Montréal – TheNewswire - March 4, 2026 St-Georges Eco-Mining Corp.(CSE: SX) (OTCQB: SXOOF) (FSE:85G1) is pleased to provide an operationalupdate on the lithium processing pilot plant being advanced by itswholly owned subsidiary, St-Georges Metallurgy Corp., in collaborationwith its technology partner Coalia. Natural Resources Canada issupporting Coalia’s lithium pilot plant project with a now $4.0million investment through the Critical Minerals Research, Developmentand Demonstration program.

During the commissioning phase, St-Georges MetallurgyCorp. (SXM) received approximately five (5) tonnes of spodumeneconcentrate from Canadian mining operations qualifying under theCompany’s research program, as well as approximately 900 kg oflithium-ion battery black mass for future processing efforts.

To date, SXM and Coalia have processed approximatelythree (3) tonnes of spodumene concentrate at leaching phase, withpilot plant operations progressing as planned. The Company alsoconfirms that a new filter press has been installed, effectivelydoubling filtration capacity and supporting increased throughput ascommissioning advances.

Technical Test Work

Preliminary leaching tests conducted to validate theprocess conditions for pilot-scale operation demonstrated encouraginglithium recovery kinetics and controlled residue behavior across thespodumene samples evaluated. These results support the transition tothe pilot-scale commissioning currently underway. Selected laboratorytest results supporting pilot plant design are presented below:

Figure 1 – Lithium Recovery vs Time(hr.) (Laboratory Results)


Click Image To View Full Size

Figure 2 – Solid Residue Yield vsTime (hr.) (Laboratory Results)


Click Image To View Full Size

Figure 3 – Acid Consumption vs Time(hr.) (Laboratory Results)

Comprehensive leaching test results from pilot-scalespodumene campaigns are expected toward the end of March, whilepilot-scale black mass leaching tests are anticipated to follow inearly April, subject to ongoing commissioning progress.

The partners continue advancing the installation of thefirst purification stage, a key component for lithium solutionconcentration and downstream product generation. While most equipmenthas been received and installed, completion is pending delivery of atransformer required for operation. Final commissioning of the firstpurification stage is currently expected within the comingweeks.

 

Mathieu Boudreau, P. Eng. and scientist at Coalia,commented: “The preliminarylaboratory work provided a strong foundation for pilot operations, andthe commissioning progress achieved to date is encouraging. Theinstallation of additional filtration capacity and the upcomingevaporation stage will position the pilot plant to generatecomprehensive pilot-scale results in the coming months.”

Frank Dumas, St-Georges’ chairman added:“The SXM pilot plantcontinues to advance through commissioning with increasing throughputand infrastructure upgrades. Processing Canadian spodumenefeedstock reinforces thestrategic relevance of this program and supports the development ofdomestic lithium processing capabilities.”

Expected next steps:

- Completion and commissioning of the firstpurification stage.
- Continued spodumene pilot campaigns and data collection.
- Initiation of pilot-scale black mass leaching tests.
- Release of comprehensive pilot-scale results in Q2 2026.

 

ON BEHALF OF THE BOARD OF DIRECTORS

‘Neha Tally’

NEHA TALLY
Corporate Secretary

About St-Georges Eco-Mining Corp.

St-Georges develops new technologies and holds adiversified portfolio of assets and patent-pending IntellectualProperty within several highly prospective subsidiaries including:EVSX, a leading North American advanced battery processing andrecycling initiative; St-Georges Metallurgy, with metallurgicalR&D and related IP, including processing and recovering high gradelithium from spodumene; Iceland Resources, with high grade goldexploration projects including the flagship Thor Project; H2SX,developing technology to convert methane into solid carbon andturquoise hydrogen; and Quebec exploration projects including theManicouagan and Julie nickel, copper and PGE critical mineral projectson Quebec’s North-Shore, and Notre-Dame niobium Project in LacSt-Jean.

Visit the Company website at www.stgeorgesecomining.com

 

For all other inquiries: public@stgeorgesecomining.com

 

The Canadian Securities Exchange(CSE) has not reviewed and does not accept responsibility for theadequacy or

the accuracy of the contents of thisrelease.

Copyright (c) 2026 TheNewswire - All rights reserved.

St-Georges Eco-Mining Corp

NASDAQ: SXOOF

SXOOF Trading

3.22% G/L:

$0.0353 Last:

11,830 Volume:

$0.0281 Open:

mwn-alerts Ad 300

SXOOF Latest News

SXOOF Stock Data

$11,723,252
291,454,577
5.01%
2
N/A
Mining
Materials
CA
Montreal

Subscribe to Our Newsletter

Link Market Wire News to Your X Account

Download The Market Wire News App