VANCOUVER, BC , Oct. 17, 2022 – First Energy Metals Ltd. ( CSE:FE ) ( OTCQB:FEMFD ) (” First Energy” or the ” Company ) is pleased to announce results of Phase 2 exploration program drill holes LC21-33 to 37 at its Augustus Lithium Property in Quebec , Canada. The drill hole LC21-35 intersected a 11.20-meter-wide zone with 0.91 percent (%) lithium oxide (Li 2 O) at 146 metres (m), including a 5 m zone with 1.03% Li 2 O at 146 m and 3.2 m with 1% Li 2 O at 154 m . This drill hole also has a lower seven meters wide zone with 0.54% Li2O at 165m drilled depth and several other smaller intercepts with variable lithium grades (see Table 2 for details).
Highlights
- Drill hole LC 21-33 intersected two zones; a 13.20-meter-wide zone with 0.08% Li2O at 2.7 m , and a 59.2- meters- wide zone with 0.07% Li2O at 34.8 m drilled depth.
- Drill hole LC 21-34 intersected two zones; a 11.73-meter-wide zone with 0.09% Li2O at 1.7 m , and a 75.3- meters- wide zone with 0.08% Li2O at 67.63 m drilled depth including a one-meter section of 1.49% Li2O at 81 m .
- The drill hole LC21-35 intersected a 11.20-meter-wide zone with 0.91 % Li2O at 146 m , including a 5 m zone with 1.03% Li2O at 146 m and 3.2 m with 1% Li2O at 154 m . There is another seven meters wide zone with 0.54% Li2O at 165 m drilled depth including...
Click here to read the full article on PressReach.com .Subscribe to the PressReach RSS feeds:
- Featured News RSS feed
- Investing News RSS feed
- Daily Press Releases RSS feed
- Trading Tips RSS feed
- Investing Videos RSS feed
Follow PressReach on Twitter
Follow PressReach on TikTok
Follow PressReach on Instagram
Subscribe to us on Youtube