilityto raise the necessary capital or to be fully able to implement itsbusiness strategies; and other risks and factors that Leocor isunaware of at this time. The reader is referred to Leocor's initialpublic offering prospectus for a more complete discussion ofapplicable risk factors and their potential effects, copies of whichmay be accessed through Leocor’s issuer page on SEDAR atwww.sedar.com.

The forward-looking statements contained in this pressrelease are made as of the date of this press release. Leocordisclaims any intention or obligation to update or revise anyforward-looking statements, whether as a result of new information,future events or otherwise, except as required by law.

Copyright (c) 2025 TheNewswire - All rights reserved.

Leocor Gold Inc.

NASDAQ: LECR:CC

LECR:CC Trading

-2.63% G/L:

$0.37 Last:

81,000 Volume:

$0.38 Open:

mwn-alerts Ad 300

LECR:CC Latest News

LECR:CC Stock Data

$0
0
N/A
N/A

Subscribe to Our Newsletter

Link Market Wire News to Your X Account

Download The Market Wire News App