(NewsDirect)
Brunswick Exploration CEO Killian Charlesjoined Steve Darling from Proactive to share the final results fromits Mirage winter drilling campaign. The Mirage Project is located inthe Eeyou Istchee-James Bay region of Quebec, approximately 40kilometers south of the Trans-Taiga Road. The winter drill campaignfocused on the Central Zone and has continued to intersect wide andwell-mineralized intervals within the MR-6 dyke.
Charles told Proactive the drilling saw anew interval at the MR-6 dyke with 1.64% Li2O over 69.3 meters indrill hole MR-24-61 and 1.17% Li2O over 28.3 meters in drill holeMR-24-50 both starting from surface. The MR-9 dyke is locatedapproximately 600 meters northeast of MR-6, with 1.07% Li2O over 14.4meters in drill hole MR-24-45 and 2.00% Li2O over 4 meters in drillhole MR-24-51, now drill traced over 400 meters. Further evidence ofsignificant dyke stacking located 350 meters southeast of MR-6 wheredrill hole MR-24-59 intersected several mineralized pegmatite dykesall of which remain open in every direction.
The impressive lithium grades and widthsintersected at both MR-6 and MR-9 dykes highlight the potential of theMirage project to host significant lithium resources. The continuityof mineralization from surface and the extensive drilling data suggesta robust system that warrants further exploration.
The company is now preparing to announceits 2024 summer exploration program in the coming weeks, which willinclude extensive drilling and sampling activities not only at Miragebut also in northern Quebec, Labrador, and Greenland. This extensiveexploration program aims to expand the known mineralized zones, testnew targets, and ultimately enhance the resource base of BrunswickExploration.
Contact Details
Proactive NorthAmerica
+1 604-688-8158
na-editorial@proactiveinvestors.com
Copyright (c) 2024 TheNewswire - All rights reserved.