MARKET WIRE NEWS

Arbor Metals Completes Phase 1 Diamond Drilling at Jarnet Lithium Project

Source: TheNewsWire

(TheNewswire)

Vancouver, Canada– January 7 th , 2025 – TheNewswire - Arbor MetalsCorp. (“ Arbor ” or the“ Company ”) ( TSXV: ABR,FWB: 432) is pleased to announce the completionof its Phase 1 diamond drilling program at its wholly owned JarnetLithium Project, located in the Corvette Lake Lithium Camp,Eeyou-Istchee Baie-James territory in Quebec North region. The Phase 1drilling campaign has successfully concluded with the completion of atotal of 10 NQ2 holes, for a combined drilling length of 1,913meters.

The drilling focused on six target areas within theJarnet 1 and Jarnet 2 claim groups. These targets were selected basedon anomalous soil and rock samples, in conjunction with geophysicalinterpretations performed earlier in the year. Hole depths ranged from89 meters to 302 meters, and the drilling yielded 663 core sampleswhich will be sent for immediate laboratory analysis with qualitycontrol material.

Granitic pegmatites were encountered and sampled innine of the ten drill holes, covering five of the six target areas.Notably, molybdenite was observed in pegmatitic quartz veins in fivedrill holes across three separate target zones. These veins are hostedin quartz monzonite.

Phase 1 drilling was performed by Forage etConstruction Muskw, a joint venture between Forage Fusion Drilling andthe Cree community, represented by Saskounan. Muskw, based inChisasibi, Quebec, is co-owned and predominantly operated by local andIndigenous stakeholders. Muskw’s involvement exemplifies the successof local and indigenous ownership and reinforces Arbor’s commitmentto community engagement and economic development in the regions whereit operates. Arbor extends its sincere gratitude to Muskw for theirexpertise, professionalism, and dedication to the project.

“We are thrilled to have completed this importantPhase 1 drilling program at the Jarnet Lithium Project,” said MarkFerguson, President and CEO of Arbor. “The successful completion of1,913 meters of drilling and the discovery of pegmatite intersectionsis a positive step forward in advancing our lithium explorationefforts. We look forward to receiving the assay results and continuingto explore the potential of this promising project.”

Arbor is committed to conducting all of its explorationactivities with a strong focus on environmental stewardship. TheCompany adheres to industry-leading environmental guidelines andstrives to minimize its environmental footprint. Furthermore, Arborcontinues to work collaboratively with local tribes and otherstakeholders to ensure its activities are aligned with the needs andconcerns of the communities in which it operates.

Martin Demers, PGeo, registered in the Province ofQuébec (OGQ No. 770), a consultant to Arbor and a qualified personunder National Instrument 43-101 – Standards of Disclosure for MineralProjects , has reviewed the technical contents ofthis news release and has approved the disclosure of the technicalinformation contained herein.


Click Image To View Full Size

About Arbor Metals Corp.

Arbor Metals Corp. is a mining explorationcompany focused on developing high-value, geographically significantmineral projects worldwide. Arbor ispaving the way for advanced mineral exploration as it overseesworld-class mining projects. The Company is confident that combiningquality projects with proven strategies and a dedicated team willyield exceptional outcomes.

The Jarnet, Corvette Lake and St. Pierrelithium project s , located in theJames Bay region of Quebec, comprises 83map-designated claims, covering an area of approximately 5,606hectares. The projects are contiguous to the Corvette-FCI property,where diamond drilling has confirmed significant lithiummineralization representing one of the highest-profile lithiumexploration projects in the sector.

The Kemlee LakeLithium project isstrategically located three kilometers east of Rock Tech LithiumInc.'s Aumacho claim blocks and twelve kilometers south of the GeorgiaLake Project.  The Project shares many geological similarities withthe prolific Georgia Lake deposit, including bedrock geology and thepresence of massive intrusive dykes. The primary target at the Projectwill be spodumene-bearing pegmatites hosted in metasediments.

For further information, contact Mark Ferguson, ChiefExecutive Officer, at info@arbormetalscorp.com , or 403.852.4869, or visit theCompany’s website at www.arbormetalscorp.com .

On behalf of the Board,

Arbor Metals Corp.

Mark Ferguson, Chief Executive Officer

Neither the TSX Venture Exchange norits Regulation Services Provider (as that term is defined in policiesof the TSX Venture Exchange) accepts responsibility for the adequacyor accuracy of this release.

This news release may containcertain “Forward-Looking Statements” within the meaning of theUnited States Private Securities Litigation Reform Act of 1995 andapplicable Canadian securities laws.  When or if used in this newsrelease, the words “anticipate”, “believe”, “estimate”,“expect”, “target, “plan”, “forecast”, “may”,“schedule” and similar words or expressions identifyforward-looking statements or information.  These forward-lookingstatements or information may relate to further exploration of theJarnet Lithium Project, the receipt of anticipated assay results, andother factors or information.  Such statements represent theCompany’s current views with respect to future events and arenecessarily based upon a number of assumptions and estimates that,while considered reasonable by the Company, are inherently subject tosignificant business, economic, competitive, political and socialrisks, contingencies and uncertainties. Many factors, both known andunknown, could cause results, performance, or achievements to bematerially different from the results, performance or achievementsthat are or may be expressed or implied by such forward-lookingstatements. The Company does not intend, and does not assume anyobligation, to update these forward-looking statements or informationto reflect changes in assumptions or changes in circumstances or anyother events affecting such statements and information other than asrequired by applicable laws, rules and regulations.

Copyright (c) 2025 TheNewswire - All rights reserved.

Arbor Realty Trust

NASDAQ: ABR

ABR Trading

-4.34% G/L:

$5.285 Last:

2,257,991 Volume:

$5.51 Open:

mwn-alerts Ad 300

ABR Latest News

ABR Stock Data

$1,533,392,825
188,273,631
0.16%
133
N/A
Mortgage REITs
Finance
US
Uniondale

Subscribe to Our Newsletter

Link Market Wire News to Your X Account

Download The Market Wire News App