DBLVF - Doubleview Gold Corp shares key results from drilling at Buck Zone on Hat Project
(NewsDirect)
Doubleview Gold Corp CEO Farshad Shirvanijoined Steve Darling from Proactive to share an update regarding thecompany's drilling activities at the Buck Zone within the HatProject.
Doubleview Gold hasreleased assay results from its drilling efforts, with particularemphasis on the remarkable findings in drill hole H052. Thisparticular drill hole intersected an impressive span of over 500meters exhibiting robust copper and gold mineralization. Within thisextensive interval, a notable 211.2-meter section displayedconcentrations of 0.35 grams per ton of gold and 0.37% copper,culminating in a total copper equivalent of 1.33%.
Shirvani went on to explain that thesedrill holes effectively cover a substantial area of 150 meters by 260meters when projected to the surface. The selection of these specificdrill hole locations was meticulously executed to progressivelyincrease the volume of the Lisle deposit, a crucial component in theforthcoming resource estimation anticipated to be unveiled in thefirst quarter of 2024.
Furthermore,Shirvani highlighted the ongoing progress of the 2023 drillingcampaign at the Hat Project, emphasizing that the cumulative length ofdrilling for the current season has already surpassed an impressive8,000 meters.
These effortsunderscore Doubleview Gold Corp's commitment to thoroughly exploreand expand the Hat Project's potential, ensuring a comprehensiveunderstanding of the mineral resources present in this promisingregion.
In essence, these assay results represent a significantmilestone for Doubleview Gold Corp, reaffirming the company'sdedication to advancing their exploration efforts and unlocking thesubstantial mineral wealth present within the Hat Project, setting thestage for a promising future in the mining industry.
Contact Details
Proactive InvestorsCanada
+1 604-688-8158
na-editorial@proactiveinvestors.com
Copyright (c) 2023 TheNewswire - All rights reserved.